119-22 Jamaica Avenue
Queens, NY 11418BBL 4-09329-0009Map
Owner of record: Hanasab Moosa
119-22 Jamaica Avenue is a mixed residential and retail building built in 1915 in Queens, 11418. It has 2 residential units across 3 floors. The owner of record is Hanasab Moosa. HPD has recorded 17 housing violations here, most recently on October 13, 2004. 17 of the 17 most recent violations are still open.
- HPD violations
- 17
- DOB violations
- 9
- ECB violations
- 19
- HPD complaints
- 31
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 17
- BHazardous
Properly repair with similar material the broken or defective bricks and mortar joints at east court
Oct 13, 2004
Open — Nov sent out - BHazardous
Properly repair the broken or defective locking device at door vestibule to 1sty at public hall
Oct 12, 2004
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3, 3rd story
Oct 12, 2004 · Apt 3
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of no electric service provided to entire building
Oct 12, 2004 · Apt 3
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wooden floor in the foyer located at apt 3, 3rd story
Oct 12, 2004 · Apt 3
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling in the entire apartment located at apt 3, 3rd story
Oct 12, 2004 · Apt 3
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective sagging wood floors rear room 2nd room from rear and kitchen 2nd story apartment, er -1 d.o.b 4056884.
Mar 31, 2002
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceilings throughout where needed 3rd story apartment #2.
Mar 26, 2002
Open — Nov sent out - BHazardous
Abate the nuisance consisting of extension cord running from light fixture 1st story public hall to 2nd story apartment.
Mar 26, 2002
Open — Nov sent out - BHazardous
Abate the nuisance consisting of exposed electric wires in ceiling 1st story public hall.
Mar 26, 2002
Open — Nov sent out
Show 7 more ↓
- BHazardous
Properly repair the broken or defective locking device entrance door to building.
Mar 26, 2002
Open — Nov sent out - BHazardous
Abate the nuisance consisting of expose electric wires ceilings and 2nd story public hall.
Mar 26, 2002
Open — Nov sent out - BHazardous
Abate the nuisance consisting of concealed water leak ceilings bathroom and kitchen 2nd story apartment.
Mar 26, 2002
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color wall and ceiling rear room 2nd story apartment.
Mar 26, 2002
Open — Nov sent out - BHazardous
Abate the nuisance consisting of exposed electric wires ceilings rear room and front room 2nd story apartment.
Mar 26, 2002
Open — Nov sent out - BHazardous
Properly repair the broken or defective door bell to 2nd story apartment.
Mar 26, 2002
Open — Nov sent out - BHazardous
Properly repair the broken or defective locking device entrance door to building.
Mar 26, 2002
Open — Nov sent out
DOB building violations · 9
- Immediate emergency anythingoptional
Remedy: seal up bsmt doors opening to secure against unauthorized acce ss and safeguard public
Nov 14, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 11, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 16, 2022
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 5, 2022
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - dismissed
ECB violations · 19
- Class - 2
At time of inspection at above premises observed sidewalk shed q01011400-sh and construction fence q00992022-fn at construction site on expired permits since 7/5/2024, renew permit
Oct 17, 2024 · Penalty $6,250
Active - Class - 2
Sidewalk shed bc3307.6. observed pedestrian protection sidewalk shed job#q01011400 in place covering exposure#1 not to codes-vertical member not plumb and obstructing exposure#2 neighboring property building ac
Jul 26, 2024 · Penalty $5,000
Resolve - Class - 2
Job fence job# q00992022 permit expired on 07/05/24. observed job fence in place covering exposure#1 with permit job#q00992022 expired since 07/05/2024 with no other valid job fence permit in dob records (bis/d
Jul 26, 2024 · Penalty $6,250
Active - Class - 2
Sidewalk shed job# q01011400 permit expired on 07/05/24. observed sidewalk shed covering exposure#1 with permit job#q01011400 expired since 07/05/24 with no other valid permit in dob records (bis/dob now, sidew
Jul 26, 2024 · Penalty $6,250
Active - Class - 2
At time of inspection i observed electrical conduit and light bulbs installed under the sidewalk shed. review of dob records revealed that there was no electrical permits for the work that had been installed. p
Jun 28, 2024
Resolve - Class - 2
I observed a sidewalk shed installed at exposure #1 before sunrise with no under shed lights to provide safe and illuminated passage for anyone walking under the shed; this created a hazardous, dark and dangero
Jun 28, 2024 · Penalty $5,000
Resolve - Class - 2
At the time of inspection i observed that there was no info panel on the sidewalk shed. a info panel is required by code to be put in place for identification of the construction site from the street.provide in
Jun 28, 2024 · Penalty $3,125
Resolve - Class - 1
Failure to maintain building in a code compliant manner: at exposure (1) basement metal doors on public sidewalk covered up with concrete. now in disrepair with concrete breaking up and compromising metal doors
Nov 14, 2023 · Penalty $1,250
Resolve - Class - 1
Failure to maintain bldg in code complaint manner. noted: at exp#1 broken windows boarded up w/plywood at exp#1&2 missing parapet cap approx3 linear ft each & at exp#2 several cracks in wall & missing mortar
Feb 17, 2022 · Penalty $3,125
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. note: at exp#1 in state of disrepair. upper floor windows broken out & boarded up. at roof level parapet is missing a cap & at the rear extension the roof has
Nov 24, 2021 · Penalty $12,500
Active
Show 9 more ↓
- Class - 1
Failure to maintain building in code compliant manner.note:facade at exp #1 in state of disrepair.windows at 3rd floor broken out and boarded up. at roof level cap of parapet is missing and at extension at rear
Oct 7, 2021 · Penalty $3,125
Active - Class - 1
Failure to maintain building in code compliant matter. noted: facade of building exp-1 in state of disrepair. windows on third floor are broken and loose glass hanging over a busy sidewalk. second floor loose w
Aug 27, 2021 · Penalty $250
Resolve - Hazardous
Failure to maintain exterior bldg wall.note:at east wall (facade) mortar joints missing,spalling loose bricks.remedy:maintain exterior wall.
Jun 7, 2005 · Penalty $800
Resolve - Hazardous
Occupancy contrary to that allowed by bldg. department records. a legal 2 family and store has been converted to a store, 2 families and on sro. illegal occupancy noted: at 3rd floor front 2 rooms were
Feb 17, 2005 · Penalty $2,000
Active - Hazardous
Failure to maintain bldg. noted at 2nd; 3rd floor east wall floor has dropped 3 to 4 inches causing floor to slope severely. remedy: maintain bldg.
Feb 17, 2005 · Penalty $2,000
Active - Hazardous
Failure to maintain bldg noted at 2nd & 3rd floor east wall floor has dropped 3 to 4 inches approx 6'in lenght causing floors to slope severly also at east wall same area in cellar 15 to 20 joists deteriorated
Oct 13, 2004 · Penalty $800
Active - Hazardous
Occupancy contrary to that allowed by the dept of bldg records a legal3 family & store illegal converted to having an additional apt at 3rd floor created 1 sro with padlock on door at front part of floor havin
Oct 13, 2004 · Penalty $800
Active - Non-hazardous
Failure to maintain:on 1st floor rear side area hole in roof; in cellar ceiling all over missing,fire proof materials and 2nd floor in bathroom, window frame wood rotted.remedy: repairs all area; maintain prome
May 31, 2000 · Penalty $350
Active - Hazardous
Failure to maintain exterior bldg wall defect is broken and defective brickwork along with corroded and missing mortor joints entire length of rear wall 2 stry.remedy maintain exterior bldg wall.
Aug 7, 1996
Resolve
Complaints
- Construction
Collapsing building
Oct 13, 2004 · Apt 3FLR
Close - General
Stairs
Oct 13, 2004 · Apt 3FLR
Close - General
Windows
Oct 13, 2004 · Apt 3FLR
Close - Electric
Electric-supply
Oct 13, 2004 · Apt 3FLR
Close - Heating
Heat related
Oct 13, 2004 · Apt 3FLR
Close - General
Floor
Oct 13, 2004 · Apt 3FLR
Close - General
Floor
Oct 13, 2004 · Apt 3FLR
Close - Paint/plaster
Wall
Oct 13, 2004 · Apt 3FLR
Close - Paint/plaster
Wall
Oct 13, 2004 · Apt 3FLR
Close - Plumbing
Water-leaks
Oct 13, 2004 · Apt 3FLR
Close
Show 21 more ↓
- Paint/plaster
Ceiling
Oct 13, 2004 · Apt 3FLR
Close - Paint/plaster
Ceiling
Oct 13, 2004 · Apt 3FLR
Close - Plumbing
Water-leaks
Oct 13, 2004 · Apt 3FLR
Close - Paint/plaster
Ceiling
Oct 13, 2004 · Apt 3FLR
Close - Paint/plaster
Ceiling
Oct 13, 2004 · Apt 3FLR
Close - General
Locks
Oct 12, 2004 · Apt 3
Close - Construction
Collapsing building
Oct 12, 2004 · Apt 3
Close - Plumbing
Water-leaks
Oct 12, 2004 · Apt 3
Close - Paint/plaster
Wall
Oct 12, 2004 · Apt 3
Close - General
Floor
Oct 12, 2004 · Apt 3
Close - Electric
Electric-supply
Oct 12, 2004 · Apt 3
Close - Heating
Heat related
Oct 12, 2004 · Apt 3
Close - Heating
Heat related
Dec 2, 2003 · Apt 3 FLR
Close - Plumbing
Water supply
Oct 6, 2003 · Apt 2FL
Close - Nonconst
Vermin
Oct 6, 2003 · Apt 2FL
Close - Paint/plaster
Wall
Oct 6, 2003 · Apt 2FL
Close - General
Floor
Oct 6, 2003 · Apt 2FL
Close - General
Floor
Oct 6, 2003 · Apt 2FL
Close - Nonconst
Vermin
Oct 6, 2003 · Apt 2FL
Close - Heating
Heat related
Oct 6, 2003 · Apt 2FL
Close - Heating
Heat related
Jul 21, 2003 · Apt 3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 1915
- Floors
- 3
- Residential units
- 2
- Building area
- 3,000 ft²
- Lot area
- 1,600 ft²
- Zoning
- M1-5
- Community board
- 409
- Council district
- 29
- Block / lot
- 9329 / 9
- Assessed value
- $28,200
- Landmark / historic district
- No
Questions about 119-22 Jamaica Avenue
Who owns 119-22 Jamaica Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Hanasab Moosa.
Does 119-22 Jamaica Avenue have violations?
Yes. NYC HPD has recorded 17 housing violations at this property.
Is 119-22 Jamaica Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 119-22 Jamaica Avenue built?
City records list 1915 as the year it was built.
How many apartments are in 119-22 Jamaica Avenue?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.