88-10 139 Street
Queens, NY 11435BBL 4-09620-0024Map
Owner of record: Ramjas, Indranee
88-10 139 Street is a two-family home built in 1930 in Queens, 11435. It has 2 residential units across 2 floors. The owner of record is Ramjas, Indranee. HPD has recorded 43 housing violations here, most recently on April 21, 2026. 32 of the 43 most recent violations are still open.
- HPD violations
- 43
- DOB violations
- 0
- ECB violations
- 5
- HPD complaints
- 65
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 43
- ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sqaure feet at closet on north wall in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Apr 21, 2026 · Apt 2
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sqaure feet at closet on north wall in the bathroom located at apt 2, 2nd story, 1st apartment from east at south original violation 18804435 issued 21-apr-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Apr 21, 2026 · Apt 2
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective fire retardant materials at west wall and south wall at vestibule area , 1st story
Apr 2, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling at vestibule area , 1st story
Apr 2, 2026
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling and east wall at vestibule area , 1st story
Apr 2, 2026
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of scalding hot water above 130 degrees in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Mar 25, 2026 · Apt 2
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 square feet at north wall in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Mar 25, 2026 · Apt 2
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls and ceiling in vestibule area , 1st story
Mar 25, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at all walls and ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Mar 25, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of loose wires at ceiling in vestibule area , 1st story
Mar 25, 2026
Open — Nov sent out
Show 33 more ↓
- BHazardous
Properly repair with similar material the broken or defective fire retardant materials at west wall in vestibule area , 1st story
Mar 25, 2026
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2fl, 2nd story, 1st apartment from north at east
Mar 3, 2026 · Apt 2FL
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures at wash basin in the bathroom located at apt 2fl, 2nd story, 1st apartment from east at south
Nov 15, 2025 · Apt 2FL
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of hot water temperature exceeds the allowable maximum of 130 degrees in the entire apartment located at apt 2fl, 2nd story, 1st apartment from east at south
Nov 15, 2025 · Apt 2FL
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water temperature exceeds the allowable maximum of 130 degrees in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Oct 13, 2025 · Apt 2
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of hot water temperature exceeds the maximum temperature of 130 degrees in the entire apartment located at apt second, 2nd story, 1st apartment from east at south
May 23, 2025 · Apt SECOND
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 21, 2025
Open — Info nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Apr 18, 2025 · Apt 2
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of scalding hot water consisting of 147 degrees exceeding the maximum allowable temperature of 130 degrees at wash basin in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Apr 18, 2025 · Apt 2
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of scalding hot water consisting of 147 degrees exceeding the maximum allowable temperature of 130 degrees at sink in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Apr 18, 2025 · Apt 2
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Apr 18, 2025 · Apt 2
Open — Invalid certification - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Apr 18, 2025 · Apt 2
Open — Invalid certification - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Apr 18, 2025 · Apt 2
Open — Invalid certification - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at west wall in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Apr 18, 2025 · Apt 2
Open — Invalid certification - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Apr 18, 2025 · Apt 2
Open — Invalid certification - BHazardous
Properly repair or replace the broken or defective glass pane at lower window sash in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Apr 18, 2025 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective lower window sash counterbalance at south wall in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Apr 18, 2025 · Apt 2
Open — Nov certified late - CImmediately hazardous
Properly repair or replace the broken or defective lower window sash counterbalance at 1st window from east at south in the 2nd room from east located at apt 2, 2nd story, 1st apartment from east at south
Apr 18, 2025 · Apt 2
Open — Nov certified late - CImmediately hazardous
Properly repair or replace the broken or defective lower window sash counterbalance at 2nd window from east at south wall in the 2nd room from east located at apt 2, 2nd story, 1st apartment from east at south
Apr 18, 2025 · Apt 2
Open — Nov certified late - BHazardous
Properly repair or replace the broken or defective ceiling light fixture at vestibule at public hall, 1st story
Apr 18, 2025
Open — Invalid certification - BHazardous
Properly repair or replace the broken or defective door to 2nd floor apt at west at public hall, 1st story
Apr 18, 2025
Open — Invalid certification - BHazardous
Properly repair or replace the broken or defective lower sash spring balance at windows in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Mar 27, 2025 · Apt 2
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Mar 27, 2025 · Apt 2
Closed — Violation dismissed - BHazardous
Provide adequate supply of hot water for the fixtures at wash basin in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Mar 27, 2025 · Apt 2
Open — Nov sent out - ANon-hazardous
Provide adequate supply of cold water for the fixtures at wash basin in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Mar 27, 2025 · Apt 2
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color west wall inside base cabinet at sink in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Mar 27, 2025 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the missing electrical outlet cover at south wall in the 1st room from east at north located at apt 2, 2nd story, 1st apartment from south at west
Mar 27, 2025 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the south wall at stairs leading to 2nd story at public hall stairs, 1st story
Mar 27, 2025
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical light fixture at ceiling at vestibule , 1st story
Mar 27, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Mar 27, 2025 · Apt 2
Open — Nov certified late - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Mar 27, 2025 · Apt 2
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the west wall ( near gas range ) in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Mar 27, 2025 · Apt 2
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wire at south wall in the 2nd room from east at south located at apt 2, 2nd story, 1st apartment from south at west
Mar 27, 2025 · Apt 2
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 5
- Class - 2
Work w/o permit.at time of inspection a new garage was observed work was completed w/o permits new concrete slab and cmu block.rem:obtain permits
May 24, 2017 · Penalty $400
Resolve - Class - 2
Residence altered for occupancy as a dwelling for more than the legally approved # of families. dob's records indicates residence to be legally approved for 2 family. residence is now altered for occupancy for
Jul 5, 2012 · Penalty $1,200
Resolve - Class - 2
Work w/o a permit. work noted: 1) at cellar level erected full height partitions (created rooms) installed water & waste line for (toilet/sink) 2) at 2nd fl installed additional water & waste line for 3pc bathr
Jul 5, 2012 · Penalty $400
Resolve - Hazardous
Occupancy contrary to dept of building records. converting a legal twofamily dwelling into an illegal three family dwelling + 2 sro's (sing-le room occupancys) no access to two rooms in cellar, two on 2nd floor
Jul 29, 2000 · Penalty $800
Resolve - Hazardous
Residence altered for occupancy for more than the legally approved number of families. building dept records indicate residence legally approved for two families. residence now altered for occupancy so far
Jul 29, 2000 · Penalty $5,300
Resolve
Complaints
- Heat/hot water
Apartment only
Jun 2, 2026 · Apt 2FL
Close - Plumbing
Water supply
Jun 2, 2026 · Apt 2FL
Close - Plumbing
Basin/sink
Jun 2, 2026 · Apt 2FL
Close - Plumbing
Bathtub/shower
Jun 2, 2026 · Apt 2FL
Close - General
Cooking gas
Jun 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 20, 2026 · Apt 2NDFLO
Close - Plumbing
Water supply
Apr 20, 2026 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Mar 31, 2026 · Apt 2NDFLO
Close - Plumbing
Water supply
Mar 31, 2026 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Mar 25, 2026 · Apt FLOOR2
Close
Show 40 more ↓
- Heat/hot water
Entire building
Mar 24, 2026 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Mar 20, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Mar 17, 2026 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Mar 16, 2026 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Mar 16, 2026 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Mar 15, 2026 · Apt 2NDFLO
Close - Plumbing
Water supply
Mar 10, 2026 · Apt 2
Close - Unsanitary condition
Pests
Mar 10, 2026 · Apt 2
Close - Unsanitary condition
Pests
Mar 10, 2026 · Apt 2
Close - Door/window
Window frame
Mar 10, 2026 · Apt 2
Close - Paint/plaster
Ceiling
Mar 10, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Mar 5, 2026 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Mar 5, 2026 · Apt 2NDFLR
Close - Heat/hot water
Apartment only
Mar 3, 2026 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Mar 2, 2026 · Apt 2NDFL
Close - Plumbing
Water supply
Mar 2, 2026 · Apt 2NDFL
Close - Unsanitary condition
Pests
Mar 2, 2026 · Apt 2NDFL
Close - Heat/hot water
Apartment only
Jan 12, 2026 · Apt 2FL
Close - Plumbing
Water supply
Jan 12, 2026 · Apt 2FL
Close - Heat/hot water
Apartment only
Jan 4, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Dec 8, 2025 · Apt 2
Close - Plumbing
Water supply
Nov 24, 2025 · Apt 2
Close - Heat/hot water
Apartment only
Nov 24, 2025 · Apt 2
Close - Heat/hot water
Apartment only
Nov 21, 2025 · Apt 2
Close - Plumbing
Water supply
Nov 14, 2025 · Apt 2FL
Close - Heat/hot water
Apartment only
Nov 14, 2025 · Apt 2FL
Close - Heat/hot water
Apartment only
Nov 14, 2025 · Apt 2FL
Close - Plumbing
Water supply
Nov 12, 2025 · Apt 2FL
Close - Heat/hot water
Apartment only
Nov 12, 2025 · Apt 2FL
Close - Heat/hot water
Apartment only
Oct 15, 2025 · Apt 2FL
Close - Plumbing
Water supply
Oct 15, 2025 · Apt 2FL
Close - Heat/hot water
Apartment only
Oct 12, 2025 · Apt 2
Close - Heat/hot water
Apartment only
Oct 10, 2025 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
May 22, 2025 · Apt SECOND
Close - Plumbing
Water supply
May 5, 2025 · Apt 2NDFLR
Close - Unsanitary condition
Pests
Apr 18, 2025 · Apt 2
Close - Paint/plaster
Wall
Apr 18, 2025 · Apt 2
Close - Unsanitary condition
Pests
Apr 18, 2025 · Apt 2
Close - Heat/hot water
Apartment only
Apr 18, 2025 · Apt 2
Close - Door/window
Window pane
Apr 18, 2025 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B1)
- Year built
- 1930
- Floors
- 2
- Residential units
- 2
- Building area
- 2,316 ft²
- Lot area
- 2,400 ft²
- Zoning
- R5
- Community board
- 412
- Council district
- 24
- Block / lot
- 9620 / 24
- Assessed value
- $49,560
- Landmark / historic district
- No
Questions about 88-10 139 Street
Who owns 88-10 139 Street?
The owner of record in NYC Department of City Planning PLUTO data is Ramjas, Indranee.
Does 88-10 139 Street have violations?
Yes. NYC HPD has recorded 43 housing violations at this property.
Is 88-10 139 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 88-10 139 Street built?
City records list 1930 as the year it was built.
How many apartments are in 88-10 139 Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.