89-48 164 Street
Queens, NY 11432BBL 4-09793-0078Map
Owner of record: First Jamaica Community
89-48 164 Street is a store building built in 1949 in Queens, 11432. The owner of record is First Jamaica Community. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 11
- ECB violations
- 24
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 11
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 29, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 29, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 6, 2019
Dob violation - dismissed - Construction other optional
C-construction other optional
Sep 19, 2018
Vp*-violation unserved ecb- dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 25, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 11, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Construction other optional
Joseph denardis, eor - submit the entire building structural calcula- tions and the total concrete volume (cubic yards) for review before november 8, 2017
Nov 1, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed
Show 1 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - dismissed
ECB violations · 24
- Class - 2
Sec. 3307.2.1 failure to comply w/dot regulations. at the time of my inspection at a 2 sty bldg under construction,i observed crane on the street lift in progress the dot permit states that the contractor is
Apr 9, 2020
Resolve - Class - 2
Respondent failed to make the proper notification for mobile crane afer may 1, 2018 to the department. at time of inspection it was discovered tha tno mobile crane (cn 15418 ) was on site. notification was made
Mar 18, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to safeguard-inadequate emergency egress. at time of inspection on an active site of a 12 story nb,i observed inadequate emergency egress for adjacent property,(2 story citibank),at rear,open access int
Mar 8, 2019 · Penalty $10,000
Resolve - Class - 2
Contrary to design drawings. active site,pouring 10th fl perimeter wall,adjacent building emergency egress platform does not conform to design drawings. chain link fence and overhead protection are not indicate
Mar 8, 2019 · Penalty $625
Resolve - Class - 1
Contrary to site safety plan. active site, pouring 10th floor perimeter wall, overhead protection missing at exposure 2 rear. remedy: complywith approved site safety plan/contact csc
Mar 8, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction-no toe boards. at time of inspection at an active 12 sty construction site,i observed that there were missing toe boards at guar
Nov 21, 2018 · Penalty $5,000
Resolve - Class - 1
Sec. 3301.1.2 fdny general(compress gas)at time of inspection of an active construction site,nb proposed 12 sty bldg & currently on the 5th fl decl level i observed compressed gas placed on the 4th fl slab cont
Nov 21, 2018
Resolve - Class - 1
Failure to maintain adequate housekeeping. at time of inspection at anactive 12 sty construction site,i observed that there were construction debris such as loose styrofoams,re-bars,wood,wire ropes,brocken conc
Nov 21, 2018 · Penalty $2,500
Resolve - Class - 1
Sec. 3301.1.2 fdny general(fire extinguishers)at time of inspection ofan active construction site,nb proposed 12 sty bldg & currently on the5th fl deck level. i observed fire extinguishers placed on floor slabs
Nov 21, 2018
Resolve - Class - 1
Sec. 28-105.12.8 wokr contrary to site safety plan(ssp)at time of inspection of an active construction site,nb proposed 12 sty bldg currently on the 5th fl deck level, i observed the following on site contrary
Nov 21, 2018 · Penalty $2,500
Resolve
Show 14 more ↓
- Class - 1
Controlled access zone(caz)at time of inspection of an active construction site. nb proposed 12 sty bldg currently on the 5th fl deck level.i observed a crane lifting up planks onto the 5th fl while personnel
Nov 21, 2018 · Penalty $10,000
Resolve - Class - 2
3307.2.1 failure to comply with the dot regulations: at the time of my inspection of a 12story building currently at hte 2nd floor deck with construction operations in progress. i observed a delivery truck of
Sep 19, 2018
Resolve - Class - 1
3301.2 failure to institute and maintain safe operations.means of egress: at the time of my inspection of a 12 story bldg currenlty ath the 2nd floor/deck with construction operations in process. i observed exc
Sep 19, 2018 · Penalty $2,500
Resolve - Class - 1
Work does not conform to approved construction documents or approved amendments. as noted: at time of inspection observed a-steel beam con nected to the concrete beam does not conform to the structural drawing
Apr 26, 2018 · Penalty $2,500
Resolve - Class - 1
Bc 3301.7 failure to provide p.e approve design drawings for repair of concrete shear wall exp#2 adjacent stairwell @foundation level.as noted:@time of insp an active const site observe @foundation level exp#2,
Apr 19, 2018 · Penalty $2,500
Resolve - Class - 2
Bc 3314.9.3 scaffold observed scaffold errected w/no base plates/levelers/screws jacks,scaffold errected in foundation along exp#2 w/4 sections all no screw jacks.rem:remove scaffold or install screw jacks.
Dec 27, 2017
Resolve - Class - 1
Bc3301.2:adequate means of egress.note:at time of inspection of a 12 story bldg a tpartial foundation and excavation phase construction wok in progress.i observed ramp was blocked off by machinery progress.i ob
Dec 5, 2017 · Penalty $1,600
Resolve - Class - 1
Bc3315.2.2:guardrail reqd-platforms.note:at time of inspection of a 12 story bldg at partial foundation and excavation phase constructon work in progress.i observed a working platform(makeshift)made of pieces o
Dec 5, 2017 · Penalty $1,600
Resolve - Class - 1
Bc3315.1.5.:ramps and runway.note:at the time of my inspection of a 12 story bldg at partial foundation and excavation phase,construction work in progress. i observed ramp that abut motor vehicle was not provid
Dec 5, 2017 · Penalty $1,600
Resolve - Class - 2
No conrete safety manager present @ site where 2,000 cubic yards of concrete will be poured as required.as noted:@ time of inspection on an active construction site observed under pinning,concrete spread footin
Nov 9, 2017 · Penalty $600
Resolve - Class - 2
Work does not conform to approved construction documents or approved amendments. at the time of inspection the work observed did not conformto the approved plans or amendments. the plans on site show the underp
Oct 16, 2017 · Penalty $250
Resolve - Class - 2
Sec. 28-104.7.1 failure to prepare & provide site-specific plans details & sequence of construction for underpinning. at the time of inspection the plans observed did not have a proper underpinning sequence. th
Oct 16, 2017 · Penalty $400
Resolve - Class - 1
Bc3301.1.3.yodock barricades not as per manufacturer specifications.attime of inspection observed active job site excavation phase in progress.the yodock barricados provided for the temporary pedestrian walkway
Sep 30, 2017 · Penalty $1,600
Resolve - Non-hazardous
Boiler section dirty
Aug 29, 1989
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Store building (K7)
- Year built
- 1949
- Floors
- 2
- Residential units
- —
- Building area
- 10,516 ft²
- Lot area
- 5,271 ft²
- Zoning
- C4-4D
- Community board
- 412
- Council district
- 27
- Block / lot
- 9793 / 78
- Assessed value
- $1,112,850
- Landmark / historic district
- No
Questions about 89-48 164 Street
Who owns 89-48 164 Street?
The owner of record in NYC Department of City Planning PLUTO data is First Jamaica Community.
Does 89-48 164 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 89-48 164 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 89-48 164 Street built?
City records list 1949 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.