roofy

83-21 Lefferts Boulevard

Queens, NY 11415BBL 4-09231-0089Map

Owner of record: Holliswood Properties LLC

83-21 Lefferts Boulevard is a walk-up apartment building built in 1975 in Queens, 11415. It has 4 residential units across 3 floors. The owner of record is Holliswood Properties LLC. HPD has recorded 67 housing violations here, most recently on May 11, 2026. 25 of the 50 most recent violations are still open.

HPD violations
67
DOB violations
0
ECB violations
0
HPD complaints
40

What to know

Concern
4 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 11, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 67

  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    May 11, 2026

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing

    May 11, 2026

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    May 11, 2026

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story

    May 11, 2026

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    May 11, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    May 11, 2026

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at missing at public hall, 1st story

    May 11, 2026

    Closed — Violation dismissed
  • A

    Properly repair or replace the broken or defective base cabinet at south wall in the kitchen located at apt 3, 3rd story, 1st apartment from south at west

    May 11, 2026 · Apt 3

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 3, 3rd story, 1st apartment from south at west

    May 11, 2026 · Apt 3

    Closed — Violation dismissed
  • A

    Properly repair or replace the broken or defective electrical light fixture at ceiling in the private hallway located at apt 3, 3rd story, 1st apartment from south at west

    May 11, 2026 · Apt 3

    Closed — Violation dismissed
Show 40 more ↓
  • A

    Properly repair or replace the broken or defective electrical switch cover at west wall in the private hallway located at apt 3, 3rd story, 1st apartment from south at west

    May 11, 2026 · Apt 3

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective electrical light fixture at ceiling in the 3rd room from north at east located at apt 3, 3rd story, 1st apartment from south at west

    May 11, 2026 · Apt 3

    Closed — Violation dismissed
  • A

    Properly repair or replace the broken or defective electrical outlet cover at north wall in the 3rd room from north at east located at apt 3, 3rd story, 1st apartment from south at west

    May 11, 2026 · Apt 3

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 3rd room from north at east located at apt 3, 3rd story, 1st apartment from south at west

    May 11, 2026 · Apt 3

    Closed — Violation dismissed
  • A

    Properly repair or replace the broken or defective door in the 3rd room from north at west located at apt 3, 3rd story, 1st apartment from south at west

    May 11, 2026 · Apt 3

    Closed — Violation dismissed
  • A

    Properly repair or replace the broken or defective door casing in the 3rd room from north at west located at apt 3, 3rd story, 1st apartment from south at west

    May 11, 2026 · Apt 3

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 3rd room from north at west located at apt 3, 3rd story, 1st apartment from south at west

    May 11, 2026 · Apt 3

    Closed — Violation dismissed
  • A

    Properly repair or replace the broken or defective caulking along washbasin at east wall in the 3rd bathroom from north at west located at apt 3, 3rd story, 1st apartment from south at west

    May 11, 2026 · Apt 3

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling and south wall in the 3rd bathroom from north at west located at apt 3, 3rd story, 1st apartment from south at west

    May 11, 2026 · Apt 3

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective ceramic wall tiles at north wall in the 3rd bathroom from north at west located at apt 3, 3rd story, 1st apartment from south at west

    May 11, 2026 · Apt 3

    Closed — Violation dismissed
  • A

    Provide a proper seat for water closet in the bathroom located at apt 3, 3rd story, 1st apartment from south at west

    May 11, 2026 · Apt 3

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 7, 2026

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... less than 1o sq ft at ceiling in the kitchen located at apt 3, 3rd story, 1st apartment from south at west original violation 18743207 issued 27-mar-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Mar 27, 2026 · Apt 3

    Open — Notice of issuance sent to tenant
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at east located at apt 3, 3rd story, 1st apartment from south at west

    Mar 27, 2026 · Apt 3

    Open — Certification postponment denied
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Mar 27, 2026

    Open — Certification postponment denied
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor not posted at public hall, 1st story

    Mar 27, 2026

    Open — Certification postponment denied
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox not posted at public hall, 1st story

    Mar 27, 2026

    Open — Certification postponment denied
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings not posted

    Mar 27, 2026

    Open — Certification postponment denied
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Mar 27, 2026

    Open — Certification postponment denied
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system near or at mailbox at public hall, 1st story

    Mar 27, 2026

    Open — Nov sent out
  • C

    Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at at front yard

    Mar 27, 2026

    Open — Nov sent out
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at front yard

    Mar 27, 2026

    Open — Certification postponment denied
  • C

    Properly repair or replace the broken or defective hydroponic baseboard cover in the 2nd room from north at east located at apt 3, 3rd story, 1st apartment from south at west

    Mar 27, 2026 · Apt 3

    Open — Nov sent out
  • B

    Properly secure the loose entrance door in the 4th room from north at west located at apt 3, 3rd story, 1st apartment from south at west

    Mar 27, 2026 · Apt 3

    Open — Certification postponment denied
  • B

    Properly repair with similar material the broken or defective ceramic tiles at floor in the kitchen located at apt 3, 3rd story, 1st apartment from south at west

    Mar 27, 2026 · Apt 3

    Open — Certification postponment denied
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from north at west located at apt 3, 3rd story, 1st apartment from south at west

    Mar 27, 2026 · Apt 3

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... less than 1o sq ft at ceiling in the kitchen located at apt 3, 3rd story, 1st apartment from south at west

    Mar 27, 2026 · Apt 3

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak over ceiling in the 1st room from north at east located at apt 3, 3rd story, 1st apartment from south at west

    Mar 27, 2026 · Apt 3

    Open — Certification postponment denied
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Mar 27, 2026

    Open — Certification postponment denied
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3, 3rd story, 1st apartment from south at west

    Feb 20, 2026 · Apt 3

    Open — Certification postponment denied
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3, 3rd story, 1st apartment from south at west

    Feb 20, 2026 · Apt 3

    Open — Certification postponment denied
  • B

    Abate the infestation consisting of mice in the entire apartment located at apt 3, 3rd story, 1st apartment from south at west

    Feb 20, 2026 · Apt 3

    Open — Certification postponment denied
  • B

    Abate the infestation consisting of roaches in the entire apartment located at apt 3, 3rd story, 1st apartment from south at west

    Feb 20, 2026 · Apt 3

    Open — Certification postponment denied
  • B

    Properly repair with similar material the broken or defective ceremic floor tiles in the kitchen located at apt 3 upper level, 3rd story, 1st apartment from south at west

    Feb 20, 2026 · Apt 3

    Open — Certification postponment denied
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color north wall in the kitchen located at apt 3 upper level, 3rd story, 1st apartment from south at west

    Feb 20, 2026 · Apt 3

    Open — Certification postponment denied
  • B

    Properly repair with similar material the broken or defective wooden carbinet in the kitchen located at apt 3 upper level, 3rd story, 1st apartment from south at west

    Feb 20, 2026 · Apt 3

    Open — Certification postponment denied
  • B

    Remove all obstructions and repair all defects in bathtub in the bathroom located at apt 3 upper level, 3rd story, 1st apartment from south at west

    Feb 20, 2026 · Apt 3

    Open — Certification postponment denied
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from north located at apt 3 upper level, 3rd story, 1st apartment from south at west

    Feb 20, 2026 · Apt 3

    Open — Certification postponment denied
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 12, 2025

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 15, 2024

    Closed — Violation dismissed

DOB building violations · 0

No DOB violations on record

ECB violations · 0

No ECB violations on record

Complaints

  • Unsanitary condition

    Garbage/recycling storage

    Mar 31, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Mar 27, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Mar 26, 2026 · Apt 3

    Close
  • Paint/plaster

    Wall

    Mar 26, 2026 · Apt 3

    Close
  • Unsanitary condition

    Mold

    Mar 26, 2026 · Apt 3

    Close
  • Paint/plaster

    Ceiling

    Mar 26, 2026 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Mar 26, 2026 · Apt 3

    Close
  • Door/window

    Door

    Mar 26, 2026 · Apt 3

    Close
  • Plumbing

    Toilet

    Mar 26, 2026 · Apt 3

    Close
  • Plumbing

    Bathtub/shower

    Mar 26, 2026 · Apt 3

    Close
Show 30 more ↓
  • Door/window

    Door

    Mar 17, 2026 · Apt 3

    Close
  • Plumbing

    Radiator

    Mar 17, 2026 · Apt 3

    Close
  • Unsanitary condition

    Pests

    Mar 17, 2026 · Apt 3

    Close
  • Door/window

    Door

    Mar 17, 2026 · Apt 3

    Close
  • Paint/plaster

    Ceiling

    Mar 17, 2026 · Apt 3

    Close
  • Unsanitary condition

    Pests

    Mar 17, 2026 · Apt 3

    Close
  • Electric

    No lighting

    Mar 17, 2026 · Apt 3

    Close
  • Paint/plaster

    Ceiling

    Feb 19, 2026 · Apt 3

    Close
  • Unsanitary condition

    Pests

    Feb 14, 2026 · Apt 3

    Close
  • Paint/plaster

    Ceiling

    Feb 14, 2026 · Apt 3

    Close
  • Flooring/stairs

    Floor

    Feb 14, 2026 · Apt 3

    Close
  • Plumbing

    Bathtub/shower

    Feb 14, 2026 · Apt 3

    Close
  • Heat/hot water

    Apartment only

    Nov 13, 2025 · Apt 2

    Close
  • Electric

    Lighting

    Sep 8, 2004 · Apt 2

    Close
  • General

    Windows

    Sep 8, 2004 · Apt 2

    Close
  • Electric

    Wiring

    Sep 8, 2004 · Apt 2

    Close
  • Nonconst

    Vermin

    Sep 8, 2004 · Apt 2

    Close
  • Nonconst

    Rubbish

    Sep 8, 2004 · Apt 2

    Close
  • Electric

    Lighting

    Sep 8, 2004 · Apt 2

    Close
  • Plumbing

    Water supply

    Jan 12, 2004 · Apt BSMT

    Close
  • Heating

    Heat related

    Jan 12, 2004 · Apt BSMT

    Close
  • Plumbing

    Water-leaks

    Jan 12, 2004 · Apt BSMT

    Close
  • Heating

    Heat related

    Dec 23, 2003 · Apt BSMT

    Close
  • Heating

    Heat related

    Dec 9, 2003 · Apt BSMT

    Close
  • Heating

    Heat related

    Oct 24, 2003 · Apt 2

    Close
  • General

    Windows

    Oct 24, 2003 · Apt 2

    Close
  • Heating

    Heat related

    Oct 19, 2003 · Apt BLDG

    Close
  • Nonconst

    Vermin

    Apr 11, 2003 · Apt 1C

    Close
  • General

    Cabinet

    Apr 11, 2003 · Apt 1C

    Close
  • General

    Floor

    Apr 11, 2003 · Apt 1C

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C3)
Year built
1975
Floors
3
Residential units
4
Building area
4,608 ft²
Lot area
2,247 ft²
Zoning
R6B
Community board
409
Council district
29
Block / lot
9231 / 89
Assessed value
$301,050
Landmark / historic district
No

HPD registration #421273, last renewed Jun 13, 2025.

Questions about 83-21 Lefferts Boulevard

Who owns 83-21 Lefferts Boulevard?

The owner of record in NYC Department of City Planning PLUTO data is Holliswood Properties LLC.

Does 83-21 Lefferts Boulevard have violations?

Yes. NYC HPD has recorded 67 housing violations at this property.

Is 83-21 Lefferts Boulevard rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 83-21 Lefferts Boulevard built?

City records list 1975 as the year it was built.

How many apartments are in 83-21 Lefferts Boulevard?

It has 4 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.