90-19 169 Street
Queens, NY 11432BBL 4-09802-0027Map
Owner of record: Karmakar, Joy Gopal
90-19 169 Street is a walk-up apartment building built in 1931 in Queens, 11432. It has 4 residential units across 2 floors. The owner of record is Karmakar, Joy Gopal. HPD has recorded 58 housing violations here, most recently on June 12, 2025. 13 of the 50 most recent violations are still open.
- HPD violations
- 58
- DOB violations
- 0
- ECB violations
- 3
- HPD complaints
- 113
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 58
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective building entrance , 1st story
Nov 6, 2023
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening padlockable gate at southfront yard.
Nov 6, 2023
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective concrete tread 4th from bottom at stoop at building front
Apr 10, 2023
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective concrete tread 2nd from bottom at stoop at building front
Apr 10, 2023
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective concrete tread 1st from bottom at stoop at building front
Apr 10, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 28, 2023
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective the building entrance door at public hall, 1st story
Dec 19, 2022
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective building entrance door at public hall, 1st story
Nov 19, 2022
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at vestubule , 1st story
Oct 28, 2022
Closed — Violation closed
Show 40 more ↓
- ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Oct 23, 2022
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Oct 23, 2022
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Oct 4, 2022
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall
Oct 4, 2022
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective building entrance at public hall, 1st story
Mar 27, 2022
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Mar 27, 2022
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Mar 27, 2022
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system .. at public hall, 1st story
Mar 27, 2022
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 4, 2022
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardent material at ceiling at public hall, 1st story
Jan 16, 2022
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story
Jan 16, 2022
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 1st story
Jan 16, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 15, 2021
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing. located at apt 1r, 1st story
Feb 1, 2017 · Apt 1R
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 1r, 1st story
Feb 1, 2017 · Apt 1R
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of roaches located at apt 1r, 1st story
Feb 1, 2017 · Apt 1R
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of mice located at apt 1r, 1st story
Feb 1, 2017 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system cellar door locked at public hall, 1st story
Feb 1, 2017
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1r, 1st story
Feb 1, 2017 · Apt 1R
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Mar 5, 2016
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1r, 1st story
Mar 5, 2016 · Apt 1R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling in the bathroom located at apt 1r, 1st story
Mar 5, 2016 · Apt 1R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling in the bathroom located at apt 1r, 1st story
Mar 5, 2016 · Apt 1R
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 1r, 1st story
Mar 5, 2016 · Apt 1R
Open — Nov sent out - BHazardous
Remove the illegal fastening double cylinder lock on door at entrance to bldg. , 1st story
Oct 30, 2015
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing bulb of electric light fixture at ceiling at public hall, 1st story
Jun 10, 2015
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening consisting of double cylynder lock on front entrance door from street at public hall, 1st story
Jun 10, 2015
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the bathroom located at apt 2f, 2nd story, apartment at west
Mar 5, 2014 · Apt 2F
Open — Nov certified late - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the 3rd room from east at north located at apt 2f, 2nd story, apartment at west
Mar 5, 2014 · Apt 2F
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the 2nd room from east at south located at apt 2f, 2nd story, apartment at west
Mar 5, 2014 · Apt 2F
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at the ceiling and all walls in the bathroom located at apt 2f, 2nd story, apartment at west
Mar 5, 2014 · Apt 2F
Open — Nov certified late - BHazardous
Abate the nuisance consisting of mice located at apt 2f, 2nd story, apartment at west
Mar 5, 2014 · Apt 2F
Open — Nov certified late - BHazardous
Abate the nuisance consisting of roaches located at apt 2f, 2nd story, apartment at west
Mar 5, 2014 · Apt 2F
Open — Nov certified late - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperative located at apt 2r, 2nd story, 1st apartment from north at east
Feb 5, 2014 · Apt 2R
Open — Nov sent out - BHazardous
Repair or replace the smoke detector inoperative located at apt 2r, 2nd story, 1st apartment from north at east
Feb 5, 2014 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 5; no one way screws, no stops located at apt 2r, 2nd story, 1st apartment from north at east
Feb 5, 2014 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system ...
Jan 28, 2014
Open — Nov certified late - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4; wg to replace = 0; wg to repair = 2; in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east
Jan 28, 2014 · Apt 2R
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east
Jan 28, 2014 · Apt 2R
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east
Jan 28, 2014 · Apt 2R
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 3
- Class - 1
Work w/out permit. noted: @ cellar level installed waste lines for shower. removed water & waste lines for residential sink, washing machine& gas line for gas dryer @ laundry area. erected full partitious w/ do
Jun 22, 2016 · Penalty $1,600
Resolve - Hazardous
Residence altered occupancy as a dwelling for more than the legally approved of families dept of buildings records coq#197842 indicates residence to be legally approved for occupancy as a (4)family residnece is
Sep 25, 2004
Resolve - Hazardous
Work without permit work noted at cellar level erected partitions to create (4)rooms and installed water and waste lines for(3) piece bathroom (toilet sink shower)and residential sink also installed gas line fo
Sep 25, 2004
Resolve
Complaints
- Heat/hot water
Entire building
Nov 5, 2023 · Apt BLDG
Close - Safety
Fire escape
Nov 5, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Apr 8, 2023 · Apt 1R
Close - Heat/hot water
Entire building
Dec 14, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 16, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 28, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 20, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 5, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 5, 2022 · Apt 519
Close - Heat/hot water
Entire building
Oct 4, 2022 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Oct 3, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 3, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 2, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 3, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 24, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 11, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 4, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 2, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 1, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 6, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 6, 2021 · Apt BLDG
Close - Plumbing
Water supply
Nov 6, 2019 · Apt 1R
Close - Heat/hot water
Entire building
Jan 30, 2018 · Apt 1C
Close - Heat/hot water
Entire building
Dec 18, 2017 · Apt 1R
Close - Heat/hot water
Entire building
Jan 30, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 28, 2017 · Apt 1R
Close - Heat/hot water
Entire building
Nov 12, 2016 · Apt 1R
Close - Unsanitary condition
Pests
Feb 26, 2016 · Apt 1R
Close - Water leak
Slow leak
Feb 26, 2016 · Apt 1R
Close - Water leak
Slow leak
Feb 26, 2016 · Apt 1R
Close - Flooring/stairs
Floor
Feb 26, 2016 · Apt 1R
Close - Flooring/stairs
Floor
Feb 26, 2016 · Apt 1R
Close - Flooring/stairs
Floor
Feb 26, 2016 · Apt 1R
Close - Door/window
Door
Feb 26, 2016 · Apt 1R
Close - Water leak
Slow leak
Feb 21, 2016 · Apt 1R
Close - Water leak
Slow leak
Feb 21, 2016 · Apt 1R
Close - Unsanitary condition
Pests
Feb 21, 2016 · Apt 1R
Close - Door/window
Door
Feb 21, 2016 · Apt 1R
Close - Heat/hot water
Entire building
Feb 16, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 16, 2016 · Apt 1R
Close - Unsanitary condition
Mold
Oct 21, 2015 · Apt BAST
Close - General
Ventilation system
Oct 21, 2015 · Apt BAST
Close - Safety
Carbon monoxide detector
Oct 21, 2015 · Apt BAST
Close - Unsanitary condition
Garbage/recycling storage
Jun 8, 2015 · Apt BLDG
Close - Door/window
Window frame
Jun 3, 2015 · Apt BAST
Close - Unsanitary condition
Mold
Jun 3, 2015 · Apt BAST
Close - General
Ventilation system
Jun 3, 2015 · Apt BAST
Close - Safety
Carbon monoxide detector
Jun 3, 2015 · Apt BAST
Close - Heat/hot water
Entire building
Mar 30, 2014 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C3)
- Year built
- 1931
- Floors
- 2
- Residential units
- 4
- Building area
- 3,120 ft²
- Lot area
- 3,625 ft²
- Zoning
- R6A
- Community board
- 412
- Council district
- 27
- Block / lot
- 9802 / 27
- Assessed value
- $257,400
- Landmark / historic district
- No
HPD registration #418631, last renewed Aug 27, 2025.
Questions about 90-19 169 Street
Who owns 90-19 169 Street?
The owner of record in NYC Department of City Planning PLUTO data is Karmakar, Joy Gopal.
Does 90-19 169 Street have violations?
Yes. NYC HPD has recorded 58 housing violations at this property.
Is 90-19 169 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 90-19 169 Street built?
City records list 1931 as the year it was built.
How many apartments are in 90-19 169 Street?
It has 4 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.