111-12 Liberty Avenue
Queens, NY 11419BBL 4-09534-0006Map
Owner of record: 111-12 Liberty Avenue LLC
111-12 Liberty Avenue is a mixed residential and retail building built in 1920 in Queens, 11419. It has 2 residential units across 2 floors. The owner of record is 111-12 Liberty Avenue LLC. HPD has recorded 28 housing violations here, most recently on August 26, 2021. 25 of the 28 most recent violations are still open.
- HPD violations
- 28
- DOB violations
- 36
- ECB violations
- 2
- HPD complaints
- 27
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 28
- BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2fl, 2nd story, 1st apartment from north at east
Aug 26, 2021 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the kitchen located at apt 2fl, 2nd story, 1st apartment from north at east
Aug 26, 2021 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 2fl, 2nd story, 1st apartment from north at east
Aug 26, 2021 · Apt 2FL
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, north wall, south wall, east wall, 1st window frame from west at north wall in the kitchen located at apt 2fl, 2nd story, 1st apartment from north at east
Aug 26, 2021 · Apt 2FL
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from north located at apt 2fl, 2nd story, 1st apartment from north at east
Aug 26, 2021 · Apt 2FL
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2fl, 2nd story, 1st apartment from north at east
Aug 26, 2021 · Apt 2FL
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective connection waste pipe leaking under sink in the kitchen located at apt 1r, 2nd story
Jan 16, 2018 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1r, 2nd story
Jan 16, 2018 · Apt 1R
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at east located at apt 1r, 2nd story
Jan 16, 2018 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the entire apartment located at apt 1r, 1st story
Jan 16, 2018 · Apt 1R
Closed — Violation closed
Show 18 more ↓
- BHazardous
Replace with new the broken or defective acustical tiles at ceiling in the 1st room from north at east located at apt 1r, 1st story
Jan 16, 2018 · Apt 1R
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). that is missing in the entire apartment located at apt 1r, 2nd story
Jan 16, 2018 · Apt 1R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling at public hall, 2nd story
Aug 6, 2010
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling at public hall, 2nd story
Aug 6, 2010
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures sink only in the kitchen located at apt 2fl, 2nd story
Jan 30, 2010 · Apt 2FL
Open — Nov sent out - BHazardous
Provide adequate supply of cold water for the fixtures sink only in the kitchen located at apt 2fl, 2nd story
Jan 30, 2010 · Apt 2FL
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2, 2nd story
Dec 1, 2004 · Apt 2
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2fl, 2nd story, 2nd apartment from west at north
Nov 14, 2004 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak ceiling in the 2nd room from east located at apt 2rear, 2nd story
Apr 9, 2003 · Apt 2REAR
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 2nd room from east located at apt 2rear, 2nd story
Apr 9, 2003 · Apt 2REAR
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak ceiling in the kitchen located at apt 2rear, 2nd story
Apr 9, 2003 · Apt 2REAR
Open — Nov sent out - BHazardous
Replace with new the broken or defective acoustic ceiling tiles in the kitchen located at apt 2rear, 2nd story
Apr 9, 2003 · Apt 2REAR
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from north located at apt 2 fl, 2nd story, apartment at south
Apr 7, 2003 · Apt 2 FL
Open — Nov sent out - BHazardous
Properly repair the broken or defective radiator control valve in the 2nd room from north at east located at apt 2r, 2nd story
Dec 26, 2001 · Apt 2R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color east wall i st. story at public hall
Oct 20, 2000
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color wall at entrance at public hall, 1st story
Oct 16, 2000
Open — Nov sent out - BHazardous
Remove the illegal fastening double cylinder lock to entrance. at public hall, 1st story
Oct 16, 2000
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in sink drain in the kitchen located at apt 2r, 2nd story
Oct 16, 2000 · Apt 2R
Open — Nov sent out
DOB building violations · 36
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Construction other optional
C-construction other optional
Jan 7, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed
Show 26 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - active
ECB violations · 2
- Hazardous
Failure to maintain. hazardous. 1 story extension at rear of premises approx. size 30'x 15'x 10'h. walls from concrete blocks and bricks. walls have joint cracks. there is a crack separating extension from main
Aug 25, 2005 · Penalty $800
Resolve - Non-hazardous
Failure to install fire retarding material over boiler and completely envlose stair from basement to first floor remedy cover beams over boiler for distance of 7" with fire retarding material 1 hr rating and en
Oct 12, 1989
Resolve
Complaints
- Water leak
Slow leak
Oct 20, 2026 · Apt 1FRONT
Open - Water leak
Damp spot
Aug 25, 2021 · Apt 2FL
Close - Paint/plaster
Ceiling
Aug 25, 2021 · Apt 2FL
Close - Paint/plaster
Ceiling
Aug 25, 2021 · Apt 2FL
Close - Heat/hot water
Apartment only
Dec 29, 2017 · Apt 2
Close - Paint/plaster
Ceiling
Dec 29, 2017 · Apt 2
Close - Plumbing
Basin/sink
Dec 29, 2017 · Apt 2
Close - Water leak
Slow leak
Dec 29, 2017 · Apt 2
Close - Heat/hot water
Entire building
Dec 27, 2017 · Apt 2
Close - Heating
Heat related
Mar 26, 2013 · Apt 2R
Close
Show 17 more ↓
- Plumbing
Water supply
Jul 18, 2010 · Apt 2FL
Close - Plumbing
Water supply
Jan 30, 2010 · Apt 2FL
Close - Plumbing
Water supply
Jan 10, 2010 · Apt 2FL
Close - Plumbing
Water supply
Jan 10, 2010 · Apt 2FL
Close - Heating
Heat related
Oct 15, 2009 · Apt 2FL
Close - Heating
Heat related
Oct 12, 2009 · Apt 2F
Close - Heating
Heat related
Dec 20, 2008 · Apt 2R
Close - Heating
Heat related
Dec 20, 2008 · Apt 2R
Close - Heating
Heat related
Dec 28, 2007 · Apt GFL
Close - Heating
Heat related
Nov 26, 2004 · Apt 2FL
Close - Heating
Heat related
Nov 10, 2004 · Apt 2FL
Close - Heating
Heat related
Nov 9, 2004 · Apt 2FL
Close - Plumbing
Water-leaks
Apr 5, 2003 · Apt 2 FL
Close - Heating
Heat related
Apr 5, 2003 · Apt 2 FL
Close - Heating
Heat related
Apr 1, 2003 · Apt 2 FL
Close - Heating
Heat related
Mar 31, 2003 · Apt 2 FL
Close - Plumbing
Water-leaks
Mar 31, 2003 · Apt 2 FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 1920
- Floors
- 2
- Residential units
- 2
- Building area
- 2,448 ft²
- Lot area
- 3,438 ft²
- Zoning
- R6B
- Community board
- 410
- Council district
- 28
- Block / lot
- 9534 / 6
- Assessed value
- $65,280
- Landmark / historic district
- No
Questions about 111-12 Liberty Avenue
Who owns 111-12 Liberty Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 111-12 Liberty Avenue LLC.
Does 111-12 Liberty Avenue have violations?
Yes. NYC HPD has recorded 28 housing violations at this property.
Is 111-12 Liberty Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 111-12 Liberty Avenue built?
City records list 1920 as the year it was built.
How many apartments are in 111-12 Liberty Avenue?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.