101-07 134 Street
Queens, NY 11419BBL 4-09502-0120Map
Owner of record: 101-07 134th Street LLC
101-07 134 Street is a walk-up apartment building built in 2006 in Queens, 11419. It has 3 residential units across 3 floors. The owner of record is 101-07 134th Street LLC. HPD has recorded 90 housing violations here, most recently on November 15, 2024. 39 of the 50 most recent violations are still open.
- HPD violations
- 90
- DOB violations
- 0
- ECB violations
- 6
- HPD complaints
- 98
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 90
- BHazardous
Remove the illegal fastening consisting of double cylinder key operated lock at metal gate to street at building front yard
Nov 15, 2024
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Nov 15, 2024
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Nov 15, 2024
Open — Nov sent out - ANon-hazardous
Refit hinges at building entrance door at public hall, 1st story
Nov 15, 2024
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder lock, lot line gate yard
Sep 14, 2024
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Sep 14, 2024
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Sep 14, 2024
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
Sep 14, 2024
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Sep 14, 2024
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Sep 14, 2024
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Sep 14, 2024
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1stflo, 1st story, 1st apartment from north at east
Aug 29, 2024 · Apt 1STFLO
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and north wall in the kitchen located at apt 1stflo, 1st story, 1st apartment from north at east
Aug 29, 2024 · Apt 1STFLO
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1stflo, 1st story, 1st apartment from north at east
Aug 29, 2024 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1stflo, 1st story, 1st apartment from north at east
Aug 29, 2024 · Apt 1STFLO
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of household items at public hall, 3rd story
Aug 27, 2024
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective north handrail at stairs at public hall, 3rd story
Aug 27, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door at public hall, 1st story
Aug 27, 2024
Open — Not complied with - CImmediately hazardous
Remove the illegal fastening consisting of double cylinder key operated lock installed at lot line metal gate at building front yard
Aug 26, 2024
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Aug 22, 2024
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 22, 2024
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Aug 22, 2024
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Aug 22, 2024
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Aug 22, 2024
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 22, 2024
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 2nd apartment from north at east
Aug 22, 2024 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak over ceiling in the kitchen located at apt 1, 1st story, 2nd apartment from north at east
Aug 22, 2024 · Apt 1
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1, 1st story, 2nd apartment from north at east
Aug 22, 2024 · Apt 1
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 2nd apartment from north at east
Aug 22, 2024 · Apt 1
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 1, 1st story, 2nd apartment from north at east
Aug 22, 2024 · Apt 1
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Aug 22, 2024
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening consisting of double cylinder lock at metal gate at building front
Jul 20, 2024
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1stflo, 1st story, 1st apartment from north at east
Jun 15, 2024 · Apt 1STFLO
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1stflo, 1st story, 1st apartment from north at east
Jun 15, 2024 · Apt 1STFLO
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the kitchen located at apt 1stflo, 1st story, 1st apartment from north at east
Jun 15, 2024 · Apt 1STFLO
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective plaster board at ceiling , in the kitchen located at apt 1fl, 1st story, 1st apartment from north at east
Jun 1, 2024 · Apt 1FL
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening consisting of double cylinder lock installed at metal security door to building front yard
Dec 9, 2023
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees fahrenheit at all hot water fixture in the entire apartment located at apt 2ndfl, 2nd story, 1st apartment from east at south
Dec 9, 2023 · Apt 2NDFL
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and west wall in the 2nd room from east at south located at apt 2ndfl, 2nd story, 1st apartment from east at south
Dec 9, 2023 · Apt 2NDFL
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east at south located at apt 2ndfl, 2nd story, 1st apartment from east at south
Dec 9, 2023 · Apt 2NDFL
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 1st private hallway from east at north located at apt 2ndfl, 2nd story, 1st apartment from east at south
Dec 9, 2023 · Apt 2NDFL
Open — Nov sent out - ANon-hazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 2ndfl, 2nd story, 1st apartment from east at south
Dec 9, 2023 · Apt 2NDFL
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1fl, 1st story, 1st apartment from north at east
Dec 8, 2023 · Apt 1FL
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the kitchen located at apt 1stflo, 1st story, 1st apartment from north at east
Dec 8, 2023 · Apt 1STFLO
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1stflo, 1st story, 1st apartment from north at east
Dec 8, 2023 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1fl, 1st story, 1st apartment from north at east
Dec 8, 2023 · Apt 1FL
Open — Nov certified late - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1fl, 1st story, 1st apartment from north at east
Dec 8, 2023 · Apt 1FL
Open — Nov certified late - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from east at south
Sep 21, 2023 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall, west wall in the 2nd room from east at north located at apt 2, 2nd story, 1st apartment from east at south
Sep 21, 2023 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 2nd bathroom from east at north located at apt 2, 2nd story, 1st apartment from east at south
Sep 21, 2023 · Apt 2
Closed — Violation closed
DOB building violations · 0
No DOB violations on record
ECB violations · 6
- Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the dept of buildings for summons 35481614m, file a certificate of correction
Jan 20, 2026 · Penalty $1,250
Active - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the dept of buildings for summons 39108174h, file a certificate of correction
Jan 20, 2026 · Penalty $1,250
Active - Class - 1
Building or open lot occupied without a valid certificate of occupancy. at time of inspection, observed, the whole building is occupied without co. the job# 402299053-nb is not singed off yet., obtain a valid c
Mar 8, 2024 · Penalty $6,250
Resolve - Class - 1
Occupancy contrary to that allowed by c/o or bldgs dept records cellarusage changed from ordinary storage to apt w/bthrm facilities installed discont illegal use vacate158537
Feb 12, 2022 · Penalty $6,250
Resolve - Class - 2
Occupancy contrary to that allowed by certificate of occupancy or building dept records cellar usage changed from storage to apt with kitchen & bathroom facilties installed.remedy:discontinue illegal use
Dec 19, 2021 · Penalty $3,125
Resolve - Class - 2
Occupancy is contrary to that allowed by the certificate of occupancy or building department records.cellar use changed from storage and ordinary use to an apartment.partitions erected with kitchen and bathroom
Jul 12, 2017 · Penalty $6,000
Active
Complaints
- Heat/hot water
Apartment only
Mar 3, 2025 · Apt 3
Close - Heat/hot water
Entire building
Mar 3, 2025 · Apt 3RDFLO
Close - Heat/hot water
Apartment only
Mar 2, 2025 · Apt 3RDFLO
Close - Heat/hot water
Entire building
Nov 13, 2024 · Apt FIRSTF
Close - Heat/hot water
Apartment only
Oct 16, 2024 · Apt FIRSTF
Close - Unsanitary condition
Pests
Oct 4, 2024 · Apt 2FLOOR
Close - Door/window
Window frame
Oct 4, 2024 · Apt 2FLOOR
Close - Paint/plaster
Wall
Oct 4, 2024 · Apt 2FLOOR
Close - Plumbing
Toilet
Oct 4, 2024 · Apt 2FLOOR
Close - Unsanitary condition
Pests
Oct 4, 2024 · Apt 2FLOOR
Close
Show 40 more ↓
- Appliance
Refrigerator
Oct 4, 2024 · Apt 2FLOOR
Close - Paint/plaster
Ceiling
Oct 4, 2024 · Apt 2FLOOR
Close - Flooring/stairs
Stairs
Oct 4, 2024 · Apt 2FLOOR
Close - Electric
Outlet/switch
Oct 4, 2024 · Apt 2FLOOR
Close - Heat/hot water
Apartment only
Sep 7, 2024 · Apt 1STFLO
Close - Water leak
Heavy flow
Sep 7, 2024 · Apt 1STFLO
Close - Heat/hot water
Apartment only
Aug 29, 2024 · Apt 1STFLO
Close - Paint/plaster
Ceiling
Aug 27, 2024 · Apt 1STFLO
Close - Heat/hot water
Apartment only
Aug 27, 2024 · Apt 1STFLO
Close - Heat/hot water
Apartment only
Aug 26, 2024 · Apt 1STFLO
Close - Heat/hot water
Entire building
Aug 21, 2024 · Apt 1FLOOR
Close - Water leak
Heavy flow
Aug 20, 2024 · Apt FL1
Close - Plumbing
Water supply
Aug 13, 2024 · Apt 1STFLO
Close - Safety
Window guard broken/missing
Aug 12, 2024 · Apt 2NDFLO
Close - Paint/plaster
Wall
Aug 12, 2024 · Apt 2NDFLO
Close - Unsanitary condition
Pests
Aug 12, 2024 · Apt 2NDFLO
Close - Unsanitary condition
Pests
Aug 12, 2024 · Apt 2NDFLO
Close - Electric
Outlet/switch
Aug 12, 2024 · Apt 2NDFLO
Close - Unsanitary condition
Garbage/recycling storage
Aug 12, 2024 · Apt 2
Close - Plumbing
Toilet
Aug 12, 2024 · Apt 2NDFLO
Close - Unsanitary condition
Pests
Aug 12, 2024 · Apt 2NDFLO
Close - Water leak
Heavy flow
Aug 12, 2024 · Apt 2NDFLO
Close - Plumbing
Water supply
Aug 12, 2024 · Apt 2NDFLO
Close - Paint/plaster
Ceiling
Jun 14, 2024 · Apt 1STFLO
Close - Water leak
Heavy flow
Jun 14, 2024 · Apt 1STFLO
Close - Water leak
Heavy flow
May 28, 2024 · Apt 1FL
Close - Heat/hot water
Apartment only
Jan 26, 2024 · Apt 2FL
Close - Plumbing
Water supply
Dec 8, 2023 · Apt 2NDFLO
Close - Heat/hot water
Entire building
Dec 8, 2023 · Apt 2NDFLO
Close - Water leak
Slow leak
Dec 6, 2023 · Apt 1STFLO
Close - Heat/hot water
Entire building
Dec 6, 2023 · Apt 1STFLO
Close - Heat/hot water
Apartment only
Nov 25, 2023 · Apt 1STFLO
Close - Water leak
Damp spot
Nov 8, 2023 · Apt 1
Close - Heat/hot water
Apartment only
Oct 21, 2023 · Apt 1
Close - Plumbing
Water supply
Sep 22, 2023 · Apt 2FL
Close - Plumbing
Water supply
Sep 22, 2023 · Apt 1
Close - Unsanitary condition
Pests
Sep 11, 2023 · Apt 2
Close - Unsanitary condition
Pests
Sep 11, 2023 · Apt 2
Close - Paint/plaster
Wall
Sep 11, 2023 · Apt 2
Close - Safety
Window guard broken/missing
Sep 11, 2023 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 2006
- Floors
- 3
- Residential units
- 3
- Building area
- 2,901 ft²
- Lot area
- 2,315 ft²
- Zoning
- R5
- Community board
- 409
- Council district
- 29
- Block / lot
- 9502 / 120
- Assessed value
- $67,260
- Landmark / historic district
- No
Questions about 101-07 134 Street
Who owns 101-07 134 Street?
The owner of record in NYC Department of City Planning PLUTO data is 101-07 134th Street LLC.
Does 101-07 134 Street have violations?
Yes. NYC HPD has recorded 90 housing violations at this property.
Is 101-07 134 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 101-07 134 Street built?
City records list 2006 as the year it was built.
How many apartments are in 101-07 134 Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.