80-02 95 Avenue
Queens, NY 11416BBL 4-09008-0001Map
Owner of record: Aktar, Jahanara
80-02 95 Avenue is a walk-up apartment building built in 1910 in Queens, 11416. It has 3 residential units across 2 floors. The owner of record is Aktar, Jahanara. HPD has recorded 70 housing violations here, most recently on May 7, 2026. 49 of the 50 most recent violations are still open.
- HPD violations
- 70
- DOB violations
- 0
- ECB violations
- 1
- HPD complaints
- 57
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 70
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Open — Nov sent out - BHazardous
Provide adequate lighting for light fixtures at ceiling at public hall, 1st story
May 6, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 4th room from north located at apt 1floor, 1st apartment from east at south
May 6, 2026 · Apt 1FLOOR
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 1floor, 1st apartment from east at south
May 6, 2026 · Apt 1FLOOR
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1floor, 1st apartment from east at south
May 6, 2026 · Apt 1FLOOR
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
May 6, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
May 6, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
May 6, 2026
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
May 6, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
May 6, 2026
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
May 6, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story
May 6, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at vestibule door at public hall, 1st story
May 6, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at building entrance door at public hall, 1st story
May 6, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story
May 6, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at in the entrance located at apt 1floor, 1st apartment from east at south
May 6, 2026 · Apt 1FLOOR
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1floor, 1st apartment from east at south
May 6, 2026 · Apt 1FLOOR
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the kitchen located at apt 1, 1st apartment from south at west
Mar 28, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water temperature above 130 degrees fahrenheit in the entire apartment located at apt 1, 1st apartment from south at west
Mar 28, 2026 · Apt 1
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Mar 28, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall
Mar 28, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Mar 28, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall
Mar 28, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Mar 28, 2026
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall
Mar 28, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling, south and west wall in the kitchen located at apt 1, 1st apartment from south at west
Mar 28, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 3rd room from north located at apt 1, 1st apartment from south at west
Mar 28, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1, 1st apartment from south at west
Mar 28, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1, 1st apartment from south at west
Mar 28, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox
Jan 20, 2026
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at wall
Jan 20, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Jan 20, 2026
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at wall
Jan 20, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch set at vestibule door leading to public hall , 1st story
Jan 20, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
Jan 20, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings
Jan 20, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jan 20, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set and hinges at vestibule door leading to public hall , 1st story
Jan 20, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building front entrance door , 1st story
Jan 20, 2026
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1stfl , 1st story, 1st apartment from east at south
Jan 6, 2026 · Apt 1STFL
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at 1st story public hall at boiler room, 1st story
Jan 6, 2026
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 21, 2025
Open — Info nov sent out - CImmediately hazardous
Provide ready access to buildings heating system doo locked at cellar at boiler room
Nov 19, 2025
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at bsmt-apt 1fl, 1st bsmt-apt from east at south
Nov 19, 2025 · Apt 1FL
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at bsmt-apt 1fl, 1st bsmt-apt from east at south
Nov 19, 2025 · Apt 1FL
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration wall erected from floor to ceiling created 2 rooms in the 3rd room from north located at bsmt-apt 1fl, 1st bsmt-apt from east at south
Nov 19, 2025 · Apt 1FL
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak ceiling in the 3rd room from north located at bsmt-apt 1fl, 1st bsmt-apt from east at south
Nov 19, 2025 · Apt 1FL
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak ceiling in the kitchen located at bsmt-apt 1fl, 1st bsmt-apt from east at south
Nov 19, 2025 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at bsmt-apt 1fl, 1st bsmt-apt from east at south
Nov 19, 2025 · Apt 1FL
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 1
- Hazardous
Residence alt for occupancy as a dwelling for more than the legally approved # of families.dept of bldg records mdr#404261 indicates residence to be legally approved for a 3 family. residence is now alt for
Oct 6, 2006 · Penalty $1,800
Resolve
Complaints
- Water leak
Heavy flow
May 16, 2026 · Apt 1STFLO
Close - Water leak
Heavy flow
May 6, 2026 · Apt 1FL
Close - Plumbing
Bathtub/shower
May 6, 2026 · Apt 1FL
Close - Electric
No lighting
May 2, 2026 · Apt 1FLOOR
Close - Unsanitary condition
Mold
May 2, 2026 · Apt 1FLOOR
Close - Heat/hot water
Apartment only
Mar 27, 2026 · Apt 1STFLO
Close - Heat/hot water
Entire building
Jan 18, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 7, 2026 · Apt 1STFLO
Close - Heat/hot water
Entire building
Jan 2, 2026 · Apt 1STFLO
Close - Heat/hot water
Apartment only
Dec 10, 2025 · Apt 1STFL
Close
Show 40 more ↓
- Heat/hot water
Entire building
Nov 27, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 17, 2025 · Apt 1FL
Open - Door/window
Window frame
Dec 24, 2024 · Apt 1STFLO
Close - Heat/hot water
Apartment only
Dec 24, 2024 · Apt 1STFLO
Close - Heat/hot water
Entire building
Dec 6, 2024 · Apt FIRSTF
Close - Safety
Fire escape
Dec 6, 2024 · Apt FIRSTF
Close - Heat/hot water
Entire building
Nov 20, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 11, 2020 · Apt 2FL
Close - Plumbing
Radiator
Dec 17, 2019 · Apt 2FL
Close - Plumbing
Water supply
Dec 17, 2019 · Apt 2FL
Close - Heat/hot water
Entire building
Dec 17, 2019 · Apt 2FL
Close - Water leak
Damp spot
Feb 22, 2018 · Apt 3FL
Close - Unsanitary condition
Mold
Feb 22, 2018 · Apt 3FL
Close - Water leak
Heavy flow
Feb 22, 2018 · Apt 3FL
Close - Heat/hot water
Apartment only
Feb 22, 2018 · Apt 3FL
Close - Heat/hot water
Apartment only
Dec 18, 2017 · Apt 3RDFL
Close - Nonconst
Vermin
Jul 19, 2013 · Apt 3
Close - Nonconst
Vermin
Jul 19, 2013 · Apt 3
Close - General
Mold
Jul 19, 2013 · Apt 3
Close - General
Mold
Jul 19, 2013 · Apt 3
Close - General
Mold
Jul 19, 2013 · Apt 3
Close - Plumbing
Water-leaks
Jul 19, 2013 · Apt 3
Close - General
Doors
Jul 19, 2013 · Apt 3
Close - Heating
Heat related
Feb 17, 2013 · Apt 3
Close - Heating
Heat related
Jan 8, 2010 · Apt 1
Close - Heating
Heat related
Jan 1, 2009 · Apt 1ST
Close - Heating
Heat related
Oct 23, 2008 · Apt 3
Close - Plumbing
Water-leaks
Jul 18, 2007 · Apt 3
Close - General
Windows
Jul 18, 2007 · Apt 3
Close - Electric
Wiring
Jul 18, 2007 · Apt 3
Close - Electric
Lighting
Jul 18, 2007 · Apt 3
Close - Plumbing
Water-leaks
Jul 18, 2007 · Apt 3
Close - General
Doors
Jul 12, 2007 · Apt 3
Close - Electric
Electric-supply
Jul 12, 2007 · Apt 3
Close - Electric
Wiring
Jul 12, 2007 · Apt 3
Close - General
Cabinet
Jul 12, 2007 · Apt 3
Close - General
Windows
Jul 12, 2007 · Apt 3
Close - General
Windows
Jul 12, 2007 · Apt 3
Close - General
Floor
Jul 12, 2007 · Apt 3
Close - Paint/plaster
Ceiling
Jul 12, 2007 · Apt 3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1910
- Floors
- 2
- Residential units
- 3
- Building area
- 2,720 ft²
- Lot area
- 2,000 ft²
- Zoning
- R5B
- Community board
- 409
- Council district
- 32
- Block / lot
- 9008 / 1
- Assessed value
- $55,500
- Landmark / historic district
- No
HPD registration #404261, last renewed Sep 14, 2023.
Questions about 80-02 95 Avenue
Who owns 80-02 95 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Aktar, Jahanara.
Does 80-02 95 Avenue have violations?
Yes. NYC HPD has recorded 70 housing violations at this property.
Is 80-02 95 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 80-02 95 Avenue built?
City records list 1910 as the year it was built.
How many apartments are in 80-02 95 Avenue?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.