150-28 Hillside Avenue
Queens, NY 11432BBL 4-09697-0021Map
Owner of record: Mullick Properties LLC
150-28 Hillside Avenue is an office building built in 1917 in Queens, 11432. The owner of record is Mullick Properties LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 18
- ECB violations
- 42
- HPD complaints
- 4
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 18
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 2, 2022
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 10, 2019
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 15, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 15, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 15, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 6, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active
Show 8 more ↓
- Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Construction other optional
C-construction other optional
May 29, 2001
Dob violation - dismissed - Construction other optional
C-construction other optional
May 29, 2001
Dob violation - dismissed - Electric signs none
Es-electric signs none
May 29, 2001
Vw*-violation - work w/o permit dismissed - Construction other optional
C-construction other optional
May 29, 2001
Vw*-violation - work w/o permit dismissed
ECB violations · 42
- Class - 2
Observed: great amount of black plastic bags garbage or debris on frot side exposure 1 creating rodent infection afecting neighborghs and contrary to building code
Apr 23, 2026 · Penalty $3,125
Resolve - Class - 2
Observed: active site cs present upon inspection noted missing fire extinguishers on cellar and existing on 1st floor level inadequate not per nyc fire code not per size and tags not showing monthly super inspe
Mar 26, 2026 · Penalty $2,530
Resolve - Class - 1
Observed active site cs present upon inspection noted access to cellar bloking with a electrical box causing hazards conditions for workers on site and contrary to building code bc1016.2 & 3307.4.1 & 3304.7 sto
Mar 26, 2026 · Penalty $5,030
Resolve - Class - 1
Observed : active site cs present noted 1st floor slab on c joist upon inspection was required : special inspection report and manufacturer specifications for it, none was provided contrary to bc 1704.1 stop
Mar 26, 2026 · Penalty $2,530
Resolve - Class - 2
Proposed 10 family 4 story building. observed site closed no ongoing construction activity upon inspection noted exp1fence erected when check for fence permit q01011752-s6-fn found it expired on 1-19-2026
Feb 14, 2026
Resolve - Class - 1
Proposed 10 family 4 story building. observed site closed no ongoing construction activity upon inspection noted exp1fence erected but inside noted open area and 2 family framing under renovation/demolition cre
Feb 14, 2026 · Penalty $4,800
Resolve - Class - 2
Pursuant to ac 28-204.4 for violation no. 39536110j issued 01/17/2025. at the time of my inspection, i observed an inactive closed jobsite with the entrance door padlocked. unable to gain access to verify compl
May 8, 2025 · Penalty $3,125
Resolve - Class - 2
Pursuant to ac 28-204.4 for violation no. 39536111l issued 01/17/2025. at the time of my inspection, i observed an inactive closed jobsite with the entrance door padlocked. unable to gain access to verify compl
May 8, 2025 · Penalty $3,125
Resolve - Class - 2
Pursuant to ac 28-204.4 for violation no. 39536112n issued 01/17/2025. at the time of my inspection, i observed an inactive closed jobsite with the entrance door padlocked. unable to gain access to verify compl
May 8, 2025 · Penalty $3,125
Resolve - Class - 2
Failure to correct violating condition and file a certificate of correction pursuant to ac 28-204.4 for violation no. 39536110j issued 01/17/2025. at time of inspection i observed inactive closed jobsite with e
Mar 14, 2025 · Penalty $3,125
Resolve
Show 32 more ↓
- Class - 2
Failure to correct violating condition and file for a certificate of correction pursuant to ac 28-204.4 for violation no. 39536112n issued 01/17/2025. at time of inspection, i observed inactive closed job with
Mar 14, 2025 · Penalty $3,125
Resolve - Class - 2
Failure to correct violating condition and file for a certificate of correction pursuant to ac 28-204.4 for violation no. 39536111l issued 01/17/2025. at time of inspection, i observed inactive closed job with
Mar 14, 2025 · Penalty $3,125
Resolve - Class - 1
Inspection of an active demo site, were the roof had been removed, floor joist and walls opened and exposed i asked the workers for the superintendent they said that there was none onsite. the lack of supervisi
Jan 16, 2025 · Penalty $10,030
Resolve - Class - 1
During inspection, i observed two 5 gallon plastic gas containers, at least three propane metal containers and three salamanders (used to keep the workers warm) onsite. improper material storage, handling and i
Jan 16, 2025 · Penalty $2,530
Resolve - Class - 1
Bc3303.7.2 fire extinguishers: during inspection of a 2 story building with cellar under demo operations i observed combustible construction material(wood, sheetrock, garbage bags) piled high throughout the sit
Jan 16, 2025 · Penalty $5,030
Resolve - Class - 1
During inspection of a 2 story building with cellar under going demo operations, i asked the 7 workers onsite for their sst cards to show that they had received the required safety training to be working on the
Jan 16, 2025 · Penalty $10,030
Resolve - Class - 1
A 2 story building under demo operations, housekeeping was inadequate i observed that there was large piles of garbage bags, wood, sheetrock, bricks and metal throughout the site. the uncontained debris, create
Jan 16, 2025 · Penalty $2,530
Resolve - Class - 2
During inspection of a 2 story safety job under demo operations, i requested to see the demo plans, none was provided. there were no approved plans onsite that reflected the current scope of work (demo) during
Jan 16, 2025 · Penalty $655
Resolve - Class - 2
Bc 3301.2 safety measures standards: during inspection of a 2 story building under demo operations, i observed at the 2nd story that there were open holes approximately 2 feet wide by 4 feet long. the open hole
Jan 16, 2025 · Penalty $2,530
Resolve - Class - 1
A 2 story demo with 7 workers onsite, the superintendent failed to perform their duties. some of the workers did not have sst cards, the housekeeping was inadequate, there were open holes in the floors, there w
Jan 16, 2025 · Penalty $12,500
Resolve - Class - 1
Bc 3301.13.12 competent person: during inspection of a 2 story demo with 7 workers onsite, i requested to see the competent person onsite, there was none. it is the responsibility of the superintendent to desig
Jan 16, 2025 · Penalty $6,250
Resolve - Class - 1
During inspection of a 2 story building under demo operations with 7 workers, i requested to see the workers required sst cards. only 3 out of the 7 workers had the required sst cards which all workers must hav
Jan 16, 2025 · Penalty $12,500
Resolve - Class - 1
I observed in the building, sprinkler system improperly installed off the domestic water line. no test connection and gauge installed on the sprinkler system. sprinkler system not in accordance with rs 17-2 , b
Nov 30, 2021 · Penalty $1,250
Active - Class - 1
Repair and restore to service. (rts)
Oct 3, 2019
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35289740n issued on 08/19/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. at cellar level,installed prohibited materials in commercial
Dec 22, 2017 · Penalty $12,000
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35257556r issued on 06/09/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg in code compliant manner.
Dec 22, 2017 · Penalty $800
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35257556r issued on 06/09/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
Nov 17, 2017 · Penalty $800
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#3589740n issued on 08/19/17 & to file a c of c pursuant to 28-201.1 & 1rcny 1 02-01. work w/o permit,at cellar level installed prohibited materials
Nov 17, 2017 · Penalty $800
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/vio # 35257556r issued on 06/09/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. unable to locate sprinkler heads. multiple sprinkl
Oct 2, 2017 · Penalty $800
Resolve - Class - 1
Failure to comply with the commissioner's order contained in summons/vio # 35289740n issued on 08/19/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. @ cellar installed prohibited materials-pvc draine
Oct 2, 2017 · Penalty $800
Resolve - Class - 1
Work no permit,at cellar level installed in commercial bldg prohibitedmaterials-pvc drainage piping in electrical/water service room-piping,clamps,fitting installed to under ground system. remedy: obtain a perm
Aug 19, 2017 · Penalty $800
Resolve - Class - 2
Failure to maintain bldg in code compliant manner-plumbing fixtures not trapped or(vertical)per pc 916.1 & pc 1002.1;27.901(b). rear bathroom lavatory no vent installed. remedy: install proper size vent.
Aug 19, 2017 · Penalty $500
Resolve - Class - 1
Sec. 407.2 misc violation-observed at gas meter location-gas meter & piping at ceiling not properly supported-missing proper supports. remedy: comply w/summons.
Aug 19, 2017 · Penalty $1,600
Resolve - Class - 1
Failure to have new or altered plumbing systems tested at cellar levelobserved new pvc drainage piping installed in meter(water)electric room & in bathroom rear for sink. no record of inspection on file w/dob.
Aug 19, 2017 · Penalty $1,000
Active - Class - 2
Failure to comply w/the comm's order contained in sum/vio#35257556r issued on 06/09/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01.remedy: comply w/comm's order &/or file a c of c.
Aug 19, 2017 · Penalty $800
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35257555p issued on 06/09/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for missing fire stoppin
Jul 31, 2017 · Penalty $800
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35257553l issued on 06/09/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for illegal occupancy in
Jul 31, 2017 · Penalty $800
Resolve - Class - 1
Occupancy contrary to that allowed by the certificate of occupancy on building dept.records.c of o #401509248 indicate cellar level-offices,boiler room,storage(1ez)store(4)four classrooms(1)apt in construction
Jun 9, 2017 · Penalty $2,400
Resolve - Class - 2
Work without permits.work noted:at cellar level-installed water and waste lines per 1 toilet electrical work throughout on entire premises.rem:obtain all required permits.
Jun 9, 2017 · Penalty $800
Resolve - Class - 1
Failure to maintain building in code compliant manner:no fire stoppingper bc712.3-27.245: at cellar level observed multiple areas missing fire stopping and not providing a fire(rated)boiler room.rem:provide/mai
Jun 9, 2017 · Penalty $1,000
Resolve - Class - 1
Failure to maintian building in code compliant manner.-as per job app#401509248 7 sprinkler heads listed at an schedule b- observed at time of inspection-2 sprinkler head at first floor level with one head cap
Jun 9, 2017 · Penalty $1,000
Active - Class - 1
Failure to provide unobstructed exit passageway-at first floor level second moarls of egress filled with storage-blocking passageway-bed frames -chairs-wood/black board-doorway tv on stand drawers/desk etc -all
Jun 9, 2017 · Penalty $1,200
Resolve
Complaints
- General
Floor
Sep 27, 2007 · Apt 3C
Close - Nonconst
Vermin
Sep 27, 2007 · Apt 3C
Close - Nonconst
Vermin
Sep 27, 2007 · Apt 3C
Close - Heating
Heat related
Feb 3, 2005 · Apt 2D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Office building (O2)
- Year built
- 1917
- Floors
- 2
- Residential units
- —
- Building area
- 2,560 ft²
- Lot area
- 3,000 ft²
- Zoning
- C4-4D
- Community board
- 412
- Council district
- 27
- Block / lot
- 9697 / 21
- Assessed value
- $132,750
- Landmark / historic district
- No
Questions about 150-28 Hillside Avenue
Who owns 150-28 Hillside Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Mullick Properties LLC.
Does 150-28 Hillside Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 150-28 Hillside Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 150-28 Hillside Avenue built?
City records list 1917 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.