90-40 179 Place
Queens, NY 11432BBL 4-09895-0071Map
Owner of record: Burton M Singh
90-40 179 Place is an one-family home built in 1901 in Queens, 11432. It has 1 residential unit across 2 floors. The owner of record is Burton M Singh. HPD has recorded 53 housing violations here, most recently on October 9, 2026. 42 of the 50 most recent violations are still open.
- HPD violations
- 53
- DOB violations
- 0
- ECB violations
- 3
- HPD complaints
- 71
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 53
- BHazardous
Properly repair or replace the broken or defective countertop backsplash panel at the east wall in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from south at west
Oct 9, 2026 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from south at west
Oct 9, 2026 · Apt 2NDFLO
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall, north wall, 1st closet from south at west wall door in the private hallway located at apt 2ndflo, 2nd story, 1st apartment from south at west
Oct 9, 2026 · Apt 2NDFLO
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from south at west
Oct 9, 2026 · Apt 2NDFLO
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at west wall in the 1st room from east located at apt 2ndflo, 2nd story, 1st apartment from south at west
Oct 9, 2026 · Apt 2NDFLO
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door frame in the private hallway located at apt 2ndflo, 2nd story, 1st apartment from south at west
Oct 9, 2026 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at south wall in the 1st room from east located at apt 2, 2nd story, 1st apartment from south at west
Sep 10, 2026 · Apt 2
Open — Civ14 mailed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the private hallway located at apt 2, 2nd story, 1st apartment from south at west
Sep 10, 2026 · Apt 2
Open — Nov certified late - BHazardous
Repair the roof so that it will not leak over ceiling in the private hallway located at apt 2, 2nd story, 1st apartment from south at west
Sep 10, 2026 · Apt 2
Open — Civ14 mailed - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Sep 10, 2026 · Apt 2
Open — Civ14 mailed
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls, ceiling and trim. in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Sep 10, 2026 · Apt 2
Open — Civ14 mailed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the private hallway located at apt 2ndflo, 2nd story, 1st apartment from south at west
Aug 14, 2026 · Apt 2NDFLO
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at south wall in the 1st room from east located at apt 2ndflo, 2nd story, 1st apartment from south at west
Aug 14, 2026 · Apt 2NDFLO
Open — Nov certified late - BHazardous
Properly secure the loose washbasin at west wall in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from south at west
Aug 14, 2026 · Apt 2NDFLO
Open — Nov certified late - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from east located at apt 2ndflo, 2nd story, 1st apartment from south at west
Aug 14, 2026 · Apt 2NDFLO
Open — Nov certified late - ANon-hazardous
Properly secure the loose wash basin in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from south at west
Mar 7, 2026 · Apt 2NDFLO
Open — Nov certified late - BHazardous
Repair the leaky and/or defective water supply pipe at wash basin in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from south at west
Mar 7, 2026 · Apt 2NDFLO
Open — Nov certified late - ANon-hazardous
Properly repair with similar material the broken or defective wood casing around door frame at north wall in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
May 31, 2025 · Apt 2
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in wasteline at bathtub in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
May 31, 2025 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective electrical outlet at east wall in the 2nd room from east located at apt 2, 2nd story, 1st apartment from south at west
May 31, 2025 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the foyer located at apt 2, 2nd story, 1st apartment from south at west
May 31, 2025 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, south wall in the 1st room from east located at apt 2, 2nd story, 1st apartment from south at west
May 31, 2025 · Apt 2
Open — Certification postponment granted - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2, 2nd story, 1st apartment from south at west
May 31, 2025 · Apt 2
Open — Lead docs submitted, not acceptable - ANon-hazardous
Properly repair with similar material the broken or defective wood casing around door frame in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
May 20, 2025 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Abate the nuisance consisting of wall erected from floor to ceiling obstructing window at south wall in the 1st room from east located at apt 2, 2nd story, 1st apartment from south at west
May 20, 2025 · Apt 2
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... all walls and ceiling at closet at north wall in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Dec 20, 2024 · Apt 2
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color all walls and ceiling at closet in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Dec 20, 2024 · Apt 2
Open — Invalid certification - ANon-hazardous
Properly repair or replace the broken or defective electrical outlet cover plate at south wall in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Dec 20, 2024 · Apt 2
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective spring balance at lower window sash at west 1 window in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Dec 20, 2024 · Apt 2
Open — Invalid certification - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Dec 20, 2024 · Apt 2
Open — Invalid certification - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from east located at apt 2, 2nd story, 1st apartment from south at west
Dec 20, 2024 · Apt 2
Open — Certification postponment denied - BHazardous
Repair the roof so that it will not leak over ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Dec 20, 2024 · Apt 2
Open — Certification postponment denied - BHazardous
Properly repair or replace the broken or defective spring balance at lower window sash at west 2 window in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Dec 20, 2024 · Apt 2
Open — Invalid certification - BHazardous
Properly repair or replace the broken or defective spring balance at lower window sash at south 1 window in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Dec 20, 2024 · Apt 2
Open — Invalid certification - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles at south wall in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Dec 20, 2024 · Apt 2
Open — Invalid certification - BHazardous
Properly repair with similar material the broken or defective ceramic floor saddle in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Dec 20, 2024 · Apt 2
Open — Invalid certification - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and all walls at closet at west wall in the private hallway located at apt 2, 2nd story, 1st apartment from south at west
Dec 20, 2024 · Apt 2
Open — Invalid certification - BHazardous
Properly repair with similar material the broken or defective spring balance at lower window sash at south 1 window in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Dec 20, 2024 · Apt 2
Open — Invalid certification - BHazardous
Properly repair or replace the broken or defective spring balance at lower window sash at east 1 window in the 1st room from east located at apt 2, 2nd story, 1st apartment from south at west
Dec 20, 2024 · Apt 2
Open — Invalid certification - BHazardous
Properly repair or replace the broken or defective spring balance at lower window sash at east 2 window in the 1st room from east located at apt 2, 2nd story, 1st apartment from south at west
Dec 20, 2024 · Apt 2
Open — Invalid certification - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 1st room from east located at apt 2, 2nd story, 1st apartment from south at west
Dec 20, 2024 · Apt 2
Open — Invalid certification - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling at closet at north wall in the 1st room from east located at apt 2, 2nd story, 1st apartment from south at west
Dec 20, 2024 · Apt 2
Open — Invalid certification - BHazardous
Properly repair with similar material the broken or defective caulking between floor and baseboards in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Dec 20, 2024 · Apt 2
Open — Invalid certification - BHazardous
Properly repair or replace the broken or defective drop ceiling in the 1st room from east located at apt 2, 2nd story, 1st apartment from south at west
Dec 20, 2024 · Apt 2
Open — Invalid certification - BHazardous
Properly repair or replace the broken or defective spring balance at lower window sash at south 1 window in the 2nd room from east located at apt 2, 2nd story, 1st apartment from south at west
Dec 20, 2024 · Apt 2
Open — Invalid certification - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 2, 2024
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective acoustical tile suspended ceiling in the 2nd room from east located at apt 2floor, 2nd story, 1st apartment from south at west
Nov 29, 2024 · Apt 2FLOOR
Open — Nov certified late - BHazardous
Properly repair or replace the broken or defective counter balance lower sash of window in the 2nd room from east located at apt 2floor, 2nd story, 1st apartment from south at west
Nov 29, 2024 · Apt 2FLOOR
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and north wall inside closet in the 1st room from east located at apt 2floor, 2nd story, 1st apartment from south at west
Nov 29, 2024 · Apt 2FLOOR
Open — Nov certified late - ANon-hazardous
Properly repair with similar material the broken or defective suspended acoustical tile ceiling in the 1st room from east located at apt 2floor, 2nd story, 1st apartment from south at west
Nov 29, 2024 · Apt 2FLOOR
Open — Nov certified late
DOB building violations · 0
No DOB violations on record
ECB violations · 3
- Class - 2
Failure to maintain building in code-compliant manner. at time of inspection, at the 2nd floor level observed broken striping ceiling. at front bedroom. also defected wood panel at 1st floor. remedy: repair/rep
Oct 10, 2026 · Penalty $1,250
Active - Class - 2
Rca issued 04/04/25 same respondent failure to maintain bldg in safe & code compliant 28-301.1, respondent has not made any appointments, or submitted proof of correction, prohibited locking devices installed o
Aug 25, 2026 · Penalty $1,250
Active - Class - 2
Rca issued 05/23/25 same respondent failure to maintain bldg safe & code-compliant 28-301.1, respondent has not made any appointments or submitted proof of correction wood slate panel collapsed at 2 fl apt onto
Aug 25, 2026 · Penalty $1,250
Active
Complaints
- Paint/plaster
Wall
Oct 22, 2026 · Apt 2
Open - Water leak
Slow leak
Oct 22, 2026 · Apt 2
Open - Paint/plaster
Ceiling
Oct 22, 2026 · Apt 2
Open - Paint/plaster
Wall
Oct 9, 2026 · Apt 2FLOOR
Open - Water leak
Slow leak
Oct 9, 2026 · Apt 2FLOOR
Open - Safety
Fire escape
Oct 9, 2026 · Apt 2NDFLO
Open - Water leak
Heavy flow
Sep 30, 2026 · Apt 2FLOOR
Close - Paint/plaster
Wall
Sep 21, 2026 · Apt 2NDFLO
Close - Paint/plaster
Wall
Sep 21, 2026 · Apt 2NDFLO
Close - Electric
Lighting
Sep 8, 2026 · Apt 2
Close
Show 40 more ↓
- Plumbing
Basin/sink
Sep 8, 2026 · Apt 2
Close - Plumbing
Basin/sink
Sep 8, 2026 · Apt 2
Close - Door/window
Window frame
Sep 8, 2026 · Apt 2
Close - Water leak
Slow leak
Sep 8, 2026 · Apt 2
Close - Paint/plaster
Ceiling
Sep 8, 2026 · Apt 2
Close - Paint/plaster
Wall
Sep 8, 2026 · Apt 2
Close - Paint/plaster
Ceiling
Aug 7, 2026 · Apt 2NDFLO
Close - Paint/plaster
Wall
Jul 21, 2026 · Apt 2NDFLO
Close - Paint/plaster
Wall
Jul 21, 2026 · Apt 2NDFLO
Close - Water leak
Heavy flow
Jul 21, 2026 · Apt 2NDFLO
Close - Plumbing
Basin/sink
Jul 21, 2026 · Apt 2NDFLO
Close - Paint/plaster
Ceiling
Jul 21, 2026 · Apt 2NDFLO
Close - Paint/plaster
Ceiling
Jul 21, 2026 · Apt 2NDFLO
Close - Plumbing
Basin/sink
Jul 21, 2026 · Apt 2NDFLO
Close - Unsanitary condition
Pests
Jul 21, 2026 · Apt 2NDFLO
Close - Unsanitary condition
Pests
Jul 21, 2026 · Apt 2NDFLO
Close - Flooring/stairs
Floor
Jul 21, 2026 · Apt 2NDFLO
Close - Appliance
Refrigerator
Jul 21, 2026 · Apt 2NDFLO
Close - Appliance
Electric/gas range
Jul 21, 2026 · Apt 2NDFLO
Close - Electric
Wiring
Jul 21, 2026 · Apt 2NDFLO
Close - Flooring/stairs
Floor
Jul 21, 2026 · Apt 2NDFLO
Close - Plumbing
Water supply
Jul 21, 2026 · Apt 2NDFLO
Close - Plumbing
Basin/sink
Jul 21, 2026 · Apt 2NDFLO
Close - Paint/plaster
Wall
Jul 21, 2026 · Apt 2NDFLO
Close - Paint/plaster
Ceiling
Jul 21, 2026 · Apt 2NDFLO
Close - Unsanitary condition
Pests
Jul 21, 2026 · Apt 2NDFLO
Close - Door/window
Window frame
Jul 21, 2026 · Apt 2NDFLO
Close - Electric
Outlet/switch
Jul 21, 2026 · Apt 2NDFLO
Close - Door/window
Window frame
Jul 21, 2026 · Apt 2NDFLO
Close - Paint/plaster
Wall
Feb 20, 2026 · Apt 2NDFLO
Close - Water leak
Heavy flow
Feb 20, 2026 · Apt 2NDFLO
Close - Electric
Outlet/switch
Feb 20, 2026 · Apt 2NDFLO
Close - Flooring/stairs
Floor
Feb 20, 2026 · Apt 2NDFLO
Close - Paint/plaster
Ceiling
Feb 20, 2026 · Apt 2NDFLO
Close - Plumbing
Water supply
Aug 7, 2025 · Apt SECOND
Close - Plumbing
Water supply
Aug 6, 2025 · Apt 2FLOOR
Close - Flooring/stairs
Floor
Jul 18, 2025 · Apt SECOND
Close - Paint/plaster
Wall
Jul 18, 2025 · Apt SECOND
Close - Flooring/stairs
Floor
Jul 18, 2025 · Apt SECOND
Close - Unsanitary condition
Mold
Jul 18, 2025 · Apt SECOND
Close
Sales history
No recorded sales in our data
Building details
- Building type
- One-family home (A5)
- Year built
- 1901
- Floors
- 2
- Residential units
- 1
- Building area
- 1,552 ft²
- Lot area
- 1,758 ft²
- Zoning
- R4-1
- Community board
- 412
- Council district
- 23
- Block / lot
- 9895 / 71
- Assessed value
- $48,420
- Landmark / historic district
- No
HPD registration #928676, last renewed Jul 3, 2025.
Questions about 90-40 179 Place
Who owns 90-40 179 Place?
The owner of record in NYC Department of City Planning PLUTO data is Burton M Singh.
Does 90-40 179 Place have violations?
Yes. NYC HPD has recorded 53 housing violations at this property.
Is 90-40 179 Place rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 90-40 179 Place built?
City records list 1901 as the year it was built.
How many apartments are in 90-40 179 Place?
It has 1 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.