87-70 148 Street
Queens, NY 11435BBL 4-09692-0068Map
Owner of record: Am Hotel Corp
87-70 148 Street is a walk-up apartment building built in 1920 in Queens, 11435. It has 10 residential units across 2 floors. The owner of record is Am Hotel Corp. HPD has recorded 34 housing violations here, most recently on November 7, 2025. 1 of the 34 most recent violations are still open.
- HPD violations
- 34
- DOB violations
- 8
- ECB violations
- 19
- HPD complaints
- 5
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 34
- BHazardous
Properly repair or replace the broken or defective latch assembly at building front entrance door at public hall, 1st story
Nov 7, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch assembly at building front entrance door at public hall, 1st story
Nov 7, 2025
Open — Nov certified late - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 15, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 27, 2015
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of concealed ceiling leak 1 sty community bathroom er1.
Aug 30, 1990
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling 1 sty community bathroom er1.
Aug 30, 1990
Closed — Violation closed - BHazardous
Properly repair the broken or defective wood floor 1 sty community kitchen.
Aug 30, 1990
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in shower stall 1 sty community bathroom.
Aug 30, 1990
Closed — Violation closed - BHazardous
Provide adequate supply of cold water for the fixtures washbasin 1 sty community bathroom.
Aug 30, 1990
Closed — Violation closed - BHazardous
Provide adequate supply of hot water for the fixtures washbasin 1 sty community bathroom.
Aug 30, 1990
Closed — Violation closed
Show 24 more ↓
- BHazardous
Properly repair the broken or defective bathtub faucet 1 sty community bathroom.
Aug 30, 1990
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls 1 sty bathroom and kitchen.
Aug 17, 1990
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic walls and ceiling tiles 1 sty bathroom and shower.
Aug 17, 1990
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of concealed water leak 1 sty bathroom and kitchen ceiling.
Aug 17, 1990
Closed — Violation closed - BHazardous
Properly repair the broken or defective wood floor 1 sty kitchen.
Aug 17, 1990
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets sink and bathtub 1 sty kitchen and bathtub.
Aug 17, 1990
Closed — Violation closed - BHazardous
Provide light bulb at front entrance to bldg 50 watts.
Jul 19, 1990
Closed — Violation closed - BHazardous
Provide light bulb at rear yard 40 watts.
Jul 19, 1990
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of chester drawer 2 sty pub hall.
Jul 19, 1990
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling at vestibule 1 sty pub hall.
Jul 19, 1990
Closed — Violation closed - BHazardous
Properly secure the loose bricks 2 tread from bottom at front entrance to bldg.
Jul 19, 1990
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceilings & walls 2 sty center broom 7.
Dec 17, 1987
Closed — Violation closed - BHazardous
D26-10.01 adm code repair the broken or defective plastered surfaces and paint in a uniform color walls & clg 1 sty pub hall.
Mar 13, 1987
Closed — Violation closed - CImmediately hazardous
D26-10.01 adm code & 309 m/d law abate the nuisance consisting of skylight sealed over scuttle opening roof center.
Mar 13, 1987
Closed — Violation closed - BHazardous
D26-10.01 adm code repair the broken or defective plastered surfaces and paint in a uniform color walls & clg 2 sty frnt unit b apt 6. located at apt 6
Aug 29, 1979 · Apt 6
Closed — Violation closed - BHazardous
D26-15.01 adm code provide adequate supply of hot water for the fixtures 2 sty frnt unit b apt 6. located at apt 6
Aug 29, 1979 · Apt 6
Closed — Violation closed - ANon-hazardous
D26-10.01 adm code repair the broken or defective plastered surfaces and paint in a uniform color walls & clg 2 sty pub hall.
Aug 29, 1979
Closed — Violation closed - ANon-hazardous
D26-10.01 adm code replace with new the missing wall ceramic tile bathrm 1 sty pub hall.
Aug 29, 1979
Closed — Violation closed - BHazardous
D26-16.01 adm code repair the leaky and/or defective water supply pipe shower bathrm 2 sty pub hall.
Aug 29, 1979
Closed — Violation closed - ANon-hazardous
D26-10.01 adm code properly repair with similar material the broken or defective plasterboard fire retarding clg cellar rear.
Aug 29, 1979
Closed — Violation closed - BHazardous
D26-32.01 adm code discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible, cellar rear.
Aug 29, 1979
Closed — Violation closed - ANon-hazardous
Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at 1 sty pub hall frame missing.
Aug 29, 1979
Closed — Violation closed - BHazardous
D26-10.01 adm code replace with new the missing light bulb wall light fixture entrance door to bldg.
Aug 29, 1979
Closed — Violation closed - ANon-hazardous
D26-16.03 adm code repair the broken or defective rain leader bldg rear.
Aug 29, 1979
Closed — Violation closed
DOB building violations · 8
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 18, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 5, 2017
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - dismissed
ECB violations · 19
- Class - 2
Failure to comply with commissioner's order to file a certificate of correction with department of building for summons 39139005z., file a certificate of correction
Dec 2, 2025 · Penalty $3,125
Resolve - Class - 1
Failure to maintain building in code-compliant manner: no fire stopping per bc 712.3 (2014 code); 27-345; bc 711.2.4 (2022 code. observed unpermitted foam in basement, at boiler room and common area. potential
Feb 20, 2025 · Penalty $2,500
Resolve - Class - 2
B254 50a-50c.50a-missing chimeney cap 50b-chimney live in poor condition (engineers document required) 50c- combustion air termination not 30' high.
Feb 6, 2019 · Penalty $625
Resolve - Class - 2
Failure to maintain building wall(s)or appurtenances.noted:at exposure#3 retaining wall at rear of yard has loose bricks,missing mortar and wall detached.rem:maintain exterior building noted
Jul 18, 2018 · Penalty $625
Resolve - Class - 2
36,4a,24b,38. b254-36 found weil mclain gas fired boiler not registered. register the boiler correct all violating conditions and submit a certificate of correction.
Apr 3, 2018 · Penalty $310
Resolve - Class - 1
Failure to ground electrical systems.observed in basement area emt conduit connected to electrical service panel running along the wall at an angle to domestic water service pipe those emt pipe did not attach t
Jan 19, 2018 · Penalty $4,800
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35272034p issued on 07/14/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. gas piping to gas dryer in basement removed w/o permit.
Nov 17, 2017 · Penalty $400
Resolve - Class - 1
Failure to comply with the commissioner's order contained in summons/vio # 35272034p issued on 07/14/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. gas piping to gas dryer in bsmt removed w/o permit
Oct 2, 2017 · Penalty $2,400
Resolve - Class - 2
Failure to provide ground fault circuit interrupter(gfci) as required.observed in kitchens convience receptacle outlets with no gfci protector as required.rem:comply with code/provide gfci protection.
Jul 14, 2017 · Penalty $400
Resolve - Class - 1
Work w/o a permit. observed on 7-14-17 at above address gas piping to dryer in basement removed w/o any permits on file at the dob. remedy: obtain all required permits.
Jul 14, 2017 · Penalty $1,600
Resolve
Show 9 more ↓
- Class - 2
Electrical work without a permit.observed in basement installation of 3/4" emt conduit with a 30 amp 250v receptacle outlet with a 2pole,30 amp circuit breaker,listed for dryer.observed on 2nd floor mc cable co
Jul 14, 2017 · Penalty $800
Resolve - Class - 2
Unapproved/unsafe/unsuitable/electrical equipment,materials apparatus,device,appliance or wiring in use.observed installation of emergency lights,in halls;this was completed by connecting to ceiling lights with
Jul 14, 2017 · Penalty $400
Resolve - Class - 1
Sec. 408.2 misc viol-drips future connections exist. observed on 1-13-17 future gas connection in cellar on the tee going through the wall to the outside gas meter. remedy: comply w/summons.
Jan 13, 2017
Resolve - Class - 2
Altered/ changed bldg occupied w/out a valid c of o as per 28-118.3.1-28-118.3.2. job# 401048843 for legalization of renovation not signed off.
Sep 7, 2016
Resolve - Class - 2
Altered bldg occupied w/o a valid certificate of occupancy.noted:existing sro bldg renovated under job#401048843 and fully occupied w/o a valid certificate of occupancy. rmdy: comply w/code,obtain a valid cofo
Feb 18, 2016 · Penalty $500
Resolve - Hazardous
36,48ab,49. 49-weil mclain-steam-gas boiler installed without permit (bq9) (27-147)
Sep 1, 1999 · Penalty $850
Resolve - Hazardous
Residence altered for occupancy for more than the legally approved # of families. d.o.b. records indicate residence is legally approved for2 families. residence now altered for occupancy by 14 sro's. alterati-
Mar 29, 1999 · Penalty $3,050
Resolve - Hazardous
Occupancy contrary to d.o.b. records. converting a legal 2 family dwelling to an illegal 2 fmaily with 14 sro's. illegal occupancy noted1st floor, 6 sro's using 2 community bathrooms and 1 community kitchen
Mar 29, 1999
Resolve - Non-hazardous
Failure to maintain. observed in rear yard. construction building materials - (debris) - wood - sheetrock - pinping - compound buckets. remedy: remove all debris forthwith.
Mar 29, 1999 · Penalty $800
Resolve
Complaints
- Heat/hot water
Entire building
Nov 6, 2025 · Apt 1-013
Close - Heat/hot water
Entire building
May 14, 2019 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 12, 2015 · Apt 3FL
Close - Heat/hot water
Entire building
Mar 11, 2015 · Apt 3
Close - Heat/hot water
Entire building
Mar 11, 2015 · Apt 3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C5)
- Year built
- 1920
- Floors
- 2
- Residential units
- 10
- Building area
- 2,640 ft²
- Lot area
- 4,500 ft²
- Zoning
- C4-4D
- Community board
- 412
- Council district
- 27
- Block / lot
- 9692 / 68
- Assessed value
- $249,300
- Landmark / historic district
- No
HPD registration #419195, last renewed Jul 24, 2025.
Questions about 87-70 148 Street
Who owns 87-70 148 Street?
The owner of record in NYC Department of City Planning PLUTO data is Am Hotel Corp.
Does 87-70 148 Street have violations?
Yes. NYC HPD has recorded 34 housing violations at this property.
Is 87-70 148 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 87-70 148 Street built?
City records list 1920 as the year it was built.
How many apartments are in 87-70 148 Street?
It has 10 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.