135-10 Liberty Avenue
Queens, NY 11419BBL 4-09589-0004Map
Owner of record: 135-10 Liberty Ave INC.
135-10 Liberty Avenue is an office building built in 1931 in Queens, 11419. It has 2 residential units across 3 floors. The owner of record is 135-10 Liberty Ave INC.. HPD has recorded 21 housing violations here, most recently on September 5, 2021. 21 of the 21 most recent violations are still open.
- HPD violations
- 21
- DOB violations
- 19
- ECB violations
- 8
- HPD complaints
- 6
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 21
- ANon-hazardous
Properly repair with similar material the broken or defective south ceramic tile wall near door in the 3rd bathroom from north located at apt 3rdfl, 3rd story, 1st apartment from north at east
Sep 5, 2021 · Apt 3RDFL
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3rdfl, 3rd story, 1st apartment from north at east
Sep 5, 2021 · Apt 3RDFL
Open — Nov sent out - BHazardous
Properly repair the broken or defective door lockset in the entrance located at apt 3rdfl, 3rd story, 1st apartment from north at east
Sep 5, 2021 · Apt 3RDFL
Open — Nov sent out - ANon-hazardous
Provide adequate supply of cold water for the fixtures at bathtub in the 3rd bathroom from north located at apt 3rdfl, 3rd story, 1st apartment from north at east
Sep 5, 2021 · Apt 3RDFL
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures at bathtub in the 3rd bathroom from north located at apt 3rdfl, 3rd story, 1st apartment from north at east
Sep 5, 2021 · Apt 3RDFL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling and south wall and kitchen 2nd story apartment #2f.
Aug 9, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color south wall bathroom 2nd story apartment #2f.
Aug 9, 2004
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color west wall 1st story public hall vestibule.
Aug 9, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin roaches 2nd story apartment #2f.
Aug 9, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice 2nd story apartment #2f.
Aug 9, 2004
Open — Nov sent out
Show 11 more ↓
- BHazardous
Replace with new the broken or defective wooden closet door at north east room 2nd story apartment #2f.
Aug 9, 2004
Open — Nov sent out - BHazardous
Repair by closing so as to be gas tight all openings in the waste lineof wash basin at bathroom 2nd story apartment #2f.
Aug 9, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of exposed electrical wires 1st story public hall vestibule ceiling.
Aug 9, 2004
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet 2nd story apartment #2f.
Aug 9, 2004
Open — Nov sent out - ANon-hazardous
Refit apartment entrance door 2nd story apartment #2f.
Aug 9, 2004
Open — Nov sent out - BHazardous
Properly repair the broken or defective unhinged door to 2nd floor apartment.
Aug 9, 2004
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over 2nd floor apartment.
Aug 9, 2004
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice and roaches 2nd floor apartment.
Aug 9, 2004
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet 2nd floor apartment bathroom.
Aug 9, 2004
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling kitchen 2nd floor apartment.
Aug 9, 2004
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective door closet front room 2nd floor apartment.
Aug 9, 2004
Open — Nov sent out
DOB building violations · 19
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 10, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Construction other optional
C-construction other optional
Jan 30, 2007
Vw*-violation - work w/o permit dismissed
Show 9 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - dismissed
ECB violations · 8
- Non-hazardous
Work does not conform to approved plans.note:owner provided approved plans date 4/25/08.substantial deviation from plans:not indivatin1)2ndfl gut rehab,new plumbing & effect-new layout new drywall not shown
May 2, 2008 · Penalty $2,500
Resolve - Non-hazardous
Work does not conform to plans. noted: cellar level rear is missing a lally columns & replaced existing lally column w/4"x 4" wood column. remedy: conform to plans. make safe.
Mar 14, 2008 · Penalty $130
Resolve - Non-hazardous
Work does not conform to approved plan #402553571 alt 3 work being done cellar 1 fl & 2fl cellar removed concrete fl 6" down 95% of cellar fl removed. new plumbing for bthrm new elec work new partition walls 1
May 24, 2007 · Penalty $250
Resolve - Non-hazardous
Failure to maintain adequate housekeeping at rear of property construction debris throughout still not cleaned up open to public at rear glass wood brick see photo. remedy: maintain adequate housekeeping.
May 24, 2007 · Penalty $1,250
Resolve - Hazardous
Failure to maintain bldg noted:at rear back yard construction debris throughout yard.broken glass sheetrock wood concrete 7' x 4'high.remedy:maintain construction debris.
May 16, 2007 · Penalty $500
Resolve - Non-hazardous
Failure to provide approved plans on site at time of inspection.work being done on 2nd fl new walls extension on roof of 1st fl 2 rooms & new partitions new plumbing(on site at 1'5 left 200 no plans)remedy:
May 16, 2007 · Penalty $250
Resolve - Hazardous
Work w/o a permit.work noted:at 1st floor premises removed inside all partitions with electric & plumbing lines.at rear 1st fl created wood extension approx 18' wide,20'long. 15'high with two windows & door
Jan 30, 2007 · Penalty $800
Resolve - Hazardous
Failure to maintain bldg noted:@ back yard & 2nd flr rear accumulationconstruction debris approx 6 cubic yards.remedy:maintain bldg.remove debris
Jan 30, 2007 · Penalty $800
Resolve
Complaints
- Electric
Power outage
Aug 9, 2023 · Apt 3RDFLO
Close - General
Ventilation system
May 31, 2022 · Apt 3RDFLO
Close - Plumbing
Water supply
Aug 30, 2021 · Apt 3RDFL
Close - Safety
Fire escape
Aug 30, 2021 · Apt 3RDFL
Close - Plumbing
Radiator
Aug 30, 2021 · Apt 3RDFL
Close - Heat/hot water
Apartment only
Jan 21, 2021 · Apt 3FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Office building (O8)
- Year built
- 1931
- Floors
- 3
- Residential units
- 2
- Building area
- 4,366 ft²
- Lot area
- 2,259 ft²
- Zoning
- R6B
- Community board
- 410
- Council district
- 28
- Block / lot
- 9589 / 4
- Assessed value
- $319,950
- Landmark / historic district
- No
Questions about 135-10 Liberty Avenue
Who owns 135-10 Liberty Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 135-10 Liberty Ave INC..
Does 135-10 Liberty Avenue have violations?
Yes. NYC HPD has recorded 21 housing violations at this property.
Is 135-10 Liberty Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 135-10 Liberty Avenue built?
City records list 1931 as the year it was built.
How many apartments are in 135-10 Liberty Avenue?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.