127-09 101 Avenue
Queens, NY 11419BBL 4-09472-0026Map
Owner of record: Narine, Hemraj
127-09 101 Avenue is a store building built in 1925 in Queens, 11419. It has 1 residential unit across 2 floors. The owner of record is Narine, Hemraj. HPD has recorded 41 housing violations here, most recently on May 11, 2021. 36 of the 41 most recent violations are still open.
- HPD violations
- 41
- DOB violations
- 23
- ECB violations
- 0
- HPD complaints
- 19
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 41
- BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
May 11, 2021 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures cooking range in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
May 11, 2021 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from north at east wall door frame in the 4th room from north located at apt 2ndflo, 2nd story, 1st apartment from west at north
Apr 29, 2021 · Apt 2NDFLO
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from west at north
Apr 29, 2021 · Apt 2NDFLO
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, presumed lead paint in an apartment with a child under six located at apt 2ndflo, 2nd story, 1st apartment from west at north
Apr 29, 2021 · Apt 2NDFLO
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door frame in the 4th room from north located at apt 2ndflo, 2nd story, 1st apartment from west at north
Apr 29, 2021 · Apt 2NDFLO
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from west at north
Apr 29, 2021 · Apt 2NDFLO
Closed — Violation closed - CImmediately hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the .. yard at north
Apr 29, 2021
Closed — Violation closed - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from west at north
Apr 29, 2021 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 2ndflo, 2nd story, 1st apartment from west at north
Apr 29, 2021 · Apt 2NDFLO
Open — Nov sent out
Show 31 more ↓
- CImmediately hazardous
M/d law abate the nuisance consisting of lockable slidebolt installed at iron security door leading to rear yard in the 1st room from north located at apt 2ndflo, 2nd story, 1st apartment from west at north
Apr 29, 2021 · Apt 2NDFLO
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from west at north
Apr 29, 2021 · Apt 2NDFLO
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from west at north
Apr 29, 2021 · Apt 2NDFLO
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2fl, 2nd story, 1st apartment from west at north
Apr 24, 2021 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair the broken or defective bell buzzer located at apt 2fl, 2nd story, 1st apartment from west at north
Apr 24, 2021 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2fl, 2nd story, 1st apartment from west at north
Apr 24, 2021 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 2fl, 2nd story, 1st apartment from west at north
Apr 24, 2021 · Apt 2FL
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2fl, 2nd story, 1st apartment from west at north
Apr 24, 2021 · Apt 2FL
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing located at apt 2fl, 2nd story, 1st apartment from west at north
Apr 24, 2021 · Apt 2FL
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 2fl, 2nd story, 1st apartment from west at north
Apr 24, 2021 · Apt 2FL
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 22, 2021
Open — Info nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from west at north
Apr 20, 2021 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Repair the broken or defective connection at wasteline at sink in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from west at north
Apr 20, 2021 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from west at north
Apr 20, 2021 · Apt 2NDFLO
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from west at north
Apr 20, 2021 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 2ndflo, 2nd story, 1st apartment from west at north
Apr 20, 2021 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). which is missing located at apt 2fl, 2nd story, 1st apartment from west at north
Feb 27, 2018 · Apt 2FL
Open — Nov sent out - BHazardous
Remove the illegal fastening lockable slide bolt at rear metal door ( secondary egress ) located at apt 2fl, 2nd story, 1st apartment from west at north
Feb 27, 2018 · Apt 2FL
Open — Nov sent out - BHazardous
Replace with new the missing ceramic wall tiles bathroom tub areas 2nd story apartment # 2, #426993.
Jul 3, 2003
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets bathtub of bathroom 2nd story apartment # 2.
Jul 3, 2003
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets kitchen sink 2nd story apartment # 2.
Jul 3, 2003
Open — Nov sent out - BHazardous
Abate the nuisance consisting of - exposed electrical wires ceiling center room 2nd story apartment #2.
Feb 11, 2003
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color - ceiling center room 2nd story apartment #2, #426993.
Feb 11, 2003
Open — Nov sent out - BHazardous
Replace with new the missing - ceramic floor tiles bathroom 2nd story apartment #2, #426993.
Dec 18, 2002
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective - marble saddle bathroom floor 2nd story apartment #2, #426993.
Dec 18, 2002
Open — Nov sent out - BHazardous
Abate the nuisance consisting of - concealed water leak ceiling 2nd from front room 2nd story apartment #2, #426993.
Dec 18, 2002
Open — Nov sent out - BHazardous
Abate the nuisance consisting of - concealed water leak front room ceiling 2nd story apartment #2, #426993.
Dec 18, 2002
Open — Nov sent out - BHazardous
Abate the nuisance consisting of - concealed water leak center room ceiling 2nd story apartment #2, #426993.
Dec 18, 2002
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin - roaches 2nd story apartment #2.
Dec 18, 2002
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin - mice 2nd story apartment #2.
Dec 18, 2002
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color - ceiling rear room 2nd story apartment 32, #426993.
Dec 18, 2002
Open — Nov sent out
DOB building violations · 23
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active
Show 13 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - active
ECB violations · 0
No ECB violations on record
Complaints
- Heat/hot water
Entire building
Apr 27, 2021 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Apr 25, 2021 · Apt 2
Close - Appliance
Electric/gas range
Apr 25, 2021 · Apt 2
Close - Heat/hot water
Apartment only
Apr 22, 2021 · Apt 2FL
Close - General
Bell/buzzer/intercom
Apr 22, 2021 · Apt 2FL
Close - Unsanitary condition
Mold
Apr 19, 2021 · Apt 2NDFLO
Close - Paint/plaster
Wall
Apr 19, 2021 · Apt 2NDFLO
Close - Plumbing
Toilet
Apr 19, 2021 · Apt 2NDFLO
Close - Unsanitary condition
Pests
Apr 19, 2021 · Apt 2NDFLO
Close - Plumbing
Toilet
Apr 19, 2021 · Apt 2NDFLO
Close
Show 9 more ↓
- Flooring/stairs
Floor
Apr 19, 2021 · Apt 2NDFLO
Close - Plumbing
Bathtub/shower
Apr 19, 2021 · Apt 2NDFLO
Close - Unsanitary condition
Pests
Apr 19, 2021 · Apt 2NDFLO
Close - Plumbing
Basin/sink
Apr 19, 2021 · Apt 2NDFLO
Close - Door/window
Door
Apr 19, 2021 · Apt 2NDFLO
Close - Appliance
Electric/gas range
Apr 19, 2021 · Apt 2NDFLO
Close - Electric
Wiring
Apr 19, 2021 · Apt 2NDFLO
Close - Unsanitary condition
Pests
Feb 18, 2018 · Apt 2FL
Close - Unsanitary condition
Pests
Jan 23, 2018 · Apt 2FLR
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Store building (K4)
- Year built
- 1925
- Floors
- 2
- Residential units
- 1
- Building area
- 2,200 ft²
- Lot area
- 1,873 ft²
- Zoning
- R6B
- Community board
- 409
- Council district
- 29
- Block / lot
- 9472 / 26
- Assessed value
- $134,550
- Landmark / historic district
- No
Questions about 127-09 101 Avenue
Who owns 127-09 101 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Narine, Hemraj.
Does 127-09 101 Avenue have violations?
Yes. NYC HPD has recorded 41 housing violations at this property.
Is 127-09 101 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 127-09 101 Avenue built?
City records list 1925 as the year it was built.
How many apartments are in 127-09 101 Avenue?
It has 1 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.