roofy

77-16 101 Avenue

Queens, NY 11416BBL 4-09078-0072Map

Owner of record: Singh, Jasdeep

77-16 101 Avenue is a mixed residential and retail building built in 1931 in Queens, 11416. It has 5 residential units across 3 floors. The owner of record is Singh, Jasdeep. HPD has recorded 163 housing violations here, most recently on May 7, 2026. 36 of the 50 most recent violations are still open.

HPD violations
163
DOB violations
19
ECB violations
15
HPD complaints
141

What to know

Concern
6 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 7, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 163

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 7, 2026

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 12, 2025

    Open — Nov sent out
  • C

    Properly repair and abate unsafe electric wiring condition consisting of electrical wires at ceiling and main curcuit breaker panel at north wall in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south

    Apr 24, 2025 · Apt 2R

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective base cabinet at south wall in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south

    Apr 24, 2025 · Apt 2R

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south

    Apr 24, 2025 · Apt 2R

    Open — Nov sent out
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended acoustic panel at ceiling in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south

    Apr 24, 2025 · Apt 2R

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from east at south

    Apr 24, 2025 · Apt 2R

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective electric light fixture at ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from east at south

    Apr 24, 2025 · Apt 2R

    Open — Nov sent out
  • B

    Properly repair and abate unsafe electric wiring condition consisting of electrical wires at east wall in the 2nd room from north located at apt 2r, 2nd story, 1st apartment from east at south

    Apr 24, 2025 · Apt 2R

    Open — Nov sent out
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended acoustic panel at ceiling in the 2nd room from north located at apt 2r, 2nd story, 1st apartment from east at south

    Apr 24, 2025 · Apt 2R

    Open — Nov sent out
Show 40 more ↓
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended acoustic panel at ceiling in the 4th room from north located at apt 2r, 2nd story, 1st apartment from east at south

    Apr 24, 2025 · Apt 2R

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south

    Apr 24, 2025 · Apt 2R

    Open — Nov sent out
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south

    Apr 24, 2025 · Apt 2R

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south

    Apr 24, 2025 · Apt 2R

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at cellar at boiler room

    Apr 24, 2025

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of construction debris at cellar

    Apr 24, 2025

    Open — Nov sent out
  • C

    Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at cellar

    Apr 24, 2025

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at cellar

    Apr 24, 2025

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of household items at public hall, 3rd story

    Apr 24, 2025

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective latch at vestibule door at public hall, 1st story

    Apr 24, 2025

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective latch at vestibule door at public hall, 1st story

    Apr 24, 2025

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing on wall at public hall, 1st story

    Dec 22, 2024

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Dec 22, 2024

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Dec 22, 2024

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing on wall at public hall, 1st story

    Dec 22, 2024

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Dec 22, 2024

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges on building entrance at public hall, 1st story

    Dec 22, 2024

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective latch on vestibule at public hall, 1st story

    Dec 22, 2024

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective latch set on vestibule at public hall, 1st story

    Dec 22, 2024

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Dec 22, 2024

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Dec 2, 2024

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Aug 27, 2024

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Aug 27, 2024

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Aug 27, 2024

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Aug 27, 2024

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Aug 27, 2024

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story

    Aug 27, 2024

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story

    Aug 27, 2024

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of household items at stairs to bulkhead at public hall, 3rd story

    Aug 27, 2024

    Open — Nov sent out
  • B

    Cleanse and disinfect to the satisfaction of this department after removing the offensive odor and garbage bags at all stories at public hall

    Aug 27, 2024

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story

    Jul 29, 2024

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Jul 29, 2024

    Closed — Violation dismissed
  • B

    Abate the infestation consisting of vermin flies at public hall, 1st story

    Jul 29, 2024

    Closed — Violation dismissed
  • B

    Cleanse and disinfect to the satisfaction of this department after removing the offensive odor at public hall, 1st story

    Jul 29, 2024

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Jul 29, 2024

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Jul 29, 2024

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Jul 29, 2024

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Jul 29, 2024

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Jul 29, 2024

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing on wall at public hall, 1st story

    Jul 18, 2024

    Closed — Violation dismissed

DOB building violations · 19

  • Construction other optional

    Structural stability requested for interior structural at entire cellar ceiling, joists deteriorated from water penetration with material potential collapse.

    Dec 1, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
Show 9 more ↓
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 8, 2012

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Oct 29, 2000

    Vw*-violation - work w/o permit dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 7, 1994

    Dob violation - dismissed

ECB violations · 15

  • Class - 2

    Failure to comply with the commissioner's order to file a certificate of correction with the dept of buildings for summons 39168749y, file a certificate of correction

    Jul 16, 2026 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply with the commissioner's order to file a certificate of correction with the dept of buildings for summons 39168750l, file a certificate of correction

    Jul 16, 2026 · Penalty $1,250

    Active
  • Class - 1

    Failure to provide unobstructed exit passageway. at time of inspection at exposure 3(back) at fire escape drop down ladder miscellaneous debris throughout rear yard and passageway at expo 4, also interior 3rd f

    Dec 1, 2025 · Penalty $1,280

    Resolve
  • Class - 1

    Failure to maintain building in code-compliant manner. at time of inspection exposure 1(front) and exposure 4(right) vertical, horizontal cracks, expo 4 deteriorated stucco at exit door, at interior cellar drop

    Dec 1, 2025 · Penalty $12,500

    Active
  • Class - 2

    Failure to file required annual boiler inspection reports for low-pressure boiler 40000114677n0001 in accordance with the rules of the department.1rcny 103-01(d)(1)requires that an annual inspection report for

    Sep 27, 2024 · Penalty $625

    Active
  • Class - 2

    Work without a permit.noted:at cellar level erected full height partition wall for bathroom installed water and waste line for toilet shower and residential sink also installed electrical wiring for lights swit

    Dec 3, 2019 · Penalty $6,250

    Active
  • Class - 2

    Residence converted maintained or occupied a dwelling for more than the legally approved number of families authorized by the c of o or official department records dob records indicated 5 family.residence has b

    Dec 3, 2019 · Penalty $10,000

    Active
  • Class - 2

    Occupancy contrary to that allowed by the certificate of occupancy or building department records cellar usage changed from ordinary storage to an apartment with kictehn and bathroom facilties installed

    Oct 31, 2019

    Resolve
  • Class - 1

    Failure to provide unobstructed exit passageway. noted: 3 sty, 5 family bldg has 2nd exit for apts: (1r,2r,3r) passing the cellar to the street. passage is obstructed by the padlocked door in the cellar. remedy

    May 18, 2012 · Penalty $1,200

    Resolve
  • Hazardous

    B4b/bq9/27-793/36/50/50a/50b/50c/50d/50e/50f/50g/.haz b4b#50-nolicensed master plumber on record w/dob for new heating boiler & water heaterinstalled oil to gas conversion.bq9-new gas burnham steam heating boil

    Dec 18, 2007 · Penalty $1,550

    Active
Show 5 more ↓
  • Hazardous

    B4b,5t,36,4b,12b,16,25b,c,32a,35,39,48b.**fdny shutdown 12/5/07-calledout on 12/6/07 10pm:found boiler to be in a unsafe condition ordered to start procedure for permits & replace not fix or repair boiler compl

    Dec 10, 2007 · Penalty $2,000

    Resolve
  • Hazardous

    Cease use.b4b,51,36,4b,12b,16,25b,c,32a,35,39,48b.**fdny shut down 12/5/07 people still w/o heat of 12/6/07 10pm(called out) *haz* b4b #50 boiler & burner must be replaced immediately.do not fix & restore this

    Dec 6, 2007 · Penalty $800

    Resolve
  • Hazardous

    Occupancy contrary to c of o#37832 converting a cellar used for storage to a bedroom and 3pc bath. water and gas lines are installed in kitchen area. remedy: discontinue illegal occupancy forthwith.

    Oct 29, 2000 · Penalty $800

    Resolve
  • Hazardous

    Work without permit.illegal work noted at cellar level a 3pc bath has been installed. gas and water lines are also installed in ktchn area. remedy:obtain permits for illegal work or restore to prior legal condi

    Oct 29, 2000 · Penalty $800

    Resolve
  • Hazardous

    Occupancy is contrary to that allowed by the c of o or bldg. dept. records.cellar use changed from storage and ordinary use to an apt. partitions erected with kitchen and bathroom facilties installed.

    Aug 24, 2000

    Resolve

Complaints

  • Water leak

    Heavy flow

    Sep 10, 2025 · Apt 2R

    Close
  • Electric

    No lighting

    Sep 10, 2025 · Apt 2R

    Close
  • Water leak

    Slow leak

    Mar 14, 2025 · Apt 2R

    Close
  • Electric

    Wiring

    Mar 5, 2025 · Apt 2R

    Close
  • Plumbing

    Basin/sink

    Mar 5, 2025 · Apt 2R

    Close
  • Unsanitary condition

    Mold

    Mar 5, 2025 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    Nov 14, 2024 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    Nov 14, 2024 · Apt 2F

    Close
  • Heat/hot water

    Entire building

    Nov 14, 2024 · Apt BLDG

    Close
  • Electric

    Wiring

    Nov 14, 2024 · Apt 2R

    Close
Show 40 more ↓
  • Paint/plaster

    Ceiling

    Nov 14, 2024 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    Nov 14, 2024 · Apt 2R

    Close
  • Electric

    Power outage

    Nov 14, 2024 · Apt 2R

    Close
  • Paint/plaster

    Ceiling

    Nov 14, 2024 · Apt 2F

    Close
  • Unsanitary condition

    Mold

    Nov 14, 2024 · Apt 2F

    Close
  • Water leak

    Heavy flow

    Nov 14, 2024 · Apt 2F

    Close
  • Electric

    Power outage

    Nov 12, 2024 · Apt 2R

    Close
  • Paint/plaster

    Ceiling

    Aug 26, 2024 · Apt 3R

    Close
  • Unsanitary condition

    Mold

    Aug 26, 2024 · Apt 3R

    Close
  • Electric

    Power outage

    Aug 26, 2024 · Apt 3R

    Close
  • Unsanitary condition

    Pests

    Aug 26, 2024 · Apt 3R

    Close
  • Unsanitary condition

    Pests

    Jul 26, 2024 · Apt 2R

    Close
  • Paint/plaster

    Ceiling

    Jul 26, 2024 · Apt 2R

    Close
  • Electric

    Wiring

    Jul 26, 2024 · Apt 2R

    Close
  • Electric

    Outlet/switch

    Jul 12, 2024 · Apt 3R

    Close
  • Electric

    No lighting

    Jul 12, 2024 · Apt 3R

    Close
  • Unsanitary condition

    Pests

    Jul 12, 2024 · Apt 3R

    Close
  • Plumbing

    Toilet

    Jul 12, 2024 · Apt 3R

    Close
  • Unsanitary condition

    Pests

    Jul 12, 2024 · Apt 3R

    Close
  • Electric

    Outlet/switch

    Jul 12, 2024 · Apt 3R

    Close
  • Electric

    No lighting

    Jul 12, 2024 · Apt 3R

    Close
  • Electric

    Power outage

    May 16, 2024 · Apt 2R

    Close
  • Paint/plaster

    Wall

    May 16, 2024 · Apt 2R

    Close
  • Paint/plaster

    Ceiling

    May 16, 2024 · Apt 2R

    Close
  • Unsanitary condition

    Garbage/recycling storage

    May 16, 2024 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    May 14, 2024 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    May 2, 2024 · Apt 2R

    Close
  • Water leak

    Heavy flow

    May 2, 2024 · Apt 2R

    Close
  • Unsanitary condition

    Garbage/recycling storage

    May 2, 2024 · Apt 2R

    Close
  • Electric

    Power outage

    May 2, 2024 · Apt 2R

    Close
  • Electric

    No lighting

    Apr 29, 2024 · Apt 2R

    Close
  • Electric

    Lighting

    Apr 29, 2024 · Apt 2R

    Close
  • Electric

    Wiring

    Apr 29, 2024 · Apt 2R

    Close
  • Paint/plaster

    Ceiling

    Apr 29, 2024 · Apt 2R

    Close
  • Paint/plaster

    Ceiling

    Apr 29, 2024 · Apt 2R

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Apr 24, 2024 · Apt BLDG

    Close
  • Paint/plaster

    Ceiling

    Apr 24, 2024 · Apt 2R

    Close
  • Electric

    Wiring

    Apr 24, 2024 · Apt 2R

    Close
  • Unsanitary condition

    Mold

    Apr 24, 2024 · Apt 2R

    Close
  • Water leak

    Heavy flow

    Apr 24, 2024 · Apt 2R

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Mixed residential and retail building (S5)
Year built
1931
Floors
3
Residential units
5
Building area
5,400 ft²
Lot area
1,910 ft²
Zoning
R6B
Community board
409
Council district
32
Block / lot
9078 / 72
Assessed value
$558,900
Landmark / historic district
No

HPD registration #404061, last renewed Aug 8, 2025.

Questions about 77-16 101 Avenue

Who owns 77-16 101 Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Singh, Jasdeep.

Does 77-16 101 Avenue have violations?

Yes. NYC HPD has recorded 163 housing violations at this property.

Is 77-16 101 Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 77-16 101 Avenue built?

City records list 1931 as the year it was built.

How many apartments are in 77-16 101 Avenue?

It has 5 residential units and 6 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.