roofy

118-05 Liberty Avenue

Queens, NY 11419BBL 4-09556-0037Map

Owner of record: David And Yonathan 26 LLC

118-05 Liberty Avenue is a mixed residential and retail building built in 1931 in Queens, 11419. It has 2 residential units across 3 floors. The owner of record is David And Yonathan 26 LLC. HPD has recorded 59 housing violations here, most recently on September 11, 2025. 21 of the 50 most recent violations are still open.

HPD violations
59
DOB violations
2
ECB violations
10
HPD complaints
39

What to know

Concern
19 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Sep 11, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 59

  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer located at apt 3, 3rd story, 1st apartment from west at north

    Sep 11, 2025 · Apt 3

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 5; in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north

    Sep 4, 2025 · Apt 2

    Closed — Violation dismissed
  • A

    Replace with new the missing heat rises pipe escutcheon plate at ceiling in the 1st room from north located at apt 2, 2nd story, 1st apartment from west at north

    Sep 4, 2025 · Apt 2

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 5; in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north

    Sep 4, 2025 · Apt 3

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from north at east wall in the 4th room from north located at apt 2ndflo, 2nd story, 1st apartment from west at north

    Jul 8, 2024 · Apt 2NDFLO

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door in the foyer located at apt 2ndflo, 2nd story, 1st apartment from west at north

    Jul 8, 2024 · Apt 2NDFLO

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, ceiling, 1st closet from south at west wall door, 1st closet from south at west wall wall, 1st window frame from west at north wall in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from west at north

    Jul 8, 2024 · Apt 2NDFLO

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 2nd window frame from west at north wall in the 1st room from north at east located at apt 2ndflo, 2nd story, 1st apartment from west at north

    Jul 8, 2024 · Apt 2NDFLO

    Open — Defect letter issued
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the east wall, west wall, ceiling in the 1st room from north at east located at apt 2ndflo, 2nd story, 1st apartment from west at north

    Jul 8, 2024 · Apt 2NDFLO

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from north at east wall in the 1st room from north at east located at apt 2ndflo, 2nd story, 1st apartment from west at north

    Jul 8, 2024 · Apt 2NDFLO

    Closed — Violation closed
Show 40 more ↓
  • A

    Paint with light colored paint to the satisfaction of this department the east wall, 1st closet from south at west wall wall in the foyer located at apt 2ndflo, 2nd story, 1st apartment from west at north

    Jul 8, 2024 · Apt 2NDFLO

    Closed — Violation closed
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2ndflo, 2nd story, 1st apartment from west at north

    Jul 8, 2024 · Apt 2NDFLO

    Open — Certification postponment denied
  • A

    Paint with light colored paint to the satisfaction of this department the 2nd window frame from east at south wall in the 4th room from north located at apt 2ndflo, 2nd story, 1st apartment from west at north

    Jul 8, 2024 · Apt 2NDFLO

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall, west wall in the private hallway located at apt 2ndflo, 1st story, 1st apartment from west at north

    Jun 13, 2024 · Apt 2NDFLO

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 2nd room from north at east located at apt 2ndflo, 1st story, 1st apartment from west at north

    Jun 13, 2024 · Apt 2NDFLO

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 3rd room from north located at apt 2ndflo, 1st story, 1st apartment from west at north

    Jun 13, 2024 · Apt 2NDFLO

    Open — Defect letter issued
  • A

    Replace with new the missing heat riser pipe escutcheon plate at ceiling in the 4th room from north located at apt 2ndflo, 2nd story, 1st apartment from west at north

    Jun 12, 2024 · Apt 2NDFLO

    Closed — Violation closed
  • A

    Replace with new the missing heat riser pipe escutcheon plate at ceiling in the 1st room from north at east located at apt 2ndflo, 2nd story, 1st apartment from west at north

    Jun 12, 2024 · Apt 2NDFLO

    Open — Not complied with
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from west at north

    Jun 12, 2024 · Apt 2NDFLO

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from west at north

    Jun 12, 2024 · Apt 2NDFLO

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective marble saddle at floor in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from west at north

    Jun 12, 2024 · Apt 2NDFLO

    Closed — Violation closed
  • B

    Abate the infestation consisting of mice in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from west at north

    Jun 12, 2024 · Apt 2NDFLO

    Closed — Violation closed
  • C

    Abate the nuisance consisting of hot water exceeding temperature of 130f degrees at all hot water fixtures in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from west at north

    Jun 12, 2024 · Apt 2NDFLO

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 1st room from north at east located at apt 3, 3rd story, 1st apartment from west at north

    Feb 7, 2024 · Apt 3

    Open — Defect letter issued
  • B

    Properly repair or replace the broken or defective counter balance lower sash window at north 1 and at north 2 in the 1st room from north at east located at apt 3, 3rd story, 1st apartment from west at north

    Feb 7, 2024 · Apt 3

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color at west wall in the bathroom located at apt 3, 3rd story, 1st apartment from west at north

    Feb 7, 2024 · Apt 3

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the east wall in the 1st room from north at east located at apt 3, 3rd story, 1st apartment from west at north

    Feb 7, 2024 · Apt 3

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wooden floor in the 4th room from north at east located at apt 3, 3rd story, 1st apartment from west at north

    Feb 7, 2024 · Apt 3

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall in the 2nd room from north at east located at apt 3, 3rd story, 1st apartment from west at north

    Feb 7, 2024 · Apt 3

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 3rd room from north located at apt 3, 3rd story, 1st apartment from west at north

    Feb 7, 2024 · Apt 3

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, north wall, south wall, east wall, west wall, 1st wall cabinet from east at south wall, 1st wall cabinet from south at west wall, 1st window frame from west at north wall in the kitchen located at apt 3, 3rd story, 1st apartment from west at north

    Feb 7, 2024 · Apt 3

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 1st room from north at east located at apt 3, 3rd story, 1st apartment from west at north

    Feb 7, 2024 · Apt 3

    Open — Defect letter issued
  • B

    Properly repair or replace the broken or defective light fixture at ceiling in the 4th room from north at west located at apt 3, 3rd story, 1st apartment from west at north

    Feb 7, 2024 · Apt 3

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective 2nd electric oulet at east wall in the kitchen located at apt 3, 3rd story, 1st apartment from west at north

    Feb 7, 2024 · Apt 3

    Closed — Violation closed
  • B

    Abate the infestation consisting of mice in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north

    Feb 7, 2024 · Apt 3

    Closed — Violation closed
  • A

    Properly repair or replace the broken or defective bell buzzer in the entrance located at apt 3, 3rd story, 1st apartment from west at north

    Feb 7, 2024 · Apt 3

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the west wall, east wall in the foyer located at apt 3, 3rd story, 1st apartment from west at north

    Feb 7, 2024 · Apt 3

    Open — Not complied with
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from south at west wall in the 2nd room from north at east located at apt 3, 3rd story, 1st apartment from west at north

    Feb 7, 2024 · Apt 3

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, 1st dumb waiter from south at west wall in the foyer located at apt 3, 3rd story, 1st apartment from west at north

    Feb 7, 2024 · Apt 3

    Open — Not complied with
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, 1st dumb waiter from south at west wall in the foyer located at apt 3, 3rd story, 1st apartment from west at north

    Feb 7, 2024 · Apt 3

    Open — Not complied with
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall in the 2nd room from north at east located at apt 3, 3rd story, 1st apartment from west at north

    Feb 7, 2024 · Apt 3

    Open — Defect letter issued
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 3, 3rd story, 1st apartment from west at north

    Feb 7, 2024 · Apt 3

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective lower glass pane at south 1 in the 4th room from north at east located at apt 3, 3rd story, 1st apartment from west at north

    Feb 7, 2024 · Apt 3

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic tiles at west wall in the bathroom located at apt 3, 3rd story, 1st apartment from west at north

    Feb 7, 2024 · Apt 3

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective enamel porcelain glaze at bathtub in the bathroom located at apt 3, 3rd story, 1st apartment from west at north

    Feb 7, 2024 · Apt 3

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the north wall in the 3rd room from north located at apt 3, 3rd story, 1st apartment from west at north

    Feb 7, 2024 · Apt 3

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, north wall, south wall, east wall, west wall, 1st wall cabinet from east at south wall, 1st wall cabinet from south at west wall, 1st window frame from west at north wall in the kitchen located at apt 3, 3rd story, 1st apartment from west at north

    Feb 7, 2024 · Apt 3

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 3rd room from north located at apt 3, 3rd story, 1st apartment from west at north

    Feb 7, 2024 · Apt 3

    Open — Defect letter issued
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color at east wall in the private hallway located at apt 3rdfl, 3rd story, 1st apartment from west at north

    Jan 18, 2024 · Apt 3RDFL

    Closed — Violation closed
  • A

    Properly repair or replace the broken or defective bell buzzer at east in the foyer located at apt 3rdfl, 3rd story, 1st apartment from west at north

    Jan 18, 2024 · Apt 3RDFL

    Closed — Violation closed

DOB building violations · 2

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 7, 2014

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed

ECB violations · 10

  • Class - 3

    Work without permit in front of the store one sign facing liberty avenue approx. size 20ft l x 3ft h x 3ft d with blue background mention in sign "vanessa boutique ", obtain permit or restore premises to prior

    Nov 24, 2025

    Resolve
  • Class - 2

    Failure to comply with commissioner's order contained in summons/violation #35308870m issued on 03/06/18 and to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2). an acceptable certif

    Dec 17, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    Work w/o a permit. noted: at front of premises a metal structure was erected approx 10'high & 15'long w/electric lighting. no permits on file w/dob. remedy: obtain permit on remove structure.

    Mar 6, 2018 · Penalty $800

    Resolve
  • Class - 2

    Wokr w/o permit. noted: 1st fl occupied by a retail store has done a horizontal extension,new cmu wall,structural steel,corrugated decking w/pour concrete at roof level,new chimney stock,also created vertical

    Nov 18, 2016 · Penalty $2,000

    Resolve
  • Class - 2

    Work w/o permit. noted: installation of hvac unit on rear 1st fl roof supported by structural steel. no filing in dob records. remedy: obtain permit or restore premises to prior legal conditon.

    Nov 18, 2016 · Penalty $800

    Resolve
  • Class - 1

    3314.8,partial stop work order for supported scaffold issued pursuant to 28-207.2 & posted @ premises.guardrails & toeboards.note:supported scafold have been erected on top of sidewalk shed @ exp #1(liberty ave

    Sep 26, 2014 · Penalty $1,600

    Resolve
  • Class - 1

    3314.13.2,partial stop work order for supported scaffold issued pursuant to 28-207.2 & posted @ premises.(f2cyes)& panles shall be joined togther by stacking ping or coupling..note:supported scaffold have been

    Sep 26, 2014 · Penalty $1,600

    Resolve
  • Class - 2

    Failure to comply w/the comm'nrs order to file a cert.of correction w/the dob for nov 35084502z issued on 01/11/14 pursuant to 28-204.4 & 1rcny 102-01.remedy:file a certificate of correction

    May 24, 2014

    Resolve
  • Class - 2

    Failure to comply w/ the commissioner's order to file a certificate ofcorrection w/ the dept. of bldg for notice of violation # 35084502z issued on 01/11/14 pursuant to 28-204.4 & 1rcny 102-01. remedy: file a c

    Mar 13, 2014 · Penalty $400

    Resolve
  • Class - 1

    Failure to maintain observed: above store front canopy: metal sign app2'high x 20'long detailed from building (partially),attached only on right side,protruding over public sidewalk, sign swaying in wind.rmdy:

    Jan 11, 2014 · Penalty $1,000

    Resolve

Complaints

  • Plumbing

    Radiator

    Feb 19, 2026 · Apt FLOOR3

    Close
  • Plumbing

    Radiator

    Feb 19, 2026 · Apt FLOOR3

    Close
  • Plumbing

    Water supply

    Jan 24, 2026 · Apt THIRDF

    Close
  • Paint/plaster

    Ceiling

    Jul 1, 2024 · Apt 2NDFLO

    Close
  • Unsanitary condition

    Mold

    Jul 1, 2024 · Apt 2NDFLO

    Close
  • Paint/plaster

    Wall

    Jul 1, 2024 · Apt 2NDFLO

    Close
  • Paint/plaster

    Wall

    Jun 12, 2024 · Apt 2NDFLO

    Close
  • Unsanitary condition

    Pests

    Jun 12, 2024 · Apt 2NDFLO

    Close
  • Plumbing

    Water supply

    Jun 12, 2024 · Apt 2NDFLO

    Close
  • Paint/plaster

    Wall

    Jun 12, 2024 · Apt 2NDFLO

    Close
Show 29 more ↓
  • Paint/plaster

    Wall

    Feb 12, 2024 · Apt 3RDFL

    Close
  • General

    Bell/buzzer/intercom

    Feb 5, 2024 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Feb 5, 2024 · Apt 3

    Close
  • Appliance

    Refrigerator

    Feb 5, 2024 · Apt 3

    Close
  • Door/window

    Window pane

    Feb 5, 2024 · Apt 3

    Close
  • Unsanitary condition

    Pests

    Feb 5, 2024 · Apt 3

    Close
  • Electric

    Outlet/switch

    Feb 5, 2024 · Apt 3

    Close
  • Electric

    Lighting

    Feb 5, 2024 · Apt 3

    Close
  • Flooring/stairs

    Floor

    Feb 5, 2024 · Apt 3

    Close
  • Door/window

    Door frame

    Feb 1, 2024 · Apt 2

    Close
  • Electric

    Outlet/switch

    Jan 19, 2024 · Apt 3RDFL

    Close
  • Door/window

    Window frame

    Jan 19, 2024 · Apt 3RDFL

    Close
  • Heat/hot water

    Apartment only

    Jan 19, 2024 · Apt 3RDFL

    Close
  • Heat/hot water

    Apartment only

    Jan 17, 2024 · Apt 3RDFL

    Close
  • Heat/hot water

    Entire building

    Jan 16, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 15, 2024 · Apt 2NDFLO

    Close
  • Heat/hot water

    Entire building

    Jan 15, 2024 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Dec 30, 2023 · Apt SECOND

    Close
  • Plumbing

    Water supply

    Dec 30, 2023 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Apr 14, 2014 · Apt 2FL

    Close
  • Electric

    Power outage

    Apr 11, 2014 · Apt 2FL

    Close
  • Plumbing

    Water supply

    Apr 11, 2014 · Apt 2FL

    Close
  • Heat/hot water

    Entire building

    Apr 11, 2014 · Apt 2FL

    Close
  • Plumbing

    Water supply

    Apr 9, 2014 · Apt 2FL

    Close
  • Flooring/stairs

    Floor

    Apr 9, 2014 · Apt 2FL

    Close
  • Door/window

    Door

    Apr 9, 2014 · Apt 2FL

    Close
  • Heat/hot water

    Apartment only

    Apr 9, 2014 · Apt 2FL

    Close
  • Door/window

    Window pane

    Apr 9, 2014 · Apt 2FL

    Close
  • Electric

    Power outage

    Apr 9, 2014 · Apt 2FL

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Mixed residential and retail building (S2)
Year built
1931
Floors
3
Residential units
2
Building area
2,700 ft²
Lot area
1,700 ft²
Zoning
R6A
Community board
410
Council district
29
Block / lot
9556 / 37
Assessed value
$76,140
Landmark / historic district
No

HPD registration #921736, last renewed Sep 22, 2025.

Questions about 118-05 Liberty Avenue

Who owns 118-05 Liberty Avenue?

The owner of record in NYC Department of City Planning PLUTO data is David And Yonathan 26 LLC.

Does 118-05 Liberty Avenue have violations?

Yes. NYC HPD has recorded 59 housing violations at this property.

Is 118-05 Liberty Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 118-05 Liberty Avenue built?

City records list 1931 as the year it was built.

How many apartments are in 118-05 Liberty Avenue?

It has 2 residential units and 3 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.