roofy

89-48 164 Street

Queens, NY 11432BBL 4-09793-0078Map

Owner of record: First Jamaica Community

89-48 164 Street is a store building built in 1949 in Queens, 11432. The owner of record is First Jamaica Community. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
11
ECB violations
24
HPD complaints
0

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 11

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 29, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 29, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 6, 2019

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Sep 19, 2018

    Vp*-violation unserved ecb- dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 25, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 11, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Construction other optional

    Joseph denardis, eor - submit the entire building structural calcula- tions and the total concrete volume (cubic yards) for review before november 8, 2017

    Nov 1, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
Show 1 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 28, 1993

    Dob violation - dismissed

ECB violations · 24

  • Class - 2

    Sec. 3307.2.1 failure to comply w/dot regulations. at the time of my inspection at a 2 sty bldg under construction,i observed crane on the street lift in progress the dot permit states that the contractor is

    Apr 9, 2020

    Resolve
  • Class - 2

    Respondent failed to make the proper notification for mobile crane afer may 1, 2018 to the department. at time of inspection it was discovered tha tno mobile crane (cn 15418 ) was on site. notification was made

    Mar 18, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to safeguard-inadequate emergency egress. at time of inspection on an active site of a 12 story nb,i observed inadequate emergency egress for adjacent property,(2 story citibank),at rear,open access int

    Mar 8, 2019 · Penalty $10,000

    Resolve
  • Class - 2

    Contrary to design drawings. active site,pouring 10th fl perimeter wall,adjacent building emergency egress platform does not conform to design drawings. chain link fence and overhead protection are not indicate

    Mar 8, 2019 · Penalty $625

    Resolve
  • Class - 1

    Contrary to site safety plan. active site, pouring 10th floor perimeter wall, overhead protection missing at exposure 2 rear. remedy: complywith approved site safety plan/contact csc

    Mar 8, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures or temporary construction-no toe boards. at time of inspection at an active 12 sty construction site,i observed that there were missing toe boards at guar

    Nov 21, 2018 · Penalty $5,000

    Resolve
  • Class - 1

    Sec. 3301.1.2 fdny general(compress gas)at time of inspection of an active construction site,nb proposed 12 sty bldg & currently on the 5th fl decl level i observed compressed gas placed on the 4th fl slab cont

    Nov 21, 2018

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping. at time of inspection at anactive 12 sty construction site,i observed that there were construction debris such as loose styrofoams,re-bars,wood,wire ropes,brocken conc

    Nov 21, 2018 · Penalty $2,500

    Resolve
  • Class - 1

    Sec. 3301.1.2 fdny general(fire extinguishers)at time of inspection ofan active construction site,nb proposed 12 sty bldg & currently on the5th fl deck level. i observed fire extinguishers placed on floor slabs

    Nov 21, 2018

    Resolve
  • Class - 1

    Sec. 28-105.12.8 wokr contrary to site safety plan(ssp)at time of inspection of an active construction site,nb proposed 12 sty bldg currently on the 5th fl deck level, i observed the following on site contrary

    Nov 21, 2018 · Penalty $2,500

    Resolve
Show 14 more ↓
  • Class - 1

    Controlled access zone(caz)at time of inspection of an active construction site. nb proposed 12 sty bldg currently on the 5th fl deck level.i observed a crane lifting up planks onto the 5th fl while personnel

    Nov 21, 2018 · Penalty $10,000

    Resolve
  • Class - 2

    3307.2.1 failure to comply with the dot regulations: at the time of my inspection of a 12story building currently at hte 2nd floor deck with construction operations in progress. i observed a delivery truck of

    Sep 19, 2018

    Resolve
  • Class - 1

    3301.2 failure to institute and maintain safe operations.means of egress: at the time of my inspection of a 12 story bldg currenlty ath the 2nd floor/deck with construction operations in process. i observed exc

    Sep 19, 2018 · Penalty $2,500

    Resolve
  • Class - 1

    Work does not conform to approved construction documents or approved amendments. as noted: at time of inspection observed a-steel beam con nected to the concrete beam does not conform to the structural drawing

    Apr 26, 2018 · Penalty $2,500

    Resolve
  • Class - 1

    Bc 3301.7 failure to provide p.e approve design drawings for repair of concrete shear wall exp#2 adjacent stairwell @foundation level.as noted:@time of insp an active const site observe @foundation level exp#2,

    Apr 19, 2018 · Penalty $2,500

    Resolve
  • Class - 2

    Bc 3314.9.3 scaffold observed scaffold errected w/no base plates/levelers/screws jacks,scaffold errected in foundation along exp#2 w/4 sections all no screw jacks.rem:remove scaffold or install screw jacks.

    Dec 27, 2017

    Resolve
  • Class - 1

    Bc3301.2:adequate means of egress.note:at time of inspection of a 12 story bldg a tpartial foundation and excavation phase construction wok in progress.i observed ramp was blocked off by machinery progress.i ob

    Dec 5, 2017 · Penalty $1,600

    Resolve
  • Class - 1

    Bc3315.2.2:guardrail reqd-platforms.note:at time of inspection of a 12 story bldg at partial foundation and excavation phase constructon work in progress.i observed a working platform(makeshift)made of pieces o

    Dec 5, 2017 · Penalty $1,600

    Resolve
  • Class - 1

    Bc3315.1.5.:ramps and runway.note:at the time of my inspection of a 12 story bldg at partial foundation and excavation phase,construction work in progress. i observed ramp that abut motor vehicle was not provid

    Dec 5, 2017 · Penalty $1,600

    Resolve
  • Class - 2

    No conrete safety manager present @ site where 2,000 cubic yards of concrete will be poured as required.as noted:@ time of inspection on an active construction site observed under pinning,concrete spread footin

    Nov 9, 2017 · Penalty $600

    Resolve
  • Class - 2

    Work does not conform to approved construction documents or approved amendments. at the time of inspection the work observed did not conformto the approved plans or amendments. the plans on site show the underp

    Oct 16, 2017 · Penalty $250

    Resolve
  • Class - 2

    Sec. 28-104.7.1 failure to prepare & provide site-specific plans details & sequence of construction for underpinning. at the time of inspection the plans observed did not have a proper underpinning sequence. th

    Oct 16, 2017 · Penalty $400

    Resolve
  • Class - 1

    Bc3301.1.3.yodock barricades not as per manufacturer specifications.attime of inspection observed active job site excavation phase in progress.the yodock barricados provided for the temporary pedestrian walkway

    Sep 30, 2017 · Penalty $1,600

    Resolve
  • Non-hazardous

    Boiler section dirty

    Aug 29, 1989

    Resolve

Complaints

No HPD complaints in our records

Complaint data is still being backfilled from NYC Open Data.

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Store building (K7)
Year built
1949
Floors
2
Residential units
—
Building area
10,516 ft²
Lot area
5,271 ft²
Zoning
C4-4D
Community board
412
Council district
27
Block / lot
9793 / 78
Assessed value
$1,112,850
Landmark / historic district
No

Questions about 89-48 164 Street

Who owns 89-48 164 Street?

The owner of record in NYC Department of City Planning PLUTO data is First Jamaica Community.

Does 89-48 164 Street have violations?

NYC HPD has no housing violations on record for this property.

Is 89-48 164 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 89-48 164 Street built?

City records list 1949 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.