127-08 Liberty Avenue

Queens, NY 11419BBL 4-09581-0004Map

Owner of record: Latchman, Totaram

127-08 Liberty Avenue is a store building built in 1931 in Queens, 11419. The owner of record is Latchman, Totaram. HPD has recorded 87 housing violations here, most recently on August 22, 2023. 41 of the 50 most recent violations are still open.

HPD violations
87
DOB violations
22
ECB violations
8
HPD complaints
88

What to know

Concern
5 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Aug 22, 2023

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 87

  • C

    Provide hot water at all hot water fixtures in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Aug 22, 2023 · Apt 2NDFLO

    Open — Nov sent out
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Aug 22, 2023 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic floor tile in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Aug 22, 2023 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Abate the infestation consisting of roaches in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Aug 22, 2023 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Abate the infestation consisting of mice in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Aug 22, 2023 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak over ceiling in the 1st room from north at east located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Aug 22, 2023 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 1st room from north at east located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Aug 22, 2023 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak over ceiling in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Aug 22, 2023 · Apt 2NDFLO

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Aug 22, 2023 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak over ceiling in the 4th room from north at east located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Aug 22, 2023 · Apt 2NDFLO

    Open — Nov sent out
Show 40 more ↓
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 4th room from north at east located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Aug 22, 2023 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Abate the infestation consisting of roaches in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from east at south

    May 18, 2023 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Abate the infestation consisting of mice in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from east at south

    May 18, 2023 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 1st room from north located at apt 2ndflo, 2nd story, 1st apartment from east at south

    May 18, 2023 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak over the ceiling in the 1st room from north located at apt 2ndflo, 2nd story, 1st apartment from east at south

    May 18, 2023 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from east at south

    May 18, 2023 · Apt 2NDFLO

    Open — Nov sent out
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from east at south

    May 18, 2023 · Apt 2NDFLO

    Open — Nov sent out
  • C

    Provide adequate supply of hot water for the fixtures at faucet at sink in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from east at south

    May 18, 2023 · Apt 2NDFLO

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective buliding entrance door at public hall, 1st story

    May 18, 2023

    Closed — Violation closed
  • B

    Abate the infestation consisting of mice in the entire apartment located at apt 2fl, 2nd story, 1st apartment from north at east

    Jan 25, 2023 · Apt 2FL

    Open — Nov sent out
  • B

    Abate the infestation consisting of roaches in the entire apartment located at apt 2fl, 2nd story, 1st apartment from north at east

    Jan 25, 2023 · Apt 2FL

    Open — Nov sent out
  • B

    Abate the infestation consisting of mice in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Dec 11, 2022 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Abate the infestation consisting of roaches in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Dec 11, 2022 · Apt 2NDFLO

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Dec 11, 2022 · Apt 2NDFLO

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Dec 11, 2022 · Apt 2NDFLO

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the 1st room from north at west located at apt 2, 2nd story, 1st apartment from north at east

    Nov 24, 2022 · Apt 2

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east

    Nov 24, 2022 · Apt 2

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Sep 23, 2022 · Apt 2NDFLO

    Open — Nov sent out
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl . in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Sep 23, 2022 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 1st room from north at east located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Sep 23, 2022 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak over ceiling in the 1st room from north at east located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Sep 23, 2022 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Abate the infestation consisting of roaches in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Sep 23, 2022 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Sep 23, 2022 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Provide adequate supply of hot water for the fixtures . in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Sep 23, 2022 · Apt 2NDFLO

    Open — Nov sent out
  • C

    Provide adequate supply of cold water for the fixtures ... in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from east at south

    May 17, 2022 · Apt 2NDFLO

    Closed — Violation closed
  • C

    Provide adequate supply of hot water for the fixtures ... in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from east at south

    May 17, 2022 · Apt 2NDFLO

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of house hold articles at public hall, 1st story

    May 17, 2022

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of house hold article at public hall, 2nd story

    May 17, 2022

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 2nd room from east at north located at apt 2ndflo, 2nd story, 1st apartment from west at north

    Mar 23, 2022 · Apt 2NDFLO

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Mar 7, 2022 · Apt 2NDFLO

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from east at south

    Feb 27, 2022 · Apt 2NDFLO

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Dec 21, 2021 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Abate the infestation consisting of roaches in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Dec 21, 2021 · Apt 2NDFLO

    Open — Nov sent out
  • C

    Abate the nuisance consisting of scalding hot water of 136 degrees; exceeding the maximum allowable temperature of 130 degrees in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Dec 21, 2021 · Apt 2NDFLO

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Dec 21, 2021 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Dec 21, 2021 · Apt 2NDFLO

    Open — Nov sent out
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Dec 21, 2021 · Apt 2NDFLO

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall in the 1st room from north at west located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Dec 21, 2021 · Apt 2NDFLO

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Dec 21, 2021 · Apt 2NDFLO

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door from west at north wall in the 1st room from north at east located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Dec 21, 2021 · Apt 2NDFLO

    Open — Nov sent out

DOB building violations · 22

  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 10, 2016

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - active
Show 12 more ↓
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 7, 1994

    Dob violation - active

ECB violations · 8

  • Class - 2

    Failure to conduct or file a final inspection of permitted work with dob. at time of inspection, observed, the job# 421086700 for mech/hvac propose restaurant & bakery is done & currently using, but it is not l

    Apr 13, 2023 · Penalty $1,250

    Active
  • Class - 2

    Failure to maintain. inspection time, observed, whole backyard is stored full of garbage- 2used oil tanker blank, 3/4burners, ladders, racks, piled up used cardboard sheet, garbage containers, active fridge & a

    Apr 13, 2023 · Penalty $625

    Resolve
  • Class - 2

    Failure to comply with dept. of buildings requirement for permit sign off. respondent obtained permit alt-2 job # 421086 with expiration date 03/18/2016 and alt 2 job # 421158099 with expiration date 05/20/2015

    Jan 18, 2023 · Penalty $1,250

    Active
  • Class - 2

    Work without a permit: noted at front (exp. 1) of premises erected an enclosure of fabric, pvc plastic and aluminum. enclosure has 2 doors approx. 4 ft long by 6 ft wide. by 10ft high. attached to storefront of

    Jan 18, 2023 · Penalty $1,250

    Active
  • Class - 2

    Work w/o a permit. note: at front of property exp1 an awning signs ereed apprx 25'width by 4'high by 3'deep, will the wordig "bahewell bakery and restaurant. rmdy: obtain permit or restore premises to prior leg

    Jan 3, 2018 · Penalty $4,000

    Active
  • Class - 2

    36- b254. 36. found williamson gas fired steam boiler not registered 50a-no support on flue pipe; b-no clean out on chimney base; c-no sup port on water pipes and no check valve on boiler fill going into retur

    Jun 9, 2017 · Penalty $2,500

    Active
  • Class - 1

    B101 50-williamson gas fired model #gsa100 steam boiler has no properpermits. acquire proper permits and submit certificate of correction.

    May 20, 2016 · Penalty $8,000

    Active
  • Class - 2

    B265,36,19b,15,24b,38. as per class 2 (b265) 28-303.7 failure to file a complete boiler inspection report as per dob records. submit a current bo-0 report correct all violating conditions and submit the certifi

    May 20, 2016 · Penalty $2,500

    Active

Complaints

  • Heat/hot water

    Apartment only

    Aug 21, 2023 · Apt 2NDFLO

    Close
  • Plumbing

    Toilet

    Aug 21, 2023 · Apt 2NDFLO

    Close
  • Unsanitary condition

    Pests

    Aug 21, 2023 · Apt 2NDFLO

    Close
  • Unsanitary condition

    Pests

    Aug 21, 2023 · Apt 2NDFLO

    Close
  • Water leak

    Heavy flow

    Aug 21, 2023 · Apt 2NDFLO

    Close
  • Heat/hot water

    Apartment only

    Jun 15, 2023 · Apt 2NDFLO

    Close
  • Plumbing

    Water supply

    May 8, 2023 · Apt 2NDFLO

    Close
  • Plumbing

    Water supply

    May 8, 2023 · Apt 2NDFLO

    Close
  • Plumbing

    Toilet

    May 8, 2023 · Apt 2NDFLO

    Close
  • Plumbing

    Bathtub/shower

    May 8, 2023 · Apt 2NDFLO

    Close
Show 40 more ↓
  • Plumbing

    Toilet

    May 8, 2023 · Apt 2NDFLO

    Close
  • Plumbing

    Bathtub/shower

    May 8, 2023 · Apt 2NDFLO

    Close
  • Heat/hot water

    Apartment only

    Apr 18, 2023 · Apt 2

    Close
  • Plumbing

    Bathtub/shower

    Apr 18, 2023 · Apt 2

    Close
  • Plumbing

    Water supply

    Apr 18, 2023 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Jan 24, 2023 · Apt 2ND

    Close
  • Heat/hot water

    Apartment only

    Jan 24, 2023 · Apt 2FL

    Close
  • Heat/hot water

    Apartment only

    Jan 14, 2023 · Apt 2FLOOR

    Close
  • Heat/hot water

    Apartment only

    Dec 9, 2022 · Apt 2NDFLO

    Close
  • Heat/hot water

    Apartment only

    Dec 9, 2022 · Apt 2NDFLO

    Close
  • Heat/hot water

    Apartment only

    Dec 7, 2022 · Apt 2NDFLO

    Close
  • Heat/hot water

    Apartment only

    Dec 2, 2022 · Apt 2NDFLO

    Close
  • Heat/hot water

    Apartment only

    Dec 2, 2022 · Apt 2NDFLO

    Close
  • Heat/hot water

    Apartment only

    Nov 18, 2022 · Apt SECOND

    Close
  • Plumbing

    Water supply

    Sep 22, 2022 · Apt 2NDFLO

    Close
  • Heat/hot water

    Apartment only

    Sep 22, 2022 · Apt 2NDFLO

    Close
  • Plumbing

    Bathtub/shower

    Sep 22, 2022 · Apt 2NDFLO

    Close
  • Plumbing

    Water supply

    May 14, 2022 · Apt 2NDFLO

    Close
  • Plumbing

    Water supply

    May 12, 2022 · Apt 2NDFLO

    Close
  • Unsanitary condition

    Garbage/recycling storage

    May 10, 2022 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    May 10, 2022 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    May 10, 2022 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    May 10, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Mar 22, 2022 · Apt 2NDFLO

    Close
  • Heat/hot water

    Apartment only

    Mar 6, 2022 · Apt 2NDFLO

    Close
  • Heat/hot water

    Apartment only

    Feb 26, 2022 · Apt 2NDFLO

    Close
  • Heat/hot water

    Apartment only

    Feb 23, 2022 · Apt 2NDFLO

    Close
  • Heat/hot water

    Apartment only

    Jan 21, 2022 · Apt 2ND

    Close
  • Flooring/stairs

    Floor

    Jan 12, 2022 · Apt 2

    Close
  • Plumbing

    Toilet

    Jan 12, 2022 · Apt 2

    Close
  • Plumbing

    Bathtub/shower

    Jan 12, 2022 · Apt 2

    Close
  • Water leak

    Heavy flow

    Jan 12, 2022 · Apt 2

    Close
  • Flooring/stairs

    Floor

    Jan 12, 2022 · Apt 2

    Close
  • Plumbing

    Toilet

    Jan 12, 2022 · Apt 2

    Close
  • Plumbing

    Bathtub/shower

    Jan 12, 2022 · Apt 2

    Close
  • Flooring/stairs

    Floor

    Jan 12, 2022 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Jan 12, 2022 · Apt 2

    Close
  • Flooring/stairs

    Floor

    Jan 12, 2022 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Dec 19, 2021 · Apt 2NDFLO

    Close
  • Heat/hot water

    Apartment only

    Dec 11, 2021 · Apt 2NDFLO

    Close

Sales history

DatePriceTypeUnits
Oct 21, 2025Non-market transferStore buildings2

Building details

Building type
Store building (K2)
Year built
1931
Floors
2
Residential units
—
Building area
2,050 ft²
Lot area
1,680 ft²
Zoning
R6B
Community board
410
Council district
28
Block / lot
9581 / 4
Assessed value
$206,100
Landmark / historic district
No

Questions about 127-08 Liberty Avenue

Who owns 127-08 Liberty Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Latchman, Totaram.

Does 127-08 Liberty Avenue have violations?

Yes. NYC HPD has recorded 87 housing violations at this property.

Is 127-08 Liberty Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 127-08 Liberty Avenue built?

City records list 1931 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.