95-45 112 Street
Queens, NY 11419BBL 4-09414-0071Map
Owner of record: Dwarka, Ravi Persaud
95-45 112 Street is a walk-up apartment building built in 1930 in Queens, 11419. It has 3 residential units across 2 floors. The owner of record is Dwarka, Ravi Persaud. HPD has recorded 31 housing violations here, most recently on May 7, 2026. 23 of the 31 most recent violations are still open.
- HPD violations
- 31
- DOB violations
- 1
- ECB violations
- 3
- HPD complaints
- 7
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 31
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , 1st door frame from south at west wall, north wall, 1st door frame from south at west wall, north wall in the foyer located at apt 2r, 2nd story, 1st apartment from north at east
Mar 18, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the north wall in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east
Mar 18, 2026 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , north wall, ceiling, north wall, ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east
Mar 18, 2026 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , west wall, west wall in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east
Mar 18, 2026 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , ceiling, ceiling, ceiling in the private hallway located at apt 2r, 2nd story, 1st apartment from north at east
Mar 18, 2026 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , north wall, 1st door from south at west wall, north wall, 1st closet from south at west wall door, 1st door from south at west wall in the 1st room from east at north located at apt 2r, 2nd story, 1st apartment from north at east
Mar 18, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at the wash basin in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east
Mar 18, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east
Mar 18, 2026 · Apt 2R
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective defective hinges in the entrance located at apt 2r, 2nd story, 1st apartment from north at east
Mar 18, 2026 · Apt 2R
Open — Nov sent out
Show 21 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from north at east wall door in the 2nd room from east at north located at apt 2r, 2nd story, 1st apartment from north at east
Mar 18, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). south wall, east wall in the 2nd room from east at north located at apt 2r, 2nd story, 1st apartment from north at east
Mar 18, 2026 · Apt 2R
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). north wall in the private hallway located at apt 2r, 2nd story, 1st apartment from north at east
Mar 18, 2026 · Apt 2R
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). south wall in the foyer located at apt 2r, 2nd story, 1st apartment from north at east
Mar 18, 2026 · Apt 2R
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). south wall in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east
Mar 18, 2026 · Apt 2R
Open — Certification postponment granted - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2r, 2nd story, 1st apartment from north at east
Mar 18, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles approximate 10sq feet in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east
Mar 18, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles approximate 4sq feet in the private hallway located at apt 2r, 2nd story, 1st apartment from north at east
Mar 18, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door frame, north wall, west wall, 1st window frame from west at north wall in the 2nd room from east at north located at apt 2r, 2nd story, 1st apartment from north at east
Mar 18, 2026 · Apt 2R
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall, 1st window frame from east at south wall in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east
Mar 18, 2026 · Apt 2R
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, south wall in the private hallway located at apt 2r, 2nd story, 1st apartment from north at east
Mar 18, 2026 · Apt 2R
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door frame, 1st door frame from east at south wall, 1st door frame from south at west wall, 1st window frame from west at north wall, 1st window frame from north at east wall in the 1st room from east at north located at apt 2r, 2nd story, 1st apartment from north at east
Mar 18, 2026 · Apt 2R
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the foyer located at apt 2r, 2nd story, 1st apartment from north at east
Mar 18, 2026 · Apt 2R
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 1st window frame from east at south wall in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east
Mar 18, 2026 · Apt 2R
Open — Certification postponment granted - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 15, 2024
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 27, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 28, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 4, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 15, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 18, 2016
Closed — Violation dismissed
DOB building violations · 1
- Construction other optional
Structure was constructed or altered without a permit, in violation of 26-207. at rear of building erected wooden structure approx. 20'x30' x11'h, with 6"x6" non fire proof wooden posts approx. 10' apart
Jul 2, 2004
Vpw-violation unserved ecb-work without permit-active
ECB violations · 3
- Class - 2
Work w/o a permit work noted @ exp 3 (rear of premises) erected 1 wood canopy approx 25wx35lx12hsupported by 9 post remedy: obtain permit or restore to prior legal conditions
Oct 9, 2009
Resolve - Non-hazardous
Work without a permit. work noted: at rear premises erected wood canopy approx 20'wide, 35'long, 15'height with (9) 6"x 6"posts. remedy: obtain permit.
Nov 22, 2004 · Penalty $500
Active - Hazardous
Work without permit. in rear erected wood structure 20'x30'x11' high. sturture supported 6"x6" non fire proof wood posts approx 10' feet apart. obtain permit or restore to prior legal condition.
Jan 25, 1999
Resolve
Complaints
- Heat/hot water
Apartment only
Mar 17, 2026 · Apt 2R
Close - Appliance
Refrigerator
Mar 17, 2026 · Apt 2R
Close - Plumbing
Basin/sink
Mar 17, 2026 · Apt 2R
Close - Unsanitary condition
Pests
Mar 17, 2026 · Apt 2R
Close - Door/window
Window frame
Mar 17, 2026 · Apt 2R
Close - Flooring/stairs
Floor
Mar 17, 2026 · Apt 2R
Close - Unsanitary condition
Mold
Mar 17, 2026 · Apt 2R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1930
- Floors
- 2
- Residential units
- 3
- Building area
- 2,384 ft²
- Lot area
- 4,100 ft²
- Zoning
- R4A
- Community board
- 409
- Council district
- 29
- Block / lot
- 9414 / 71
- Assessed value
- $65,700
- Landmark / historic district
- No
HPD registration #418662, last renewed Aug 23, 2025.
Questions about 95-45 112 Street
Who owns 95-45 112 Street?
The owner of record in NYC Department of City Planning PLUTO data is Dwarka, Ravi Persaud.
Does 95-45 112 Street have violations?
Yes. NYC HPD has recorded 31 housing violations at this property.
Is 95-45 112 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 95-45 112 Street built?
City records list 1930 as the year it was built.
How many apartments are in 95-45 112 Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.