93-02 Liberty Avenue
Queens, NY 11417BBL 4-09162-0001Map
Owner of record: Denps INC.
93-02 Liberty Avenue is a mixed residential and retail building built in 1931 in Queens, 11417. It has 4 residential units across 3 floors. The owner of record is Denps INC.. HPD has recorded 139 housing violations here, most recently on May 7, 2026. 41 of the 50 most recent violations are still open.
- HPD violations
- 139
- DOB violations
- 48
- ECB violations
- 27
- HPD complaints
- 54
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 139
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 21, 2025
Open — Info nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Oct 13, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings
Oct 13, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Oct 13, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Oct 13, 2025
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Oct 13, 2025
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items consisting of shopping cart, shoe rack, flower pots stored on intermediate landing at public hall, 3rd story
Oct 13, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge on south wall bulkhead door to roof at public hall, 3rd story
Oct 13, 2025
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of consisting of trash can, storage cabinet at public hall, 1st story
Oct 13, 2025
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox at public hall, 1st story
Oct 13, 2025
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at bulkhead stairs , 3rd story
Oct 12, 2025
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective marble tread 2nd from bottom at 1st intermediate landing at public hall stairs, 1st story
Oct 12, 2025
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Oct 12, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story
Oct 12, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Oct 12, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Oct 12, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Oct 12, 2025
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Oct 12, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at north door at stair bulkhead , 3rd story
Oct 12, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective loose marble tread 2nd from bottom at bulkhead stairs , 3rd story
Oct 12, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective marble nosing at intermediate landing at public hall stairs, 2nd story
Oct 12, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective lock at building entrance door , 1st story
Oct 12, 2025
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the . at public hall, 1st story
Oct 12, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door and frame at south door at stair bulkhead , 3rd story
Oct 12, 2025
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Jan 1, 2025 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch assembly and hinges at building entrance door at public hall, 1st story
Jan 1, 2025
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls at public hall, 1st story
Jan 1, 2025
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective marble tread at landing at public hall stairs, 2nd story
Jan 1, 2025
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of cardboard boxes, household items, garbage bags, and etc... at public hall, 1st story
Jan 1, 2025
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story
Jan 1, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and all walls at public hall, 1st story
Jan 1, 2025
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch assembly at building entrance door at public hall, 1st story
Jan 1, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood frame at door in the entrance located at apt 2r, 2nd story, 1st apartment from east at south
Jan 1, 2025 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 2r, 2nd story, 1st apartment from east at south
Jan 1, 2025 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Jan 1, 2025 · Apt 2R
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Jan 1, 2025 · Apt 2R
Open — Notice of issuance sent to tenant - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Jan 1, 2025 · Apt 2R
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Jan 1, 2025 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door padlock at boiler room, 1st story
Jan 1, 2025
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 2, 2024
Open — Info nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2024
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 27, 2023
Open — Info nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of electrical conduit pipe and plastic cover of wall mounted street sign obstructing the operation of the dropladder at north fire escape
Jul 15, 2023
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes house hold items and flower pots at 3rd and 2nd stry balconys , south fire escape
Jul 15, 2023
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 29, 2023
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
Jan 4, 2023
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jan 4, 2023
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Jan 4, 2023
Open — Nov sent out
DOB building violations · 48
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Emergency none
Egncy-emergency none
Sep 12, 2012
Dob violation - dismissed - Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Sep 12, 2012
Dob violation - dismissed - Construction other optional
C-construction other optional
Jun 20, 2012
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 4, 2012
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 8, 2012
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 28, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed
Show 38 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 15, 2010
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 15, 2010
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 18, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Construction other optional
C-construction other optional
Apr 17, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - active
ECB violations · 27
- Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the dept of buildings for summons 35671459z, file a certificate of correction
Aug 13, 2026 · Penalty $1,250
Active - Class - 1
Work withput a permit. a.t.o.i. observed wooden compostible enclosure approximately 6 x 16 x 8 at exp. #1. attached to exp. 1 with concrete fasteners through 2 x 4. no permit or construction documents on file w
Nov 15, 2023 · Penalty $2,530
Active - Class - 2
Found 4 green mountain boilers with violating conditions. holes in walls and ceiling of boiler room. debris in boiler room. missing rain cap on chimney. exposed wiring in boiler room., maintain boiler; correct
Jun 19, 2019 · Penalty $625
Active - Class - 2
Work w/o a permit - facade. noted: removing masonry/stucco from 3rd floor & 2nd floor & replacing w/wire mesh & stucco. remedy: stop all work on facade. obtain permit. have ny state engineer evaluate lintels,
Oct 24, 2012 · Penalty $4,000
Resolve - Class - 2
Sec. 3307.6.2 sidewalk shed does not meet building code standards. noted: sidewalk shed erected at exposure #1 blocks the egress not allowing the exit door to fully open w/o hitting the upright. remedy: conform
Sep 25, 2012
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a c/c w/the dob for ecb violations #s. #34940783k,34961970p,34941829h,34928985n,34928984l,34933807r,34862327m,34862325z,34698800r,34639438n,34620292j.
Sep 10, 2012 · Penalty $4,000
Resolve - Class - 2
Failure to file c of c w/dob pursuant to 28-204.2 for violation 34940785k. remedy: file c of c.
Mar 19, 2012 · Penalty $4,000
Resolve - Class - 1
Failure to maintain,observed:along 93 st. side of bldg,decaminating of stucco on bldg wall along 3rd flr and parapet, with horizonial and vertical cracking of stucco & brickwork throughout.remedy:immediately pr
Jan 12, 2012 · Penalty $10,000
Resolve - Class - 1
Failure to maintain.noted:at 93 street for section of building observed cracks,loose brick thru-out exterior brick facade,also portion of s iding partially attached on to said wall & currently dangling onto sid
Nov 15, 2011 · Penalty $10,000
Resolve - Class - 1
Failure to comply w/ the comms order contained in nov#34928985n issued on 9/28/11 for failure to maintain exterior bld wall.rem:comply w/ the comms order.
Nov 15, 2011 · Penalty $24,000
Resolve
Show 17 more ↓
- Class - 1
Failure to comply w/ an order of the comm for the nov nos 34862327m 34639438n 34620292j & 34585671z the violating condition still exist i.e. cracks at parapet lvl & at different places of the 3story bldg not ye
Sep 28, 2011 · Penalty $12,000
Resolve - Class - 1
Failure to maintain bldg walls or appurtenances defects noted a section of siding app 1st on at exp4 along 93 street has been detached and hanging onto sidewalk creative a hazardous situation for pedestrians re
Sep 23, 2011 · Penalty $5,000
Resolve - Class - 1
Failure to maintain bldg in a code-compliant manner. noted loose, bulging bricks w/step cracks at parapet on north & west sides. also loose cracking & missingg stucco throughout walls on north & west sides.
May 20, 2010 · Penalty $25,000
Resolve - Class - 1
Failure to comply w/an order of the commissioner. respondent failed tocorrect conditions cited in the prior nov #34639438n for cracked and spalling stucco and brick work on side of bldg. remedy: comply w/code.
May 20, 2010 · Penalty $12,000
Resolve - Class - 2
Failure to maintain building wall an appurtenances. note: cracking & deliminating concrete/ /stucco and cracks in brick work on west facade throughout!! rem: provide sidewalk shed & maintain building wall.
Oct 4, 2008 · Penalty $2,500
Resolve - Hazardous
Failure to maintain. note: spalling and delaminating stucco coating and cracks in brickwork on n &n sides. remedy: provide shed. maintain building and make safe.
Apr 17, 2008 · Penalty $2,500
Resolve - Hazardous
Failure to maintain: note: 1. loose delaminating concrete coating at north parapet. 2. vertical & horizontal cracking of brickwall nw corner& thruout north & west parapet. remedy: provide shed & maintain bldg
Dec 18, 2007 · Penalty $10,000
Resolve - Hazardous
Failure to maintain exterior of bldg on roof(masonry) parapet surface stucco is peeling & loose, causing a hazardous condition. remedy: make area safe. remove & replace defective masonry
Aug 14, 2007 · Penalty $10,000
Resolve - Hazardous
Failure to maintain ext bldg wall loose delamination of concrete coating & 3fl parapet loose brickwork missing mortar & loose concrete coating are creating a hazardous cond.remedy:maintain exterior of bldg.
Apr 11, 2007 · Penalty $2,500
Resolve - Hazardous
Failure to maintain ext bldg.wall.note:1)fls#1-3 loose.delamination ofconcrete coating.2)fl 3-to roof parapet loose brickwork,missing mortar& loose concrete coating are creating a hazardous cond.remedy:maintain
Dec 22, 2006 · Penalty $10,000
Resolve - Hazardous
Failure to maintain exterior bldg. wall-haz all exterior bldg walls have numerous deep cracks affecting the structural stability of the parapet walls remedy:provide sidewalk shed maintain exterior bldg wall
Dec 5, 2006 · Penalty $10,000
Resolve - Hazardous
Failure to maintain exterior bldg wall hazardous noted:three full height & visible sides of bldg are in need of repair the existing white washed weather/water-proofing/coating is cracked & spalling the parapet
Aug 22, 2006 · Penalty $2,500
Resolve - Non-hazardous
49) no relief valve on tankless coil water line (laundry boiler).
Jul 13, 2001
Resolve - Non-hazardous
19b
Dec 13, 1997 · Penalty $400
Active - Non-hazardous
19b
Dec 13, 1997 · Penalty $400
Active - Non-hazardous
19b
Dec 13, 1997 · Penalty $400
Active - Non-hazardous
19b
Dec 13, 1997 · Penalty $400
Active
Complaints
- Unsanitary condition
Mold
Oct 9, 2025 · Apt 3R
Close - Plumbing
Toilet
Oct 9, 2025 · Apt 3R
Close - Paint/plaster
Ceiling
Oct 9, 2025 · Apt 3R
Close - Heat/hot water
Apartment only
Dec 30, 2024 · Apt 2R
Close - Heat/hot water
Entire building
Apr 3, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 2, 2023 · Apt 2
Close - Heat/hot water
Apartment only
Dec 30, 2022 · Apt 3R
Close - Heat/hot water
Apartment only
Dec 29, 2022 · Apt 3R
Close - Heat/hot water
Entire building
Dec 29, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 28, 2022 · Apt 3L3R2L
Close
Show 40 more ↓
- Heat/hot water
Entire building
Dec 24, 2022 · Apt 3L
Close - Heat/hot water
Entire building
Dec 5, 2021 · Apt BLDG
Close - Paint/plaster
Ceiling
Aug 8, 2020 · Apt 2R
Close - Door/window
Window frame
Aug 8, 2020 · Apt 2R
Close - Unsanitary condition
Pests
Aug 8, 2020 · Apt 2R
Close - Heat/hot water
Entire building
Dec 8, 2019 · Apt 3R
Close - Electric
No lighting
Jun 2, 2019 · Apt BLDG
Close - Door/window
Door
Jun 2, 2019 · Apt BLDG
Close - Water leak
Heavy flow
Jun 2, 2019 · Apt 3F
Close - Paint/plaster
Wall
Jun 2, 2019 · Apt 3F
Close - Paint/plaster
Ceiling
Jun 2, 2019 · Apt 3F
Close - Door/window
Window frame
Jun 2, 2019 · Apt 3F
Close - Heat/hot water
Apartment only
May 27, 2019 · Apt 3F
Close - Unsanitary condition
Garbage/recycling storage
Aug 15, 2018 · Apt BLDG
Close - General
Cooking gas
Oct 9, 2015 · Apt 3F
Close - Heat/hot water
Apartment only
Oct 9, 2015 · Apt 3F
Close - Heat/hot water
Apartment only
Oct 9, 2015 · Apt 3F
Close - General
Cooking gas
May 27, 2015 · Apt 2F
Close - Heat/hot water
Apartment only
May 27, 2015 · Apt 2F
Close - Nonconst
Carbon monoxide
Oct 10, 2013 · Apt 2F
Close - General
Cooking gas
Oct 10, 2013 · Apt 2F
Close - Heating
Heat related
Oct 10, 2013 · Apt 2F
Close - Nonconst
Carbon monoxide
Oct 4, 2013 · Apt 2F
Close - Appliance
Electric/gas range
Oct 4, 2013 · Apt 2F
Close - General
Mold
Jul 19, 2007 · Apt 2F
Close - General
Mold
Jul 19, 2007 · Apt 2F
Close - Paint/plaster
Ceiling
Jul 19, 2007 · Apt 2F
Close - Nonconst
Vermin
Jul 19, 2007 · Apt 2F
Close - Nonconst
Vermin
Jul 19, 2007 · Apt 2F
Close - Plumbing
Water-leaks
Jul 19, 2007 · Apt 2F
Close - Paint/plaster
Wall
Apr 7, 2004 · Apt BLDG
Close - Plumbing
Water-leaks
Apr 7, 2004 · Apt BLDG
Close - Plumbing
Water-leaks
Apr 7, 2004 · Apt BLDG
Close - Electric
Wiring
Apr 7, 2004 · Apt BLDG
Close - Electric
Bell-buzzer/intercom
Apr 7, 2004 · Apt BLDG
Close - Heating
Heat related
Jan 28, 2004 · Apt 2R
Close - Electric
Wiring
Jan 28, 2004 · Apt 2
Close - General
Cabinet
Jan 28, 2004 · Apt 2
Close - Plumbing
Basin/sink
Jan 28, 2004 · Apt 2
Close - Plumbing
Basin/sink
Jan 28, 2004 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S4)
- Year built
- 1931
- Floors
- 3
- Residential units
- 4
- Building area
- 5,880 ft²
- Lot area
- 2,237 ft²
- Zoning
- R6B
- Community board
- 410
- Council district
- 32
- Block / lot
- 9162 / 1
- Assessed value
- $463,950
- Landmark / historic district
- No
HPD registration #418574, last renewed Nov 22, 2003.
Questions about 93-02 Liberty Avenue
Who owns 93-02 Liberty Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Denps INC..
Does 93-02 Liberty Avenue have violations?
Yes. NYC HPD has recorded 139 housing violations at this property.
Is 93-02 Liberty Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 93-02 Liberty Avenue built?
City records list 1931 as the year it was built.
How many apartments are in 93-02 Liberty Avenue?
It has 4 residential units and 5 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.