77-16 101 Avenue
Queens, NY 11416BBL 4-09078-0072Map
Owner of record: Singh, Jasdeep
77-16 101 Avenue is a mixed residential and retail building built in 1931 in Queens, 11416. It has 5 residential units across 3 floors. The owner of record is Singh, Jasdeep. HPD has recorded 163 housing violations here, most recently on May 7, 2026. 36 of the 50 most recent violations are still open.
- HPD violations
- 163
- DOB violations
- 19
- ECB violations
- 15
- HPD complaints
- 141
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 163
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Open — Nov sent out - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of electrical wires at ceiling and main curcuit breaker panel at north wall in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south
Apr 24, 2025 · Apt 2R
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective base cabinet at south wall in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south
Apr 24, 2025 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south
Apr 24, 2025 · Apt 2R
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended acoustic panel at ceiling in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south
Apr 24, 2025 · Apt 2R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from east at south
Apr 24, 2025 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electric light fixture at ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from east at south
Apr 24, 2025 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of electrical wires at east wall in the 2nd room from north located at apt 2r, 2nd story, 1st apartment from east at south
Apr 24, 2025 · Apt 2R
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended acoustic panel at ceiling in the 2nd room from north located at apt 2r, 2nd story, 1st apartment from east at south
Apr 24, 2025 · Apt 2R
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended acoustic panel at ceiling in the 4th room from north located at apt 2r, 2nd story, 1st apartment from east at south
Apr 24, 2025 · Apt 2R
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Apr 24, 2025 · Apt 2R
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Apr 24, 2025 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Apr 24, 2025 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Apr 24, 2025
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of construction debris at cellar
Apr 24, 2025
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at cellar
Apr 24, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at cellar
Apr 24, 2025
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at public hall, 3rd story
Apr 24, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at vestibule door at public hall, 1st story
Apr 24, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch at vestibule door at public hall, 1st story
Apr 24, 2025
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing on wall at public hall, 1st story
Dec 22, 2024
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Dec 22, 2024
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Dec 22, 2024
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing on wall at public hall, 1st story
Dec 22, 2024
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Dec 22, 2024
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges on building entrance at public hall, 1st story
Dec 22, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch on vestibule at public hall, 1st story
Dec 22, 2024
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch set on vestibule at public hall, 1st story
Dec 22, 2024
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Dec 22, 2024
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 2, 2024
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Aug 27, 2024
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 27, 2024
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Aug 27, 2024
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Aug 27, 2024
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 27, 2024
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
Aug 27, 2024
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story
Aug 27, 2024
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at stairs to bulkhead at public hall, 3rd story
Aug 27, 2024
Open — Nov sent out - BHazardous
Cleanse and disinfect to the satisfaction of this department after removing the offensive odor and garbage bags at all stories at public hall
Aug 27, 2024
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story
Jul 29, 2024
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jul 29, 2024
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of vermin flies at public hall, 1st story
Jul 29, 2024
Closed — Violation dismissed - BHazardous
Cleanse and disinfect to the satisfaction of this department after removing the offensive odor at public hall, 1st story
Jul 29, 2024
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jul 29, 2024
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jul 29, 2024
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jul 29, 2024
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Jul 29, 2024
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jul 29, 2024
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing on wall at public hall, 1st story
Jul 18, 2024
Closed — Violation dismissed
DOB building violations · 19
- Construction other optional
Structural stability requested for interior structural at entire cellar ceiling, joists deteriorated from water penetration with material potential collapse.
Dec 1, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active
Show 9 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 8, 2012
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 29, 2000
Vw*-violation - work w/o permit dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - dismissed
ECB violations · 15
- Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the dept of buildings for summons 39168749y, file a certificate of correction
Jul 16, 2026 · Penalty $1,250
Resolve - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the dept of buildings for summons 39168750l, file a certificate of correction
Jul 16, 2026 · Penalty $1,250
Active - Class - 1
Failure to provide unobstructed exit passageway. at time of inspection at exposure 3(back) at fire escape drop down ladder miscellaneous debris throughout rear yard and passageway at expo 4, also interior 3rd f
Dec 1, 2025 · Penalty $1,280
Resolve - Class - 1
Failure to maintain building in code-compliant manner. at time of inspection exposure 1(front) and exposure 4(right) vertical, horizontal cracks, expo 4 deteriorated stucco at exit door, at interior cellar drop
Dec 1, 2025 · Penalty $12,500
Active - Class - 2
Failure to file required annual boiler inspection reports for low-pressure boiler 40000114677n0001 in accordance with the rules of the department.1rcny 103-01(d)(1)requires that an annual inspection report for
Sep 27, 2024 · Penalty $625
Active - Class - 2
Work without a permit.noted:at cellar level erected full height partition wall for bathroom installed water and waste line for toilet shower and residential sink also installed electrical wiring for lights swit
Dec 3, 2019 · Penalty $6,250
Active - Class - 2
Residence converted maintained or occupied a dwelling for more than the legally approved number of families authorized by the c of o or official department records dob records indicated 5 family.residence has b
Dec 3, 2019 · Penalty $10,000
Active - Class - 2
Occupancy contrary to that allowed by the certificate of occupancy or building department records cellar usage changed from ordinary storage to an apartment with kictehn and bathroom facilties installed
Oct 31, 2019
Resolve - Class - 1
Failure to provide unobstructed exit passageway. noted: 3 sty, 5 family bldg has 2nd exit for apts: (1r,2r,3r) passing the cellar to the street. passage is obstructed by the padlocked door in the cellar. remedy
May 18, 2012 · Penalty $1,200
Resolve - Hazardous
B4b/bq9/27-793/36/50/50a/50b/50c/50d/50e/50f/50g/.haz b4b#50-nolicensed master plumber on record w/dob for new heating boiler & water heaterinstalled oil to gas conversion.bq9-new gas burnham steam heating boil
Dec 18, 2007 · Penalty $1,550
Active
Show 5 more ↓
- Hazardous
B4b,5t,36,4b,12b,16,25b,c,32a,35,39,48b.**fdny shutdown 12/5/07-calledout on 12/6/07 10pm:found boiler to be in a unsafe condition ordered to start procedure for permits & replace not fix or repair boiler compl
Dec 10, 2007 · Penalty $2,000
Resolve - Hazardous
Cease use.b4b,51,36,4b,12b,16,25b,c,32a,35,39,48b.**fdny shut down 12/5/07 people still w/o heat of 12/6/07 10pm(called out) *haz* b4b #50 boiler & burner must be replaced immediately.do not fix & restore this
Dec 6, 2007 · Penalty $800
Resolve - Hazardous
Occupancy contrary to c of o#37832 converting a cellar used for storage to a bedroom and 3pc bath. water and gas lines are installed in kitchen area. remedy: discontinue illegal occupancy forthwith.
Oct 29, 2000 · Penalty $800
Resolve - Hazardous
Work without permit.illegal work noted at cellar level a 3pc bath has been installed. gas and water lines are also installed in ktchn area. remedy:obtain permits for illegal work or restore to prior legal condi
Oct 29, 2000 · Penalty $800
Resolve - Hazardous
Occupancy is contrary to that allowed by the c of o or bldg. dept. records.cellar use changed from storage and ordinary use to an apt. partitions erected with kitchen and bathroom facilties installed.
Aug 24, 2000
Resolve
Complaints
- Water leak
Heavy flow
Sep 10, 2025 · Apt 2R
Close - Electric
No lighting
Sep 10, 2025 · Apt 2R
Close - Water leak
Slow leak
Mar 14, 2025 · Apt 2R
Close - Electric
Wiring
Mar 5, 2025 · Apt 2R
Close - Plumbing
Basin/sink
Mar 5, 2025 · Apt 2R
Close - Unsanitary condition
Mold
Mar 5, 2025 · Apt 2R
Close - Unsanitary condition
Pests
Nov 14, 2024 · Apt 2R
Close - Unsanitary condition
Pests
Nov 14, 2024 · Apt 2F
Close - Heat/hot water
Entire building
Nov 14, 2024 · Apt BLDG
Close - Electric
Wiring
Nov 14, 2024 · Apt 2R
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Nov 14, 2024 · Apt 2R
Close - Unsanitary condition
Pests
Nov 14, 2024 · Apt 2R
Close - Electric
Power outage
Nov 14, 2024 · Apt 2R
Close - Paint/plaster
Ceiling
Nov 14, 2024 · Apt 2F
Close - Unsanitary condition
Mold
Nov 14, 2024 · Apt 2F
Close - Water leak
Heavy flow
Nov 14, 2024 · Apt 2F
Close - Electric
Power outage
Nov 12, 2024 · Apt 2R
Close - Paint/plaster
Ceiling
Aug 26, 2024 · Apt 3R
Close - Unsanitary condition
Mold
Aug 26, 2024 · Apt 3R
Close - Electric
Power outage
Aug 26, 2024 · Apt 3R
Close - Unsanitary condition
Pests
Aug 26, 2024 · Apt 3R
Close - Unsanitary condition
Pests
Jul 26, 2024 · Apt 2R
Close - Paint/plaster
Ceiling
Jul 26, 2024 · Apt 2R
Close - Electric
Wiring
Jul 26, 2024 · Apt 2R
Close - Electric
Outlet/switch
Jul 12, 2024 · Apt 3R
Close - Electric
No lighting
Jul 12, 2024 · Apt 3R
Close - Unsanitary condition
Pests
Jul 12, 2024 · Apt 3R
Close - Plumbing
Toilet
Jul 12, 2024 · Apt 3R
Close - Unsanitary condition
Pests
Jul 12, 2024 · Apt 3R
Close - Electric
Outlet/switch
Jul 12, 2024 · Apt 3R
Close - Electric
No lighting
Jul 12, 2024 · Apt 3R
Close - Electric
Power outage
May 16, 2024 · Apt 2R
Close - Paint/plaster
Wall
May 16, 2024 · Apt 2R
Close - Paint/plaster
Ceiling
May 16, 2024 · Apt 2R
Close - Unsanitary condition
Garbage/recycling storage
May 16, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
May 14, 2024 · Apt BLDG
Close - Unsanitary condition
Mold
May 2, 2024 · Apt 2R
Close - Water leak
Heavy flow
May 2, 2024 · Apt 2R
Close - Unsanitary condition
Garbage/recycling storage
May 2, 2024 · Apt 2R
Close - Electric
Power outage
May 2, 2024 · Apt 2R
Close - Electric
No lighting
Apr 29, 2024 · Apt 2R
Close - Electric
Lighting
Apr 29, 2024 · Apt 2R
Close - Electric
Wiring
Apr 29, 2024 · Apt 2R
Close - Paint/plaster
Ceiling
Apr 29, 2024 · Apt 2R
Close - Paint/plaster
Ceiling
Apr 29, 2024 · Apt 2R
Close - Unsanitary condition
Garbage/recycling storage
Apr 24, 2024 · Apt BLDG
Close - Paint/plaster
Ceiling
Apr 24, 2024 · Apt 2R
Close - Electric
Wiring
Apr 24, 2024 · Apt 2R
Close - Unsanitary condition
Mold
Apr 24, 2024 · Apt 2R
Close - Water leak
Heavy flow
Apr 24, 2024 · Apt 2R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S5)
- Year built
- 1931
- Floors
- 3
- Residential units
- 5
- Building area
- 5,400 ft²
- Lot area
- 1,910 ft²
- Zoning
- R6B
- Community board
- 409
- Council district
- 32
- Block / lot
- 9078 / 72
- Assessed value
- $558,900
- Landmark / historic district
- No
HPD registration #404061, last renewed Aug 8, 2025.
Questions about 77-16 101 Avenue
Who owns 77-16 101 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Singh, Jasdeep.
Does 77-16 101 Avenue have violations?
Yes. NYC HPD has recorded 163 housing violations at this property.
Is 77-16 101 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 77-16 101 Avenue built?
City records list 1931 as the year it was built.
How many apartments are in 77-16 101 Avenue?
It has 5 residential units and 6 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.