148-22 Archer Avenue
Queens, NY 11435BBL 4-09998-0110Map
Owner of record: Archer Ave Realty De, LLC
148-22 Archer Avenue is a hotel built in 2016 in Queens, 11435. The owner of record is Archer Ave Realty De, LLC. HPD has recorded 2 housing violations here, most recently on May 11, 2026.
- HPD violations
- 2
- DOB violations
- 20
- ECB violations
- 78
- HPD complaints
- 2
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 2
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 11, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 16, 2025
Closed — Violation dismissed
DOB building violations · 20
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 22, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Construction other optional
Borough commissioners notice of order to stop work immediately due to suspension of contracters license for job # 420857399
Dec 30, 2021
Dob violation - dismissed - Construction other optional
Borough commissioners notice of order to stop work immediately due to suspension of contracters license for job # 421645198
Dec 30, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 12, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 12, 2018
Dob violation - dismissed - Construction other optional
C-construction other optional
Jun 20, 2018
Vp*-violation unserved ecb- dismissed
Show 10 more ↓
- Construction other optional
C-construction other optional
Jun 20, 2018
Vp*-violation unserved ecb- dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 9, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 9, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 3, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 3, 2017
Dob violation - dismissed - Plumbing none
Access to premises to inspect approved work under active permit #421048663 denied. inspection time 03:35pm on above date. provide access to department personnel
Feb 14, 2017
Dob violation - dismissed - Construction other optional
C-construction other optional
Feb 8, 2017
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Feb 8, 2017
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Feb 8, 2017
Vp*-violation unserved ecb- dismissed - Electric signs none
A.b
Sep 30, 1988
Dob violation - dismissed
ECB violations · 78
- Class - 2
Atoi observed in mechanical rooms floors 1 thru 15 pvc pipe used on hot water heaters per pc 701.9. plastic pipe. plastic piping and fittings shall not be used., repair and/or replace
Sep 24, 2026 · Penalty $1,250
Active - Class - 2
Atio observed in cellar laundry room flex pipe used on dryers vents . per mc 504.10 rigid metal ductwork shall be installed within the shaft to convey the exhaust. the ductwork shall be con structed of sheet st
Sep 24, 2026 · Penalty $1,250
Active - Class - 2
Failure to comply with commissioner's order to file a certificate of correction with department of building for summons 39139150p., file a certificate of correction
Dec 18, 2025 · Penalty $1,250
Resolve - Class - 2
Failure to comply with commissioner's order to file a certificate of correction with department of building for summons 39139153k., file a certificate of correction
Dec 18, 2025 · Penalty $1,250
Resolve - Class - 1
Failure to maintain building in code-compliant manner. discovered carbon monoxide leak at hot water heater tank and 3th an 4th floors. potential hazards., repair and/replace
Oct 7, 2025 · Penalty $2,500
Resolve - Class - 2
Class 2 items: lock missing on car station key switch door, install. top floor access switch label worn, replace label. emergency light test button missing, install.
Oct 7, 2025
Resolve - Class - 2
Class 2: in-car access switch inoperative, car failed to return to normal operation after inspection, repair and restore service.
Oct 7, 2025
Resolve - Class - 2
Class 2 items: top floor slow speed door bottom guides (gibs) fire retainers not bent down, repair as needed. same door sitting too high above the sill, adjust to 1/4" clearance. top floor access switch label w
Oct 7, 2025
Resolve - Class - 2
Exit door not self-closing. observed non self closing doors located at boiler room on floor 15th. potential fire hazard., repair/replace door
Feb 21, 2025 · Penalty $625
Resolve - Class - 2
I observed in the roof top boiler/ pump room the failure to protect the electrical equipment pup#3 from deteriorating agents as per ec 110.11. photos taken.; ec 110.11, comply with ec code; repair/ remove deter
Feb 20, 2025 · Penalty $800
Active
Show 40 more ↓
- Class - 1
I observed in the rooftop boiler room no fresh air ventilation as required where there is the installation of gas piping. as per fgc., repair and/replace; provide ventilation for the gas piping.
Feb 20, 2025 · Penalty $2,500
Resolve - Class - 2
Failure to maintain building in code-compliant manner. observed active leak from roof level. leak conintued in to boiler room on 15th floor. oiler leaking on 2nd floor. potential slip hazards., repair and/or re
Feb 20, 2025 · Penalty $1,250
Resolve - Class - 1
I observed on all floors the failure to provide a remote shutdown at the point of egress for all the water heaters. also noted the remote switch for the rooftop burner units defective/ not in use. this is an im
Feb 20, 2025 · Penalty $2,500
Resolve - Class - 2
I observed in the closet above the garage em panel the failure to properly terminate the electrical conduit supplying power to the stairway heaters. as required the proper connection provides both mechanical an
Feb 20, 2025 · Penalty $1,200
Active - Class - 2
I observed the wall switch installed in the boiler room shut off the lighting in the corridor outside this is improper wiring as the hall shall be illuminated at all times at the points of egress. photos taken,
Feb 20, 2025 · Penalty $800
Active - Class - 2
I observed in all the mechanical rooms the failure to provide gfci outlets as required for the protection of service and maintenance personnel. photos taken., install gfc1 protection; install/provide gfci prote
Feb 20, 2025
Resolve - Class - 1
I observed in the 13th floor mechanical room and the garage em panel closet exposed, energized conductors. photos taken., provide proper temporary support; properly protect conductors from contact.
Feb 20, 2025
Resolve - Class - 1
Failure to maintain building in code-compliant manner: no fire stopping per bc 712.3 (2014 code); 27-345; bc 711.2.4 (2022 code. observed hole penetrations throughout building. potential fire hazard., provide/m
Feb 20, 2025 · Penalty $2,500
Resolve - Class - 1
I observed on the roof the unpermitted use of flexible cords to supply power to permanently installed equipment (mta monitoring equipment) flexible cords shall be used for temporary or portable equipment. this
Feb 20, 2025 · Penalty $1,600
Resolve - Class - 1
Failure to submit the required parking structure initial observation report for an existing parking structure documenting the conditions of psid#q0003055 by the august 1,2024 deadline.to date,the department has
Oct 1, 2024
Resolve - Class - 2
3307.6.5.8 periodic inpsection of sws(6 months) @the time of my inspection on an active job site. i observed the sws @exp#1. as i inspect & review sheds log book it was shown that the last inspection made was
Dec 30, 2019
Resolve - Class - 2
Smoking @construction/demolition site @the time of my inspection on active job site. i observed during the inspection evidence of smoking was done on the job site locations observed was on the roof top lvl and
Dec 30, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements.at time of inspection i observed in cellar level large quantities of debris at different areas on floor scattered and some stored in a hazardou
Nov 1, 2019
Resolve - Class - 2
At the time of inspection respondent failed to make the proper notification for mobile crane after may 1 2018 to the department for crane working under cn #370/18 respondent notified department of their arri
Jan 9, 2019 · Penalty $2,500
Resolve - Class - 1
Guardrails at the time of my inspection of a 15 story building currently at roof level with construction operations in progress. i observed guardrails removed from in front of the upper elevator shaft on multip
Sep 19, 2018 · Penalty $5,000
Resolve - Class - 1
3301.6 no design sizes and capacity of materials: at the time of my inspection of a 15 story building currently at roof level with construction operations in progress: i observed a temp platform used to cross
Sep 19, 2018 · Penalty $2,500
Resolve - Class - 1
Housekeeping: at the time of my inspection of a 15 story building currently at roof level with construction operaitons in progress i observed inadequate housekeeping throughout the building materials not neatly
Sep 19, 2018 · Penalty $2,500
Resolve - Class - 2
Sws maintenance, debris, storage, sharp edges. at time of my inspection of a 15 story building at roof level with construction operations in progress i observed materials and debris on top of the sidewalk she
Sep 19, 2018
Resolve - Class - 2
Temp lighting: at the time of my inspeciton of a 15story building at roof level with construction operations in progress. i observed dark area with no temp lighting provided at cellar and basement levels and
Sep 19, 2018 · Penalty $1,280
Resolve - Class - 1
Inadequate safety measures; operation of crane in an unsafe manner. attime of inspection a knuckle boom crane was installed on 149 st in theprocess of unloading rebar from its own trailer. the knuckle boom was
Sep 18, 2018 · Penalty $10,000
Resolve - Class - 1
(cease use)100.r.07,100.m.07,68.m.07,100.b.07:(100-r-07)hoist being operated by labores and other unauthroized person illegal use.(100-m-07)missing maintenance cautral program(68-m07)provide missing maintenance
Sep 11, 2018 · Penalty $10,000
Resolve - Class - 1
Guardrails(missing/inadequate)at time of inspection of new 15 sty bldgactive jobsite bldg topped off w/windows installed. i observed at rooflevel inadequate guard system throughout roof. consisting of inadequat
Jul 16, 2018 · Penalty $5,000
Resolve - Class - 1
Sec. 3304.3 standing water. at time of inspection of new 15 sty bldg active jobsite bldg topped off w/windows installed. i observed at cellar level. standing water approx 2"deep at various locations. this condi
Jul 16, 2018 · Penalty $2,500
Resolve - Class - 1
Sec. 3301.2 holes not covered. at time of inspection of new 15 sty bldg active jobsite bldg topped & glass windows installed. i observed at numerious floors & different locations. holes greater than 2"wide. thi
Jul 16, 2018 · Penalty $2,500
Resolve - Class - 2
1rcny3319-01(g)(7)(i)michael lombardo pe#090287 failed to submit required cd8 signoff ina timely manner allowing crane to operate without a certificte of onsite inspection above cd8 cn#370-18 was signed off on
Jun 23, 2018
Resolve - Class - 1
Bc3314.4.4.5 dislodgement. note: at the time of my inspection of an active jobsite, i observed that the supported pipe scaffold working platforms were not clean as required and there was debris on the working p
Jun 19, 2018 · Penalty $2,500
Resolve - Class - 1
Bc3301.2 control access zone (window at exp #1). note: at the time of my inspection of an active job site. the limit arm to control the opening at 15th, 13th and 9th floor and with no guardrails on the window.
Jun 19, 2018 · Penalty $2,500
Resolve - Class - 1
Bc3307.6.5.8 periodic inspection. note: at the time of my inspection of an active job site. upon request for periodic sidewalk shed inspection report, what was provided was performed on the 06/19/2017. sidewalk
Jun 19, 2018 · Penalty $2,500
Resolve - Class - 1
Bc3314.8.1 guardrails system for supported scaffold. note: at the time of my inspection of an active job site, i observed missing guardrails, toe boards and end rails at different locations of the supported sca
Jun 19, 2018 · Penalty $2,500
Resolve - Class - 2
Housekeeping. note: at the time of my inspection of an active jobsite, i observed construction debris at different floors where no work was performed. rem: provide and maintain housekeeping as required.
Jun 19, 2018
Resolve - Class - 1
Bc 3301.6 failure to provide design drawing @time of insp observed active jobsite of new 15 story bldg.no design drawing provided for pulley/mechancial hoist being used @15 story.design drawing will show detail
Jun 9, 2018 · Penalty $2,500
Resolve - Class - 1
Bc 3301.2 holes not covered @time of insp of new 15 story bldg active jobsite bldg topped off i observed numerous holes on numerous fls throughout jobsite not covered larger than 2" wide,this condition creates
Jun 9, 2018 · Penalty $2,500
Resolve - Class - 2
Bc 3303.2.3.1 temp lighting @time of insp of new 15 story bldg active jobsite.bldg topped off i oberved lights out @8th sty & stairs.this condition of no lights creates a potential trip/fall hazard to workers a
Jun 9, 2018
Resolve - Class - 1
Housekeeping @time of insp of new 15 story bldg active jobsite. bldg topped off. i observed large amounts of debris stored & scattered throughout entire site mostly @hoist area consisting of sheetrock & cardboa
Jun 9, 2018 · Penalty $2,500
Resolve - Class - 1
Housekeeping. at upper floors observed debris consisting of 2x4's and alot of sheetrock cutting. at time of inspection no one working at these floors and due to amount of pieces of sheetrock could not have been
Mar 13, 2018 · Penalty $2,500
Resolve - Class - 1
Penetrations/holes/openings. at time of inspection observed penetrations throughout nb of more than 2" creating a condition where tools or debris could fall through and injure anyone working below. largest open
Mar 13, 2018 · Penalty $10,000
Resolve - Class - 1
Guardrails-inadequate. at time of inspection observed guardrails of 2x4 were at incorrect heights, cable guardrails not attached, too much slack, not taut, with give of more than 2". this condition observed pre
Mar 13, 2018 · Penalty $5,000
Resolve - Class - 1
Bc3301.1.2 propane tank - fdny - general - no permit. observed propane tank attached to forklift previous ecb vio #35299638x written for failure to provide fdny permit for propane onsite. no permit obtained. re
Mar 13, 2018 · Penalty $2,500
Resolve - Class - 2
Sidewalk shed lighting pedestrian protection at time of inspection while writting other violations and daylight fading observed that sidewalk shed lighting did not turn on and prior to that time i observed
Feb 7, 2018 · Penalty $2,400
Resolve - Class - 1
Inadequate guardrails.at time of inspection observed guardrail missing at ramp entry area with hvac ductwork stacked and nothing to prevent it from falling.observed cable system not(taut)with give of more than
Feb 7, 2018 · Penalty $2,500
Resolve
Complaints
- Heat/hot water
Apartment only
Mar 11, 2026 · Apt APT101
Close - Heat/hot water
Apartment only
Jan 23, 2026 · Apt 1209
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Hotel (H2)
- Year built
- 2016
- Floors
- 15
- Residential units
- —
- Building area
- 203,782 ft²
- Lot area
- 18,000 ft²
- Zoning
- C6-4
- Community board
- 412
- Council district
- 27
- Block / lot
- 9998 / 110
- Assessed value
- $20,303,550
- Landmark / historic district
- No
HPD registration #434491, last renewed Jul 10, 2025.
Questions about 148-22 Archer Avenue
Who owns 148-22 Archer Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Archer Ave Realty De, LLC.
Does 148-22 Archer Avenue have violations?
Yes. NYC HPD has recorded 2 housing violations at this property.
Is 148-22 Archer Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 148-22 Archer Avenue built?
City records list 2016 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.