90-23 75 Street
Queens, NY 11421BBL 4-08949-0054Map
Owner of record: Baksh, Mohamed H
90-23 75 Street is a two-family home built in 1920 in Queens, 11421. It has 2 residential units across 2 floors. The owner of record is Baksh, Mohamed H. HPD has recorded 105 housing violations here, most recently on December 8, 2012. 47 of the 50 most recent violations are still open.
- HPD violations
- 105
- DOB violations
- 0
- ECB violations
- 3
- HPD complaints
- 182
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 105
- CImmediately hazardous
Abate the nuisance consisting of scalding hot water at temperature 140 * f at bathroom and kitchen in the entire apartment located at apt 1, 1st story
Dec 8, 2012 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective connection waste line at wash basin in the bathroom located at apt 1, 1st story
Dec 8, 2012 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tile at walls in the bathroom located at apt 1, 1st story
Dec 8, 2012 · Apt 1
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1, 1st story
Dec 8, 2012 · Apt 1
Open — Nov sent out - CImmediately hazardous
Replace with new the broken or defective window glass lower sash in the 1st room from east located at apt 1, 1st story
Dec 8, 2012 · Apt 1
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1, 1st story
Dec 8, 2012 · Apt 1
Open — Nov sent out - CImmediately hazardous
Section 27-2028, 2032 admin.code: provide an adequate supply of heat from an approved central heating system or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 1, 1st story
Dec 8, 2012 · Apt 1
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective shut off valve at radiator in the 5th room from east located at apt 1, 1st story
Dec 8, 2012 · Apt 1
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures .. in the entire apartment located at apt 1flr, 1st story
Nov 5, 2012 · Apt 1FLR
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story
Sep 15, 2012 · Apt 1
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Trace and repair the source and abate the nuisance consisting of mold ... at walls throughout at cellar
Aug 25, 2012
Open — First no access to re- inspect violation - BHazardous
Properly repair the broken or defective floor in the 2nd bedroom from east at south located at apt 1flr, 1st story
Aug 25, 2012 · Apt 1FLR
Open — Nov sent out - BHazardous
Abate the nuisance consisting of bedbugs in the entire apartment located at apt 1flr, 1st story
Aug 25, 2012 · Apt 1FLR
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1flr, 1st story
Aug 25, 2012 · Apt 1FLR
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles west wall in the bathroom located at apt 1flr, 1st story
Aug 25, 2012 · Apt 1FLR
Open — Nov sent out - BHazardous
Replace the broken or defective missing wasteline & trap at wash basin in the bathroom located at apt 1flr, 1st story
Aug 25, 2012 · Apt 1FLR
Open — Nov sent out - BHazardous
Properly repair the broken or defective wash basin cabinet in the bathroom located at apt 1flr, 1st story
Aug 25, 2012 · Apt 1FLR
Open — Nov sent out - BHazardous
Abate the nuisance consisting of bedbugs in the entire apartment located at apt 1, 1st story
Jun 29, 2012 · Apt 1
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1, 1st story
Jun 29, 2012 · Apt 1
Open — Nov sent out - BHazardous
Replace with new the broken or defective base cabinet at washbasin in the bathroom located at apt 1, 1st story
Jun 29, 2012 · Apt 1
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl ! in the bathroom located at apt 1, 1st story
Jun 29, 2012 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the broken or defective ceiling light fixture at northeast room in the entire apartment located at apt 1, 1st story
Jun 29, 2012 · Apt 1
Open — Nov sent out - BHazardous
Replace with new the missing glass at lower sash window in northeast room in the entire apartment located at apt 1, 1st story
Jun 29, 2012 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color east wall at northeast room in the entire apartment located at apt 1, 1st story
Jun 29, 2012 · Apt 1
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in waste line of sink in kitchen in the entire apartment located at apt 1, 1st story
Jun 29, 2012 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor at 3rd from north room in the entire apartment located at apt 1, 1st story
Jun 29, 2012 · Apt 1
Open — Nov sent out - BHazardous
Replace with new the missing waste line & trap at washbasin in the bathroom located at apt 1, 1st story
Jun 29, 2012 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor at 2nd from north room in the entire apartment located at apt 1, 1st story
Jun 29, 2012 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles around bathtub in the bathroom located at apt 1, 1st story
Jun 29, 2012 · Apt 1
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 1, 1st story
Jun 29, 2012 · Apt 1
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the nuisance consisting of mold ... mildew at walls. appox. 300 sq.ft. at cellar
Jun 27, 2012
Open — First no access to re- inspect violation - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1, 1st story
Jun 27, 2012 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures .. in the entire apartment located at apt 1, 1st story
Jun 27, 2012 · Apt 1
Closed — Violation dismissed - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 1, 1st story
Jun 27, 2012 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tile at walls in the bathroom located at apt 1, 1st story
Jun 27, 2012 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from east located at apt 1, 1st story
Jun 27, 2012 · Apt 1
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2fl, 2nd story
May 15, 2012 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at north wall in bathtub in the bathroom located at apt 1, 1st story
May 5, 2012 · Apt 1
Open — Nov sent out - BHazardous
Replace the broken or defective waste line at washbasin in the bathroom located at apt 1, 1st story
May 5, 2012 · Apt 1
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 1, 1st story
May 5, 2012 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles floor in the bathroom located at apt 1, 1st story
May 5, 2012 · Apt 1
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1, 1st story
May 5, 2012 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story
May 5, 2012 · Apt 1
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures at gas stove in the kitchen located at apt 1, 1st story
May 5, 2012 · Apt 1
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2fl, 2nd story
Apr 17, 2012 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective door jamb in the entrance located at apt 2fl, 2nd story
Feb 21, 2012 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair the broken or defective door lock in the entrance located at apt 2fl, 2nd story
Feb 8, 2012 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair the broken or defective door jamb in the entrance located at apt 2fl, 2nd story
Feb 8, 2012 · Apt 2FL
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 1, 1st story
Feb 8, 2012 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color east wall in the 1st room from east at south located at apt 1, 1st story
Feb 8, 2012 · Apt 1
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 3
- Class - 2
Work without permit.work noted:at cellar level.installed water & wastelines for 3pc bathroom(sink,toilet,shower),residential sink and washing machine.erected full partitions with doors for bathroom and(2)sleepi
May 23, 2016 · Penalty $4,000
Active - Class - 2
Residence altered as dwelling for more than legally authorized by the c of o or official records.dept.of buildings records indicate premiseslegally approved for a(2)family dwelling.now premises altered & occupi
May 23, 2016 · Penalty $6,000
Active - Class - 2
Work w/o a permit. work noted:at cellar level erected full height partitions for bathroom installed water and waste line for(tub,toilet,sink)work in progress approx.40% complete. full swo issued pursant to 28-2
Apr 5, 2014
Resolve
Complaints
- Electric
Power outage
Jun 14, 2020 · Apt 1FL
Close - Heating
Heat related
Dec 6, 2012 · Apt 1
Close - Heating
Heat related
Nov 29, 2012 · Apt 1
Close - Electric
Electric-supply
Oct 24, 2012 · Apt 1FLR
Close - Electric
Electric-supply
Oct 23, 2012 · Apt 1FLR
Close - Electric
Electric-supply
Oct 23, 2012 · Apt 1FLR
Close - Heating
Heat related
Oct 9, 2012 · Apt 1
Close - General
Cooking gas
Oct 2, 2012 · Apt 1FLR
Close - Plumbing
Water supply
Oct 2, 2012 · Apt 1FLR
Close - Paint/plaster
Wall
Oct 2, 2012 · Apt 1FLR
Close
Show 40 more ↓
- Nonconst
Rubbish
Oct 2, 2012 · Apt 1FLR
Close - Heating
Heat related
Sep 10, 2012 · Apt 1STF
Close - Heating
Heat related
Sep 5, 2012 · Apt 1
Close - Plumbing
Sewer
Aug 26, 2012 · Apt 1FL
Close - Plumbing
Sewer
Aug 26, 2012 · Apt 1FL
Close - Heating
Heat related
Aug 21, 2012 · Apt 1FLR
Close - Plumbing
Sewer
Aug 21, 2012 · Apt 1FLR
Close - Plumbing
Sewer
Aug 21, 2012 · Apt 1FLR
Close - Plumbing
Sewer
Aug 21, 2012 · Apt 1FLR
Close - Nonconst
Vermin
Jun 27, 2012 · Apt 1
Close - General
Mold
Jun 27, 2012 · Apt 1
Close - General
Ceramic-tile
Jun 27, 2012 · Apt 1
Close - General
Ceramic-tile
Jun 27, 2012 · Apt 1
Close - General
Floor
Jun 27, 2012 · Apt 1
Close - General
Floor
Jun 27, 2012 · Apt 1
Close - Plumbing
Basin/sink
Jun 27, 2012 · Apt 1
Close - Plumbing
Sewer
Jun 27, 2012 · Apt 1
Close - Plumbing
Sewer
Jun 27, 2012 · Apt 1
Close - Plumbing
Sewer
Jun 27, 2012 · Apt 1
Close - Electric
Wiring
Jun 27, 2012 · Apt 1
Close - Plumbing
Water supply
Jun 27, 2012 · Apt 1
Close - Plumbing
Basin/sink
Jun 25, 2012 · Apt 1
Close - General
Ceramic-tile
Jun 23, 2012 · Apt 1
Close - General
Floor
Jun 23, 2012 · Apt 1
Close - Plumbing
Toilet
Jun 23, 2012 · Apt 1
Close - Plumbing
Basin/sink
Jun 23, 2012 · Apt 1
Close - Paint/plaster
Wall
Jun 23, 2012 · Apt 1
Close - Heating
Heat related
Jun 23, 2012 · Apt 1
Close - General
Floor
Jun 23, 2012 · Apt 1
Close - Plumbing
Basin/sink
Jun 23, 2012 · Apt 1
Close - Nonconst
Vermin
Jun 19, 2012 · Apt 1
Close - Nonconst
Vermin
Jun 19, 2012 · Apt 1
Close - Paint/plaster
Wall
Jun 19, 2012 · Apt 1
Close - Plumbing
Toilet
Jun 19, 2012 · Apt 1
Close - Plumbing
Sewer
Jun 19, 2012 · Apt 1
Close - General
Cooking gas
Jun 19, 2012 · Apt 1
Close - Heating
Heat related
Jun 19, 2012 · Apt 1
Close - Plumbing
Basin/sink
Jun 19, 2012 · Apt 1
Close - Heating
Heat related
Jun 11, 2012 · Apt 1
Close - Heating
Heat related
May 30, 2012 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B2)
- Year built
- 1920
- Floors
- 2
- Residential units
- 2
- Building area
- 1,943 ft²
- Lot area
- 2,300 ft²
- Zoning
- R3-1
- Community board
- 409
- Council district
- 32
- Block / lot
- 8949 / 54
- Assessed value
- $57,600
- Landmark / historic district
- No
Questions about 90-23 75 Street
Who owns 90-23 75 Street?
The owner of record in NYC Department of City Planning PLUTO data is Baksh, Mohamed H.
Does 90-23 75 Street have violations?
Yes. NYC HPD has recorded 105 housing violations at this property.
Is 90-23 75 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 90-23 75 Street built?
City records list 1920 as the year it was built.
How many apartments are in 90-23 75 Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.