89-07 146 Street
Queens, NY 11435BBL 4-09676-0004Map
Owner of record: Pia Iadanza
89-07 146 Street is a two-family home built in 1920 in Queens, 11435. It has 2 residential units across 2 floors. The owner of record is Pia Iadanza. HPD has recorded 23 housing violations here, most recently on August 9, 2017. 8 of the 23 most recent violations are still open.
- HPD violations
- 23
- DOB violations
- 0
- ECB violations
- 1
- HPD complaints
- 17
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 23
- BHazardous
Repair the roof so that it will not leak over ceiling in the 2nd room from east at north located at apt 2, 2nd story
Aug 9, 2017 · Apt 2
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 2nd room from east at north located at apt 2, 2nd story
Aug 9, 2017 · Apt 2
Open — Nov certified late - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from east located at apt 2, 2nd story
Aug 9, 2017 · Apt 2
Open — Nov certified late - BHazardous
Properly secure the loose celotex tiles at ceiling in the 1st room from east located at apt 2, 2nd story
Aug 9, 2017 · Apt 2
Open — Nov certified late - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color east wall in the kitchen located at apt 2, 2nd story
Aug 9, 2017 · Apt 2
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the bathroom located at apt 2, 2nd story
Aug 9, 2017 · Apt 2
Open — Nov certified late - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at east and south walls in the bathroom located at apt 2, 2nd story
Aug 9, 2017 · Apt 2
Open — Nov certified late - BHazardous
Properly repair with similar material the broken or defective wood counter top at sink cabinet in the kitchen located at apt 2, 2nd story
Aug 9, 2017 · Apt 2
Open — Nov certified late - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2, 2nd story
Aug 9, 2017 · Apt 2
Open — Nov certified late - BHazardous
Abate the nuisance consisting of bedbugs in the entire apartment located at apt flr2, 2nd story, 1st apartment from north at east
Jun 5, 2013 · Apt FLR2
Closed — Violation dismissed
Show 13 more ↓
- BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt flr2, 2nd story, 1st apartment from north at east
Jun 5, 2013 · Apt FLR2
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt flr2, 2nd story, 1st apartment from north at east
Jun 5, 2013 · Apt FLR2
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the bathroom located at apt flr2, 2nd story, 1st apartment from north at east
Jun 5, 2013 · Apt FLR2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the walls (at closet) in the bathroom located at apt flr2, 2nd story, 1st apartment from north at east
Jun 5, 2013 · Apt FLR2
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic wall tiles in the bathroom located at apt flr2, 2nd story, 1st apartment from north at east
Jun 5, 2013 · Apt FLR2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the entire apartment located at apt flr2, 2nd story, 1st apartment from north at east
Jun 5, 2013 · Apt FLR2
Closed — Violation dismissed - CImmediately hazardous
Trace and repair the source and abate the nuisance consisting of mold ... at the walls in the 1st room from east located at apt flr2, 2nd story, 1st apartment from north at east
Jun 5, 2013 · Apt FLR2
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the walls in the 1st room from east located at apt flr2, 2nd story, 1st apartment from north at east
Jun 5, 2013 · Apt FLR2
Closed — Violation dismissed - CImmediately hazardous
Repair the roof so that it will not leak at the ceiling at public hall, 2nd story
Jun 5, 2013
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant walls and ceiling at public hall, 2nd story
Jun 5, 2013
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the walls and ceiling at public hall, 2nd story
Jun 5, 2013
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant walls and ceiling at public hall, 1st story
Jun 5, 2013
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the walls and ceiling at public hall, 1st story
Jun 5, 2013
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 1
- Class - 1
Failure to comply w/an order of the commissioner. respondent failed to correct conditions in #34920904x at cellar installed water & waste lines. remedy: comply w/code.
Apr 14, 2012
Resolve
Complaints
- Water leak
Heavy flow
Jul 28, 2017 · Apt 2
Close - Paint/plaster
Ceiling
Jul 28, 2017 · Apt 2
Close - Plumbing
Basin/sink
Jul 28, 2017 · Apt 2
Close - Unsanitary condition
Mold
Jul 28, 2017 · Apt 2
Close - Plumbing
Basin/sink
Jul 28, 2017 · Apt 2
Close - Water leak
Heavy flow
Jul 28, 2017 · Apt 2
Close - Paint/plaster
Wall
Jul 28, 2017 · Apt 2
Close - Paint/plaster
Wall
Jul 28, 2017 · Apt 2
Close - Water leak
Heavy flow
Jul 28, 2017 · Apt 2
Close - Flooring/stairs
Floor
Jul 28, 2017 · Apt 2
Close
Show 7 more ↓
- Plumbing
Water supply
Jan 12, 2017 · Apt 2FL
Close - Nonconst
Vermin
Jun 1, 2013 · Apt FLR2
Close - Nonconst
Vermin
Jun 1, 2013 · Apt FLR2
Close - Paint/plaster
Wall
Jun 1, 2013 · Apt FLR2
Close - General
Ceramic-tile
Jun 1, 2013 · Apt FLR2
Close - Paint/plaster
Ceiling
Jun 1, 2013 · Apt FLR2
Close - General
Mold
Jun 1, 2013 · Apt FLR2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B3)
- Year built
- 1920
- Floors
- 2
- Residential units
- 2
- Building area
- 1,544 ft²
- Lot area
- 2,700 ft²
- Zoning
- R5
- Community board
- 412
- Council district
- 27
- Block / lot
- 9676 / 4
- Assessed value
- $46,860
- Landmark / historic district
- No
Questions about 89-07 146 Street
Who owns 89-07 146 Street?
The owner of record in NYC Department of City Planning PLUTO data is Pia Iadanza.
Does 89-07 146 Street have violations?
Yes. NYC HPD has recorded 23 housing violations at this property.
Is 89-07 146 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 89-07 146 Street built?
City records list 1920 as the year it was built.
How many apartments are in 89-07 146 Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.