95-26 113 Street
Queens, NY 11419BBL 4-09414-0019Map
Owner of record: Le Capital NYC LLC
95-26 113 Street is a walk-up apartment building built in 2006 in Queens, 11419. It has 3 residential units across 3 floors. The owner of record is Le Capital NYC LLC. HPD has recorded 27 housing violations here, most recently on January 8, 2021. 24 of the 27 most recent violations are still open.
- HPD violations
- 27
- DOB violations
- 0
- ECB violations
- 9
- HPD complaints
- 87
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 27
- ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Jan 8, 2021
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jan 8, 2021
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
Jan 8, 2021
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jan 8, 2021
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jan 8, 2021
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jan 8, 2021
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant sheetrock at walls and ceiling at 3rd floor public hall
Jan 8, 2021
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of shopping carts and other house hold items in the vestibule at public hall, 1st story
Oct 27, 2017
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of garbage bags and other house hold items at public hall, 2nd story
Oct 27, 2017
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the grounds at the building front yard
Oct 27, 2017
Open — Nov sent out
Show 17 more ↓
- ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Oct 27, 2017
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1flr, 1st story, 1st apartment from south at west
Sep 22, 2017 · Apt 1FLR
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1stf, 1st story, 2nd apartment from south at west , section ''9526 130''
Sep 3, 2017 · Apt 1STF
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures ... in the entire apartment located at apt 3, 3rd story, 1st apartment from east at south
Jan 9, 2016 · Apt 3
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures gas range in the kitchen located at apt 3, 3rd story, 1st apartment from east at south
Jan 9, 2016 · Apt 3
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water 162f causing potential damage, thermometer # 6695 in the entire apartment located at apt 3, 3rd story, 1st apartment from east at south
Jan 9, 2016 · Apt 3
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 5th room from east located at apt 3, 3rd story, 1st apartment from east at south
Jan 9, 2016 · Apt 3
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood door at the corner base cabinet in the kitchen located at apt 3, 3rd story, 1st apartment from east at south
Jan 9, 2016 · Apt 3
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 3, 3rd story, 1st apartment from east at south
Jan 9, 2016 · Apt 3
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing located at apt 3, 3rd story, 1st apartment from east at south
Jan 9, 2016 · Apt 3
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 3, 3rd story, 1st apartment from east at south
Jan 9, 2016 · Apt 3
Open — Nov sent out - ANon-hazardous
Refit entrance door to building at public hall, 1st story
Dec 11, 2014
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2fl, 2nd story
Dec 7, 2011 · Apt 2FL
Open — Nov sent out - BHazardous
Replace with new the missing mortise lock to entrance metal door ( aka 95-26 113 street ) at public hall, 1st story
Oct 9, 2011
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3, 3rd story
Dec 21, 2010 · Apt 3
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of no electric supply all stories at public hall
Dec 21, 2010
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of scalding hot water. 142 degrees in the entire apartment located at apt 2, 2nd story
Dec 21, 2010 · Apt 2
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 9
- Class - 2
Work without a permit noted at cellar level erected full height with doros creating (3) bedrooms and (1) shower stall installed water and waste lines for (1) residential sink and shower stall also noted install
Jan 9, 2020 · Penalty $6,250
Active - Class - 2
Residence converted maintained or occupied as a dwelling for more than teh legally approved number of families authorizeed by the c/o or official records dob records and nb application #402296378 indicates a (3
Jan 9, 2020 · Penalty $10,000
Active - Class - 2
Altered/changed building occupied without a valid certificate of occupancy as per 28-118.3.1-28-118.3.2. noted nb applicatrion #402296378 for new buidling file date 06-13-2007 at time of inspection job #4022963
Jan 9, 2020 · Penalty $6,250
Active - Class - 3
Violation of parking regulations in a residential district. at side ofpremises in driveway observed white chevy van as dead storage. vin #1gchg35r211135631 w/no plates. remedy: conform to parking violations.
Oct 10, 2013 · Penalty $500
Active - Class - 2
Sec. 28-118.1. occupancy w/o a valid c/o. noted: job #402296378 - nb is not signed off. the bldg is completely occupied. remedy: obtain valid c/o.
Jul 5, 2013 · Penalty $4,000
Active - Class - 2
Failure to comply w/commissioner's order to file c of c w/dept of bldgs for violation open ecb nov #'s 34644799p & 34855125z. remedy: complyw/the commissioner's order to file certificate of correction.
Jun 3, 2011 · Penalty $2,000
Resolve - Class - 2
Failure to comply w/ the commissioner order to correct the violation & file c of c for vio 34644799p 052108c09hd02 issued for new bldg 402296378 occupied w/o obtaining a c of o remedy: obtain a c/o & file
May 12, 2010 · Penalty $2,000
Resolve - Hazardous
Occupancy contrary to dob records dobs records indicate cellar of a 3 family house as storage and accessory use illegal occupancy noted cellar is now used as classroom with approx 12 seatings and 3 computer
May 21, 2008 · Penalty $800
Active - Non-hazardous
New bldg occupied w/o a valid c of o noted nb 402296378 3 family now premises is being occupied w/o signed off of application remedy: obtain a valid c of o
May 21, 2008 · Penalty $700
Active
Complaints
- Unsanitary condition
Sewage
May 21, 2026 · Apt APT1
Close - Heat/hot water
Apartment only
Jan 23, 2021 · Apt 3
Close - Heat/hot water
Apartment only
Jan 6, 2021 · Apt 3FL
Close - Heat/hot water
Apartment only
Mar 2, 2020 · Apt FLR1
Close - Heat/hot water
Apartment only
Mar 2, 2020 · Apt FLR1
Close - Heat/hot water
Entire building
Feb 28, 2020 · Apt 3FLR
Close - Heat/hot water
Apartment only
Jan 24, 2020 · Apt FIRSTF
Close - Heat/hot water
Apartment only
Jan 24, 2020 · Apt 1STFL
Close - Heat/hot water
Apartment only
Jan 22, 2020 · Apt FIRSTF
Close - Heat/hot water
Apartment only
Jan 21, 2020 · Apt FLR1
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Dec 6, 2019 · Apt 2C
Close - Heat/hot water
Apartment only
Jan 5, 2019 · Apt 1STF
Close - Heat/hot water
Apartment only
Jan 8, 2018 · Apt 1STF
Close - Heat/hot water
Apartment only
Dec 27, 2017 · Apt 1STF
Close - Heat/hot water
Apartment only
Oct 26, 2017 · Apt 1STF
Close - Electric
Power outage
Oct 26, 2017 · Apt BLDG
Close - Electric
No lighting
Oct 24, 2017 · Apt 1
Close - Electric
No lighting
Oct 24, 2017 · Apt 1
Close - Electric
No lighting
Oct 24, 2017 · Apt 1
Close - Heat/hot water
Apartment only
Oct 24, 2017 · Apt 1
Close - Heat/hot water
Apartment only
Oct 17, 2017 · Apt 1STF
Close - Heat/hot water
Apartment only
Sep 21, 2017 · Apt 1FLR
Close - Heat/hot water
Apartment only
Sep 8, 2017 · Apt 1STF
Close - Heat/hot water
Apartment only
Aug 27, 2017 · Apt 1STF
Close - Heat/hot water
Apartment only
Aug 10, 2017 · Apt 1STF
Close - Heat/hot water
Apartment only
Aug 5, 2017 · Apt 1
Close - Unsanitary condition
Garbage/recycling storage
Feb 11, 2017 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 8, 2016 · Apt 3
Close - Electric
Power outage
Jan 7, 2016 · Apt 3
Close - Heat/hot water
Apartment only
Jan 7, 2016 · Apt 3
Close - Heat/hot water
Apartment only
Nov 24, 2015 · Apt 3FL
Close - Heat/hot water
Apartment only
Nov 11, 2015 · Apt 3
Close - Heat/hot water
Apartment only
Nov 10, 2015 · Apt 3
Close - Plumbing
Toilet
Aug 26, 2015 · Apt 3
Close - Heat/hot water
Apartment only
Aug 5, 2015 · Apt 3
Close - Plumbing
Toilet
Aug 5, 2015 · Apt 3
Close - Electric
Power outage
Aug 5, 2015 · Apt 3
Close - Electric
No lighting
Jul 15, 2015 · Apt 3
Close - Heat/hot water
Apartment only
Dec 8, 2014 · Apt 3RDFL
Close - Heat/hot water
Apartment only
Dec 6, 2014 · Apt 3FLR
Close - Door/window
Door
Dec 6, 2014 · Apt 3FLR
Close - Heating
Heat related
Jan 6, 2012 · Apt 2
Close - Heating
Heat related
Jan 4, 2012 · Apt 2
Close - Heating
Heat related
Jan 4, 2012 · Apt 2
Close - Heating
Heat related
Dec 30, 2011 · Apt 2
Close - Heating
Heat related
Dec 28, 2011 · Apt 2
Close - Heating
Heat related
Dec 24, 2011 · Apt 2
Close - Heating
Heat related
Dec 20, 2011 · Apt 2FL
Close - Heating
Heat related
Dec 19, 2011 · Apt 2
Close - Heating
Heat related
Nov 29, 2011 · Apt 2FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 2006
- Floors
- 3
- Residential units
- 3
- Building area
- 3,060 ft²
- Lot area
- 2,500 ft²
- Zoning
- R4A
- Community board
- 409
- Council district
- 29
- Block / lot
- 9414 / 19
- Assessed value
- $74,940
- Landmark / historic district
- No
Questions about 95-26 113 Street
Who owns 95-26 113 Street?
The owner of record in NYC Department of City Planning PLUTO data is Le Capital NYC LLC.
Does 95-26 113 Street have violations?
Yes. NYC HPD has recorded 27 housing violations at this property.
Is 95-26 113 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 95-26 113 Street built?
City records list 2006 as the year it was built.
How many apartments are in 95-26 113 Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.