86-48 109 Street
Queens, NY 11418BBL 4-09204-0028Map
Owner of record: NYC Department Of Education
86-48 109 Street is a school building built in 1925 in Queens, 11418. The owner of record is NYC Department Of Education. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 43
- ECB violations
- 50
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 43
- Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2010 inspection/test
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 18, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 15, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 9, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 25, 2007
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 2, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 7, 2006
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Oct 1, 2005
Dob violation - dismissed
Show 33 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Jun 8, 2005
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Nov 19, 2004
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 4, 2004
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 21, 2004
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 11, 2003
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 21, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Elevator elevatorrequired
4s80
Oct 24, 2000
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 17, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 6, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 13, 1997
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 13, 1997
Dob violation - active - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 8, 1996
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
May 31, 1994
Dob violation - dismissed - Elevator elevatoroptional
1
Apr 7, 1992
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 28, 1992
Vp*-violation unserved ecb- dismissed - Elevator elevatoroptional
1
Apr 25, 1991
Dob violation - dismissed - Elevator elevatoroptional
1
Jun 29, 1990
Dob violation - dismissed - Elevator elevatoroptional
1
Oct 12, 1989
Dob violation - dismissed - Elevator elevatorrequired
51)restore sw 80 plate form cab & etc missing in shaft way and file bn and obtain a permit for work done to same or replace all worm and braken equipment and file for same or properly dismantle and file for same or completely remove sw80 & file for same
Dec 9, 1988
Dob violation - resolved
ECB violations · 50
- Class - 2
Reissue#35691854r date of issue:03.21.2025 failure to maintain building in code-compliant manner.at the time of inspection observed and noted water leaking through lower roof in auditorium above stage large pud
Mar 3, 2026 · Penalty $3,125
Active - Class - 2
Reissue#35691852n date of issue:03.21.2025 exit door not self closing properly at 4th fl stairway d 2nd fl stairway c 1st floor.stairway c &stairway b each area one exit door.1st fl stair a stair c & d exit 2,6
Mar 3, 2026 · Penalty $1,562
Active - Class - 2
Reissue#35691851l date of issue:03.21.2025 failure to maintain building in code compliant manner.illumination for exits,exit discharges and public corridors per bc 1006.1;27-381.at the time of inspection observ
Mar 3, 2026 · Penalty $3,125
Active - Class - 2
Reissue#35678939j failure to maintain building in code-compliant manner.illumination for exits,exit discharges and public corridors.noted 50% of emergency lights not working in auditorium & cafeteria,4 in cella
Mar 21, 2025 · Penalty $1,250
Active - Class - 1
Failure to maintain building in code-compliant manner.noted(5)gas powered snow blowers stored inside the building by exit#6 storage of gas powered equipment not allowed inside the school.remove from building im
Mar 21, 2025 · Penalty $2,500
Resolve - Class - 2
Failure to maintain building in code-compliant manner.noted interior fpsc doors are racked/rubbing on frame 5 fl stair c, 1st fl stair a basement stair c & d.exit 2,6 & 11 interior smoke doors.rem:repair and/or
Mar 21, 2025 · Penalty $1,250
Active - Class - 2
Failure to maintain building in code compliant manner.noted water leaking through lower rent in auditorium above stage.large puddle on stage& floor.rem:repair and/or replace.
Mar 21, 2025 · Penalty $1,250
Active - Class - 2
Exit door not self-closing.exit#12 exterior door has defective closer device.not self-closing stays open.rem:repair/replace door.
Mar 21, 2025 · Penalty $625
Active - Class - 2
Exit door not self closing.noted:exterior exit#12 door with defective closer at interior 4th fl stairwell c(defective closure).at basement level stairwell d & c and exit#8 smoke doors are racked/rub on frame.me
Apr 9, 2024 · Penalty $625
Resolve - Class - 2
Failure to maintain building in code-compliant manner.noted at 5th fl corridor,ceiling adjacent to stairwell b has spalling/cracking plasterrem:repair and/or replace.
Apr 9, 2024 · Penalty $625
Resolve
Show 40 more ↓
- Class - 2
Failure to maintain building in code-compliant manner:illumination forexits,exit discharges and public corridors per bc 1006.1;27-381.noted approx.50% of emergency lights not operative when tested at auditorium
Apr 9, 2024 · Penalty $625
Active - Class - 2
Condensate line leaking by boiler,missing dog & bolt on front door of boiler,steam leak on steam line,valve b/4 anti syphon on oil suction line missing
Dec 29, 2021 · Penalty $625
Resolve - Class - 1
Re-issue #35584187z unsafe storage of combustible material and equipment.noted:observed at exit #1 gas operated snow blower being stored in hallway it's not allowed to be stored inside.remedy:maintain storage i
Sep 15, 2021 · Penalty $6,250
Resolve - Class - 1
Reissue#35548112x;note:unsafe storage of combustible material & equipment.observed at store near exit(1)srew blowera(gas operated)is not allowed to stare inside the building store in shed or other spread storag
Jul 15, 2021 · Penalty $6,250
Resolve - Class - 1
Reissue35548112x unsafe storage of combustible material&equipment.note:observed@stairc near exit stored 1snowblower (gas operated),which isnt allowed to store inside bldg cause of fire hazard.maintain storage i
May 24, 2021 · Penalty $6,250
Resolve - Class - 1
Unsafe storage of combustible material and equipment note observed multiple as operated snow blowers stored near stair c near eixt and should be stored in an outdoor shed or other special storage room and not i
Feb 16, 2021 · Penalty $2,500
Resolve - Class - 2
Failure to maintain building in code complian manner illumintaion for exits ,exit discharges and public corridors per bc 1006.1;27-381 note emergency eixt lights near exits 5,6,7 & 8 not working when tested rep
Feb 16, 2021 · Penalty $625
Resolve - Class - 2
Failure to maintain bldg in code-compliant manner-fail to provide wired vision panels as per 27-371(b).noted:missing required 1/4" class in vision panels @the following doors:104,105,106,310,312.rem:comply w. c
Apr 6, 2016
Resolve - Class - 2
Exit door not self closing.noted:staircase doors #1,2,3,4,5,7&8 leading to basement level are jammed ¬ properly closing.rem:repair or replace the doors.
Apr 6, 2016
Resolve - Class - 2
27-371(b).reissue 35023257p.plexi glass vision panels in place on classroom doors 303,308,312&408a.rem:replace w/ temp glass.
Mar 18, 2014
Resolve - Class - 2
27-371(b) reissue #34958125k. plexi-vision panels installed on doors to rooms 303,308,311 & 408. rem: provide required glass panels.
Jun 20, 2013
Resolve - Class - 2
Exit door not self-closing.note:doors racked @stair d, 1st fl exits 7/8, stair (l) & closer not working @stair 2. rem:repair or replace doors.
Jun 20, 2013
Resolve - Class - 2
27-371(b):plexi vission panels installed on doors 303,308,311, & 408d.rem:provide required glass panels.
Apr 30, 2012
Resolve - Class - 2
Auditorium flr hollow with slight sagging under video booth.rem repairflr
Feb 10, 2010
Resolve - Class - 3
In play yard outside cafeteria vertical masonry cracks, in corners by exit door - 2 - 121 inside corner cracks. under window 1st flr to grade to left of gas vent lines, 3' vertical crack corner of window
Jun 11, 2009
Resolve - Class - 2
Reissue: 34712332n. cracked masonry support column cellar outside oil tank room. remedy: repair column.
Jun 11, 2009
Resolve - Class - 3
Damaged plaster exterior wall rm 101 and roof bulkhead. remedy: repairwall.
Jun 11, 2009
Resolve - Class - 3
Reissue: 34712330j. brick retaining walls in window wells need pointing. remedy: maintain wall.
Jun 11, 2009
Resolve - Class - 3
Reissue: 34712174r. water penetration electric meter room and roof hatch bulkhead. remedy: waterproof wall.
Jun 11, 2009
Resolve - Class - 3
Reissue(34607640m) interior brick column with crack located at cellar front of oil tank room. remedy: repair crack.
Oct 8, 2008
Resolve - Class - 3
Reissue 34607639n plaster damage in electrical meter room,teachers bathroom on 4th flr,rm 404,403,401,101. remedy: repair walls/ceiling.
Oct 8, 2008
Resolve - Class - 3
Reissue 34607643x mortar joints missing under metal grating in school yard (view from cellar window near electrical panel room. remedy: repair brick wall.
Oct 8, 2008
Resolve - Class - 3
Reissue 34607640k water penetration through exterior brick into electrical meter room. remedy: seal penetration.
Oct 8, 2008
Resolve - Hazardous
Wall approximately 1 foot high is cracked located adjacent 86-64 109 st.remedy:repair/replace wall.
Sep 25, 2007
Resolve - Hazardous
Brick facade has become porous & allowing rain water into the bldg causing interior damages in rooms 212,303,401 & 404 & stairway "b" on th 4fl & electrical room on cellar.remedy:water-proof exterior facade.
Sep 25, 2007
Resolve - Hazardous
Interior brick column is cracked located on cellar level next to the oil tank room.remedy:repair cracked brick column
Sep 25, 2007
Resolve - Hazardous
Plaster is spalling on the walls located at rooms 212 on 2fl,rm 303 onthird & rm 401,404 on the 4fl & stairway "b" fourth floor & electricalroom on cellar.remedy:repair plaster on wall.
Sep 25, 2007
Resolve - Hazardous
Brick wall is missing mortar located adjacent to school yard under metal grill on cellar level.remedy:replace missing mortar joints in brick wall.
Sep 25, 2007
Resolve - Hazardous
Class room is a missing a door closer at room 406 on the 4fl.remedy:replace missing a door closer.
Sep 25, 2007
Resolve - Non-hazardous
Noted:roof bulkhead door use of illegal hardware-keyed on stair side.remedy:remove illegal hardware.
May 28, 2005
Resolve - Non-hazardous
Noted:exit doors not self closing.1)4th floor stair "a" right hand leaf,stair "c" right hand leaf,stair "d" left hand leaf.2)3rd floor stair "c" both doors;stair "a" left hand leaf.3)1st floorm stair "c" both
May 18, 2005
Resolve - Non-hazardous
Noted:1st floor exit corridor required width decreased by obstructions tables chairs,security desk & chair.remedy:remove obstructions,maintain corridor clear and unobstructed.
May 18, 2005
Resolve - Non-hazardous
Noted:cellar brick airways/window wells mortar joints severely eroded (beyond 1") throughout.remedy:repoint/replace masonry as required.
May 18, 2005
Resolve - Hazardous
Noted:east elevation,south end stone band below 5th floor 1)missing section (missing section setting on ledge).2)cracked & loose section below 1st window from south end.remedy:sound stone band,remove loose sect
May 18, 2005
Resolve - Non-hazardous
Failure to maintain exterior building wall. defect leaks to rooms: #404,304,305,307,204 through exterior walls. remedy: make all repairs.
Feb 24, 2003
Resolve - Non-hazardous
Failure to provide 3 inch high alphabetic letter of identification for stair over the occupancy side of the stairs door on floor 1 to 4 including basement.remedy:install sign as per local law 16/84.
Feb 28, 2001
Resolve - Non-hazardous
Failure to provide emergency lighting fixture within staircase and corridor on floor 1 to 3 including staircase on basement and attic.failure to provide emergency power for lighting fixture within stair and cor
Feb 28, 2001
Resolve - Hazardous
Failure to maintain building:defects are damaged seating in auditorium.damage chair pose a cut hazard.
Feb 14, 2001
Resolve - Non-hazardous
Failure to maintain building:defets are cracked and damaged masonary ceilings in rm 411,409a,410,30k1,207 crocked masonary walls inrm 404 stair 1/2 @4th fl,304,3k01,202,305,307,204.remedy:do all repairs immedia
Feb 14, 2001
Resolve - Hazardous
Failure to maintain building exterior. noted: 1) immediately erect sidewalk shed. 2) playground surface broken & uplifted. tripping hazard. 3) at upper face of facade at north & south corners of bldg
Apr 5, 1999
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- School building (W1)
- Year built
- 1925
- Floors
- 5
- Residential units
- —
- Building area
- 105,600 ft²
- Lot area
- 42,030 ft²
- Zoning
- R3X
- Community board
- 409
- Council district
- 29
- Block / lot
- 9204 / 28
- Assessed value
- $7,640,100
- Landmark / historic district
- No
Questions about 86-48 109 Street
Who owns 86-48 109 Street?
The owner of record in NYC Department of City Planning PLUTO data is NYC Department Of Education.
Does 86-48 109 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 86-48 109 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 86-48 109 Street built?
City records list 1925 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.