153-26 Hillside Avenue
Queens, NY 11432BBL 4-09763-0023Map
Owner of record: NYC School Construction Authority
153-26 Hillside Avenue is a school building built in 2010 in Queens, 11432. The owner of record is NYC School Construction Authority. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 43
- ECB violations
- 7
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 43
- Construction other optional
Structured renderd non compliant observed adjacent building 153-32 hil lside avenue exp # 4 bricks damaged, eroded and in danger to collapse onto school playground vacate school playground 20'x 120' entire area from exp.#4
Apr 17, 2024
Dob violation - active - Immediate emergency anythingoptional
Install tightboard fence along edge of planting area on west side of north playground to close off approx. 10 ft wide area from adjacent fire damaged building and return to corner of fire damaged building at exp 1. approx. 135 lf of fence total
Apr 1, 2022
Dob violation - active - Construction other optional
Structure rendered non-complaint .at time of inspection damage observed at adjacent building exposure#2 wall and bricks falling into backyard, this is in danger to further collapse. vacate 10' from wall entire planting area at backyard.
Mar 31, 2022
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 1, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 1, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 1, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 17, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 17, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 17, 2020
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed
Show 33 more ↓
- Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 20, 2018
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 31, 2016
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 15, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 15, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 15, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 11, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 11, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 19, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 19, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 19, 2012
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Sep 28, 2012
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Sep 28, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 26, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 26, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 26, 2011
Dob violation - resolved - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed
ECB violations · 7
- Class - 2
Failure to maintain building in code-compliant manner.noted:fire ratedclassroom doors and smoke doors not self closing due to binding,missing and or faulty hardware on classrooms 401,309,303,301,211,103,c38 and
Jun 10, 2026 · Penalty $1,250
Resolve - Class - 2
Reissue on ecb#35724722n failure to maintain building in code compliant manner.noted:in auditorium at several locations has missing sprayed monokate fire proofing due to water damage at ceiling including damage
Jun 10, 2026 · Penalty $3,125
Active - Class - 2
Failure to maintain building in code-compliant manner.illumination forexits,exit discharges and public corridors per bc 1006.1;27-381.noted:exit signs not illuminated when tested over emergency smoke exit in gy
Jun 10, 2026 · Penalty $1,250
Active - Class - 2
Failure to maintain building in code-compliant manner: at the time of inspection, sprayed on fireproofing was missing in a few locations on auditorium ceiling auditorium ceiling also has water damage. remedy: r
Sep 25, 2025 · Penalty $1,250
Active - Class - 2
Failure to maintain building in code-compliant manner: lack of emergency lighting for exits, exit discharges and public corridors per bc 1006.1; 27-542. at the time of inspection, library door did not have illu
Sep 25, 2025 · Penalty $1,250
Resolve - Class - 2
Failure to maintain building in code compliant manner. noted at exp. #1 installed two-secondary wire mesh gates in front of the existing metal gates along path of egress at exp. #2 and 4. the two new exterior g
Aug 14, 2023 · Penalty $3,125
Active - Class - 2
Failure to maintain bldg in code compliant manner.noted:@ electrical room @cellar & 3rd fl.electrical closet,illegal storage of misc items. rem:comply w/notice of violation
Jul 29, 2019
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- School building (W1)
- Year built
- 2010
- Floors
- 4
- Residential units
- —
- Building area
- 103,331 ft²
- Lot area
- 39,875 ft²
- Zoning
- R7X
- Community board
- 412
- Council district
- 27
- Block / lot
- 9763 / 23
- Assessed value
- $15,483,600
- Landmark / historic district
- No
Questions about 153-26 Hillside Avenue
Who owns 153-26 Hillside Avenue?
The owner of record in NYC Department of City Planning PLUTO data is NYC School Construction Authority.
Does 153-26 Hillside Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 153-26 Hillside Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 153-26 Hillside Avenue built?
City records list 2010 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.