103-18 130 Street
Queens, NY 11419BBL 4-09566-0049Map
Owner of record: Singh, Pritam
103-18 130 Street is a two-family home built in 1925 in Queens, 11419. It has 2 residential units across 2.5 floors. The owner of record is Singh, Pritam. HPD has recorded 11 housing violations here, most recently on September 18, 2002. 11 of the 11 most recent violations are still open.
- HPD violations
- 11
- DOB violations
- 3
- ECB violations
- 7
- HPD complaints
- 3
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 11
- BHazardous
Section 9, 56, 193, 300, 302 m.d. law- above frame building has been converted from a private dwelling to a multiple dwelling and is now occupied and maintained as such contrary to law.restore premises to lawful occupancy
Sep 18, 2002
Open — Nov sent out - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections cellar throughout.
Sep 18, 2002
Open — Nov sent out - CImmediately hazardous
Replace with new the missing glass lower window sash bathroom 2nd story. er - 1.
Sep 18, 2002
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective connection waste line kitchen sink 2nd story apartment. er - 1.
Sep 18, 2002
Open — Nov sent out - BHazardous
Properly repair the broken or defective door lock entrance door to 2nd story apartment on 1st story level.
Sep 18, 2002
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls bathroom 2nd story apartment.
Sep 18, 2002
Open — Nov sent out - BHazardous
Replace with new the broken or defective ceramic wall tiles bathroom 2nd story apartment.
Sep 18, 2002
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice droppings present in kitchen 2nd story apartment.
Sep 18, 2002
Open — Nov sent out - BHazardous
Properly repair the broken or defective make operable lower window sash in kitchen 2nd story apartment.
Sep 18, 2002
Open — Nov sent out - BHazardous
Remove the torn and/or loose floor covering on stairs 1st story to 2nd story public hall.
Sep 18, 2002
Open — Nov sent out
Show 1 more ↓
- BHazardous
Properly repair the broken or defective base cabinet at kitchen sink 2nd story apartment.
Sep 18, 2002
Open — Nov sent out
DOB building violations · 3
- Construction other optional
C-construction other optional
Oct 13, 2010
Vw-violation work without permit - active - Construction other optional
Rd
Mar 2, 1992
Vp*-violation unserved ecb- dismissed - Construction other optional
Rd
Mar 2, 1992
Vpw*-violation unserved ecb-work without permit-dismissed
ECB violations · 7
- Class - 2
Work w/o a permit work noted at attic lvl installed water and waste lines for 2pcs bath toilet sink rem: obtain permit
Oct 13, 2010 · Penalty $4,000
Active - Class - 2
Failure to comply w/ the comms order to correct the violating condition and file a cert of correction w/ the nyc dob for notice of violation34529828l rem: correct the violating condition and file a cert of corr
Oct 13, 2010 · Penalty $4,000
Active - Non-hazardous
Failure to maintain.deficiency noted:at rear of premises,steps leading into house are in disrepair.2 steps are broken & cracked.additionallythe stairs total rise is four steps & there is no hand railing or guar
Aug 30, 2006 · Penalty $2,500
Active - Non-hazardous
Work without a permit.work noted:at rear yard demolished existing garage & erected concrete block building approx. 21 feet x 12 feet x 10 feet high. install metal "roll down"gate.
Jun 26, 2006 · Penalty $2,500
Active - Hazardous
Failure to maintain building. noted:at first floor rear of building brick steps to building missing bricks in many places. no handrails. remedy:repair defected step.install handrail.
Jun 26, 2006 · Penalty $2,500
Active - Hazardous
Failure to provide at least two means of egress from floor or space wsere required: note at ground floor store : martin super store" approxl6000 # area, + depth of store approx 100 feet; there is only 1 adequar
Sep 11, 2003 · Penalty $1,250
Active - Hazardous
Failure to maintain adequate housekeeping. note: excessive construction debris and rubbish at back yard of premises. remedy: remove all debris & rubbish clean up & maintain premises.
May 13, 2003 · Penalty $500
Active
Complaints
- Heat/hot water
Apartment only
Dec 10, 2016 · Apt 2NDFL
Close - Heating
Heat related
Dec 21, 2008 · Apt BLDG
Close - Heating
Heat related
Dec 13, 2008 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B3)
- Year built
- 1925
- Floors
- 2.5
- Residential units
- 2
- Building area
- 1,298 ft²
- Lot area
- 2,500 ft²
- Zoning
- R4-1
- Community board
- 410
- Council district
- 29
- Block / lot
- 9566 / 49
- Assessed value
- $47,520
- Landmark / historic district
- No
Questions about 103-18 130 Street
Who owns 103-18 130 Street?
The owner of record in NYC Department of City Planning PLUTO data is Singh, Pritam.
Does 103-18 130 Street have violations?
Yes. NYC HPD has recorded 11 housing violations at this property.
Is 103-18 130 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 103-18 130 Street built?
City records list 1925 as the year it was built.
How many apartments are in 103-18 130 Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.