120-23 Atlantic Avenue
Queens, NY 11418BBL 4-09352-0028Map
Owner of record: 121 Atlantic Avenue LLC
120-23 Atlantic Avenue is a store building built in 1931 in Queens, 11418. The owner of record is 121 Atlantic Avenue LLC. HPD has recorded 20 housing violations here, most recently on February 12, 2024. 5 of the 20 most recent violations are still open.
- HPD violations
- 20
- DOB violations
- 12
- ECB violations
- 20
- HPD complaints
- 55
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 20
- BHazardous
Remove all encumbrances consisting of household articles at public hall, 1st story
Feb 12, 2024
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak over ceiling in the 2nd room from north located at apt 3fl, 3rd story, 1st apartment from south at west
Nov 10, 2023 · Apt 3FL
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 2nd room from north located at apt 3fl, 3rd story, 1st apartment from south at west
Nov 10, 2023 · Apt 3FL
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective door frame in the 3rd room from north at east located at apt 3fl, 3rd story, 1st apartment from south at west
Nov 10, 2023 · Apt 3FL
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees f at all hot water fixtures in the entire apartment located at apt 3fl, 3rd story, 1st apartment from south at west
Nov 10, 2023 · Apt 3FL
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of scalding hot water exceeds the maximum allowable operating temperature of 130 f (found 158 f). thermometer #3482. in the entire apartment located at apt 3, 3rd story
Feb 3, 2018 · Apt 3
Open — Nov certified late - BHazardous
Repair the broken or defective connection wasteline at sink in the kitchen located at apt 3, 3rd story, 2nd apartment from south at west
Nov 26, 2009 · Apt 3
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 3, 3rd story, 2nd apartment from south at west
Nov 26, 2009 · Apt 3
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock at front entrance door to building 1 story.
Nov 1, 2009
Closed — Violation closed - BHazardous
Provide adequate supply of hot water for the fixtures bathroom & kitchen located at apt 3, 3rd story
Nov 1, 2009 · Apt 3
Closed — Violation closed
Show 10 more ↓
- BHazardous
Provide adequate supply of cold water for the fixtures bathroom & kitchen located at apt 3, 3rd story
Nov 1, 2009 · Apt 3
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice at entire apartment located at apt 3, 3rd story
Nov 1, 2009 · Apt 3
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles in the bathroom located at apt 3, 3rd story
Nov 13, 2001 · Apt 3
Closed — Violation closed - BHazardous
Replace with new the missing light fixture ceiling in the bathroom located at apt 3, 3rd story
Nov 13, 2001 · Apt 3
Closed — Violation closed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 3, 3rd story
Nov 13, 2001 · Apt 3
Closed — Violation closed - ANon-hazardous
Refit entrance door in the bathroom located at apt 3, 3rd story
Nov 13, 2001 · Apt 3
Closed — Violation closed - BHazardous
Properly repair the broken or defective celotex celing in the 2nd room from north located at apt 3, 3rd story
Nov 13, 2001 · Apt 3
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets kitchensink in the kitchen located at apt 3, 3rd story
Nov 13, 2001 · Apt 3
Closed — Violation closed - BHazardous
Replace with new the missing entrance door in the 1st room from north located at apt 3, 3rd story
Nov 13, 2001 · Apt 3
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock installed at front entrance door to building at public hall, 1st story
Nov 13, 2001
Closed — Violation closed
DOB building violations · 12
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 18, 2012
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 18, 2012
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 20, 2010
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Construction other optional
Failure to designate operations subject to controlled inspectinos (spe cial instruction) on plans. work ongoing under alt. 1 permit #4109716 6. no special inspection items listed on arch or structural plans remedy: provide ra/ppe note of required inspections to be kept at job site (stamped, dated, signed) fax copy to sepex
Jul 29, 2009
Dob violation - dismissed - Construction other optional
Work does not conform to approved construction documents and/or approv ed amendments at exp. 2 rear of site. plan calls for removal of block wall and installation of new doorway. plans lack details how to comp lete this concerns for egress out of this room noted remedy: provide approved amendments. stop all work
Jun 29, 2009
Dob violation - dismissed - Construction other optional
Work does not conform to approved construction documents and or amendm ents contractor made alteration to rof rafters at exp 1 rt side of bui lding 2nd set of structural steel i beams contractor added 2 2x10 appr ox 4ft long to each rafter then bolted them together because rafter di d not site on i beam remedy: conform to approved documents or approved
Jun 6, 2009
Dob violation - dismissed - Construction other optional
Work does not conform to approved plans construction documents and/or amendments contractor removing concrete block wall at exposure #4 from slab to stell beam and removing interior drywall at exp #1 documents indicate installation of masonry parapet only remedy: stop all work conform to approved documents or amendments
Jan 21, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed
Show 2 more ↓
- Unsafe buildings none
Ub-unsafe buildings none
Jun 18, 2001
V%*-dob violation - dismissed - Construction other optional
C-construction other optional
Sep 29, 1995
Vp*-violation unserved ecb- dismissed
ECB violations · 20
- Class - 1
Work w/o a permit. noted: at rear of 91-59 120 st erected a steel frame structure w/roof and walls made of corrugated metal sheets approx 25' x 60' x 12' high. @ corner bldg address 120-21 atlantic ave, created
Jan 18, 2012 · Penalty $1,600
Resolve - Class - 1
Failure to maintain bldg in a code-compliant manner. defect noted: at 120-01, 120-03 and 91-59 120 street at various locations exposed electrical wires, open electrical boxes or circuit breaker boxes, several
Jan 18, 2012 · Penalty $1,000
Resolve - Class - 1
Sec. 3314.8;27-1009a. failure to provide required guardrails & toe boards for scaffold platform. contractor failed to provide guardrails forsupported scaffold at exp 1 approx 19'high. 2 men working on scaffold
Jun 29, 2009 · Penalty $1,600
Resolve - Class - 2
Sec. 3314.4.6;rcny52-05. unqualified person using supported scaffold at time of inspection 3 men using supported scaffold w/o user cards. noguardrails provided on scaffold at time of inspection. *stop all work
Jun 29, 2009
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements const debris not properly stored or removed from site contractor failed to maintain housekeeping approx 25 yrds of debris thruout site stop all
Jun 6, 2009 · Penalty $800
Resolve - Class - 2
Sec.28.105.12.1 performing const work out side permitted hrs and days w/o obtaining after hrs permit contractor and 10 men were working sat 6/6/09 w/o permit at 120-23 atlantic ave doing const work job 41022005
Jun 6, 2009 · Penalty $800
Resolve - Class - 1
Sec.bc3314.8 failure to provide required guardrails and toeboards for scaffold platform contractor failed to provide any guardrails toe boards on approx 180 running ft of scaffold stop all work call dob for
Jun 6, 2009 · Penalty $1,600
Resolve - Class - 2
Altered building occupied w/o a valid c of o. noted: job #410157244 convert existing warehouse to building material sales(failiey) job not signed off building occupied. remedy: obtain valid c of o or discontinu
Apr 16, 2009 · Penalty $500
Resolve - Class - 2
Failure to safeguard all persons and property affected by constructionoperations no smoking sign w/in construction site not observed of inadequate in violation of nyc fire code 1404.1 & fc 310 contractor failed
Feb 17, 2009 · Penalty $1,200
Resolve - Class - 2
Sec bc3301.9.1 rcny 27-04 misc violations failure to sign w/ the wording to anonymously report unsafe conditions at this work site that endangers workers call 311 on new bldg or demolition site contractor faile
Feb 17, 2009
Resolve
Show 10 more ↓
- Class - 2
Failure to safeguard all persons and property affected by constructionoperations panels at exp#4 121st is open to public correct immediately job#410207592 rem: comply w/ notice of violation
Feb 17, 2009 · Penalty $1,200
Resolve - Class - 1
Sec. 903.2;27-954. failure to provide required sprinkler protection. contractor removed during demolition operations or failed to maintain sprinkler system for fire suppression. sprinkler heads missing &
Jan 21, 2009 · Penalty $1,600
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements. construction materials and debris not properly stored or removed from site. contractor has failed to remove approx 30 cu yds of combustible
Jan 21, 2009
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operations. "no smoking" signs w/i construction site not observed or inadequate in violation of nyc fire code 1404.1. at time of inspection
Jan 21, 2009 · Penalty $1,200
Resolve - Class - 2
Work does not conform to approved construction documents. premises undergoing gut renovation w/ demolition of interior partitions and load mearing masonry wall throughout 120-05 thru 120-23 contrary to plan
Jan 20, 2009
Resolve - Class - 1
Occupancy contrary to department of building records. dob records alt 1740/87 indicates a parking & loading area (at 1 corner of the buildings) at 121 st side. illegal occupancy noted: now parking & loading ar
Dec 31, 2008 · Penalty $12,000
Resolve - Non-hazardous
Operation of a place of assembly contrary to the c of o when the current c of o does not allow the operation of a p.a. bldg set up to seat over 200 people. app #400914383 filed for pa approved but never permite
Aug 8, 2005 · Penalty $350
Resolve - Hazardous
Work without a permit;in that the removal of bearing partition running east to west approximately 20'-25' long has beeb removes.roof collapsed in area alobe.remedy:stop all work immediately obtain all neceaary
Jun 17, 2001
Resolve - Non-hazardous
Failure to maintain building in that partial of collapsed approximately 25'x11'0 remedy:repair roof and make premises safe
Jun 17, 2001 · Penalty $800
Resolve - Non-hazardous
Altered building occupied without a valid certificate of occupancy-location entire.remedy:obtain valid c of o.
Jan 22, 2001 · Penalty $350
Resolve
Complaints
- Unsanitary condition
Mold
Mar 28, 2024 · Apt 2
Close - Unsanitary condition
Garbage/recycling storage
Jan 24, 2024 · Apt 2
Close - Unsanitary condition
Mold
Jan 24, 2024 · Apt 2
Close - Door/window
Door
Nov 9, 2023 · Apt 3FL
Close - Paint/plaster
Ceiling
Nov 9, 2023 · Apt 3FL
Close - Paint/plaster
Ceiling
Nov 9, 2023 · Apt 3FL
Close - Electric
Wiring
Nov 9, 2023 · Apt 3FL
Close - Safety
Smoke detector
Nov 9, 2023 · Apt 3FL
Close - Water leak
Heavy flow
Nov 9, 2023 · Apt 3FL
Close - Heating
Heat related
Dec 29, 2010 · Apt 3
Close
Show 40 more ↓
- General
Windows
Dec 29, 2010 · Apt 3
Close - Paint/plaster
Ceiling
Dec 29, 2010 · Apt 3
Close - Nonconst
Vermin
Dec 29, 2010 · Apt 3
Close - Plumbing
Basin/sink
Dec 29, 2010 · Apt 3
Close - Heating
Heat related
Dec 29, 2010 · Apt 59
Close - Heating
Heat related
Mar 28, 2010 · Apt 3
Close - Heating
Heat related
Jan 25, 2010 · Apt 3
Close - Heating
Heat related
Jan 5, 2010 · Apt 59
Close - Plumbing
Water-leaks
Jan 3, 2010 · Apt 3
Close - Nonconst
Vermin
Jan 3, 2010 · Apt 3
Close - Plumbing
Basin/sink
Jan 3, 2010 · Apt 3
Close - General
Windows
Jan 3, 2010 · Apt 3
Close - Heating
Heat related
Jan 3, 2010 · Apt 3
Close - Heating
Heat related
Jan 2, 2010 · Apt 59
Close - Plumbing
Water-leaks
Dec 20, 2009 · Apt 3
Close - Plumbing
Basin/sink
Dec 20, 2009 · Apt 3
Close - Nonconst
Vermin
Dec 20, 2009 · Apt 3
Close - Heating
Heat related
Dec 20, 2009 · Apt 3
Close - Plumbing
Water-leaks
Dec 5, 2009 · Apt 3
Close - Plumbing
Basin/sink
Dec 5, 2009 · Apt 3
Close - Nonconst
Vermin
Dec 5, 2009 · Apt 3
Close - Heating
Heat related
Dec 5, 2009 · Apt 3
Close - Heating
Heat related
Dec 2, 2009 · Apt 3
Close - Heating
Heat related
Nov 30, 2009 · Apt 3
Close - Heating
Heat related
Nov 28, 2009 · Apt 3
Close - Heating
Heat related
Nov 25, 2009 · Apt 3
Close - Heating
Heat related
Nov 23, 2009 · Apt 3
Close - Plumbing
Basin/sink
Nov 18, 2009 · Apt 3
Close - Nonconst
Vermin
Nov 18, 2009 · Apt 3
Close - Heating
Heat related
Nov 18, 2009 · Apt 3
Close - Heating
Heat related
Nov 14, 2009 · Apt 3
Close - Heating
Heat related
Nov 13, 2009 · Apt 3
Close - Heating
Heat related
Nov 12, 2009 · Apt 3
Close - Nonconst
Vermin
Oct 27, 2009 · Apt 3
Close - Heating
Heat related
Oct 27, 2009 · Apt 3
Close - Nonconst
Vermin
Oct 24, 2009 · Apt 3
Close - Heating
Heat-plant
Oct 24, 2009 · Apt 3
Close - Heating
Heat related
Oct 20, 2009 · Apt 3
Close - General
Stairs
Oct 17, 2009 · Apt 3
Close - Heating
Heat related
Oct 17, 2009 · Apt 3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Store building (K1)
- Year built
- 1931
- Floors
- 1
- Residential units
- —
- Building area
- 22,208 ft²
- Lot area
- 16,903 ft²
- Zoning
- R6A
- Community board
- 409
- Council district
- 29
- Block / lot
- 9352 / 28
- Assessed value
- $1,356,300
- Landmark / historic district
- No
Questions about 120-23 Atlantic Avenue
Who owns 120-23 Atlantic Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 121 Atlantic Avenue LLC.
Does 120-23 Atlantic Avenue have violations?
Yes. NYC HPD has recorded 20 housing violations at this property.
Is 120-23 Atlantic Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 120-23 Atlantic Avenue built?
City records list 1931 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.