roofy

74-03 Rockaway Boulevard

Queens, NY 11421BBL 4-08944-0048Map

Owner of record: Khodzhayev, Suleyman

74-03 Rockaway Boulevard is a walk-up apartment building built in 1931 in Queens, 11421. It has 3 residential units across 2 floors. The owner of record is Khodzhayev, Suleyman. HPD has recorded 63 housing violations here, most recently on May 7, 2026. 34 of the 50 most recent violations are still open.

HPD violations
63
DOB violations
24
ECB violations
2
HPD complaints
45

What to know

Concern
9 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 7, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 63

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 7, 2026

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 21, 2025

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 12, 2025

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2f, 2nd story, 1st apartment from west at north

    Dec 13, 2023 · Apt 2F

    Open — Notice of issuance sent to tenant
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2f, 2nd story, 1st apartment from west at north

    Dec 13, 2023 · Apt 2F

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective lower window sash counterbalance at west 1 window in the 1st room from north located at apt 2f, 2nd story, 1st apartment from west at north

    Dec 13, 2023 · Apt 2F

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling in the bathroom located at apt 1fl, 1st story, 2nd apartment from north at east

    Dec 13, 2023 · Apt 1FL

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective ceramic wall tiles at south wall in the bathroom located at apt 1fl, 1st story, 2nd apartment from north at east

    Dec 13, 2023 · Apt 1FL

    Open — Nov sent out
  • A

    Repair the leaky and/or defective faucets at shower stall in the bathroom located at apt 1fl, 1st story, 2nd apartment from north at east

    Dec 13, 2023 · Apt 1FL

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1fl, 1st story, 2nd apartment from north at east

    Dec 13, 2023 · Apt 1FL

    Closed — Violation closed
Show 40 more ↓
  • C

    Properly repair with similar material the broken or defective upper window sash glass pane at west 1 window in the 2nd room from north located at apt 2f, 2nd story, 1st apartment from west at north

    Dec 13, 2023 · Apt 2F

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets in the bath tub in the bathroom located at apt 1, 1st story, 2nd apartment from north at east

    Oct 20, 2023 · Apt 1

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 2nd apartment from north at east

    Oct 20, 2023 · Apt 1

    Open — Notice of issuance sent to tenant
  • B

    Provide a safe and adequate supply of electric service to the fixtures outlets at the west and north walls in the kitchen located at apt 1, 1st story, 2nd apartment from north at east

    Oct 20, 2023 · Apt 1

    Open — Nov sent out
  • B

    Provide a safe and adequate supply of electric service to the fixtures outlets at the south and north walls in the 1st room from east located at apt 1, 1st story, 2nd apartment from north at east

    Oct 20, 2023 · Apt 1

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 1, 1st story, 2nd apartment from north at east

    Oct 20, 2023 · Apt 1

    Open — Nov sent out
  • B

    Remove the illegal fastening consisting of hasp with eye capable of being pad locked at scuttle cover to roof at public hall, 2nd story

    Oct 10, 2023

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective self closing hinges in the entrance located at apt 2f, 2nd story, 1st apartment from east at south

    Sep 27, 2023 · Apt 2F

    Open — Nov sent out
  • C

    Properly repair the source and abate the evidence of a water leak at the ceiling in the 2nd room from east located at apt 1unit, 1st story, 1st apartment from north at east

    Sep 16, 2023 · Apt 1UNIT

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 1unit, 1st story, 1st apartment from north at east

    Sep 16, 2023 · Apt 1UNIT

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1unit, 1st story, 1st apartment from north at east

    Sep 16, 2023 · Apt 1UNIT

    Open — Notice of issuance sent to tenant
  • B

    Properly secure the loose mailbox at the entrance to the building

    Sep 16, 2023

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective security gate binding with the frame at the entrance to the building

    Sep 16, 2023

    Open — Nov sent out
  • B

    Repair or replace the smoke detector inoperable in the entire apartment located at apt 1unit, 1st story, 1st apartment from north at east

    Sep 16, 2023 · Apt 1UNIT

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1unit, 1st story, 1st apartment from north at east

    Sep 16, 2023 · Apt 1UNIT

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). inoperable in the entire apartment located at apt 1unit, 1st story, 1st apartment from north at east

    Sep 16, 2023 · Apt 1UNIT

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in waste line at the wash basin in the bathroom located at apt 1unit, 1st story, 1st apartment from north at east

    Sep 16, 2023 · Apt 1UNIT

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective sliding doors when in motion gets off track at the bathtub in the bathroom located at apt 1unit, 1st story, 1st apartment from north at east

    Sep 16, 2023 · Apt 1UNIT

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east located at apt 1unit, 1st story, 1st apartment from north at east

    Sep 16, 2023 · Apt 1UNIT

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 1unit, 1st story, 1st apartment from north at east

    Sep 16, 2023 · Apt 1UNIT

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling in the kitchen located at apt 1unit, 1st story, 1st apartment from north at east

    Sep 16, 2023 · Apt 1UNIT

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective wooden base cabinet at sink in the kitchen located at apt 1unit, 1st story, 1st apartment from north at east

    Sep 16, 2023 · Apt 1UNIT

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1unit, 1st story, 1st apartment from north at east

    Sep 16, 2023 · Apt 1UNIT

    Open — Notice of issuance sent to tenant
  • C

    Provide a safe and adequate supply of electric service to the fixtures at outlets at all walls in the entire apartment located at apt 1, 1st story, 1st apartment from north at east

    Apr 30, 2023 · Apt 1

    Open — Not complied with
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 1, 1st story, 1st apartment from north at east

    Apr 30, 2023 · Apt 1

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1, 1st story, 1st apartment from north at east

    Apr 30, 2023 · Apt 1

    Closed — Violation closed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 1, 1st story, 1st apartment from north at east

    Apr 30, 2023 · Apt 1

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 1, 1st story, 1st apartment from north at east

    Apr 30, 2023 · Apt 1

    Closed — Violation closed
  • C

    Remove the illegal double cylinder key operated locking device at door . in the entrance located at apt 1, 1st story, 1st apartment from north at east

    Apr 30, 2023 · Apt 1

    Closed — Violation closed
  • C

    Remove the illegal fastening double cylinder key operated lock installed at building entrance storm metal door at public hall, 1st story

    Apr 12, 2023

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Apr 12, 2023

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Apr 12, 2023

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Apr 12, 2023

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Apr 12, 2023

    Open — Not complied with
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Apr 12, 2023

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective building entrance door at public hall, 1st story

    Apr 12, 2023

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak over ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from south at west

    Apr 12, 2023 · Apt 2F

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from south at west

    Apr 12, 2023 · Apt 2F

    Open — Not complied with
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Apr 12, 2023

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 2f, 2nd story, 1st apartment from south at west

    Apr 12, 2023 · Apt 2F

    Open — Not complied with

DOB building violations · 24

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - active
Show 14 more ↓
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boiler boiler optional

    B-boiler boiler optional

    Feb 1, 1993

    Dob violation - dismissed
  • Construction other optional

    J. demofetto

    Oct 12, 1988

    Dob violation - active

ECB violations · 2

  • Class - 2

    B265 as per class 2 (b265) 28-303.7 failure to file a complete boiler inspection report as per dob records.

    Aug 31, 2016 · Penalty $2,500

    Active
  • Non-hazardous

    Occupancy contrary to that allowed by the cert. of occupancy and dept. records, at cellar changed from storage to operation of sewing machines. remedy: discontinue illegal use.

    Nov 22, 1988

    Resolve

Complaints

  • Unsanitary condition

    Garbage/recycling storage

    Jun 8, 2024 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Apr 27, 2024 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Feb 27, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 16, 2023 · Apt 2F

    Close
  • Paint/plaster

    Wall

    Dec 12, 2023 · Apt 1STFLO

    Close
  • Plumbing

    Bathtub/shower

    Dec 12, 2023 · Apt 1STFLO

    Close
  • Heat/hot water

    Apartment only

    Dec 12, 2023 · Apt 1STFLO

    Close
  • Unsanitary condition

    Pests

    Dec 11, 2023 · Apt FIRSTF

    Close
  • Unsanitary condition

    Pests

    Dec 11, 2023 · Apt FIRSTF

    Close
  • Appliance

    Electric/gas range

    Nov 30, 2023 · Apt UNIT1

    Close
Show 35 more ↓
  • Unsanitary condition

    Pests

    Nov 30, 2023 · Apt UNIT1

    Close
  • Safety

    Carbon monoxide detector

    Nov 30, 2023 · Apt UNIT1

    Close
  • Safety

    Smoke detector

    Nov 30, 2023 · Apt UNIT1

    Close
  • Door/window

    Window frame

    Nov 10, 2023 · Apt 2F

    Close
  • Heat/hot water

    Entire building

    Nov 10, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Nov 5, 2023 · Apt 1

    Close
  • Unsanitary condition

    Mold

    Sep 30, 2023 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Sep 30, 2023 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Sep 30, 2023 · Apt 1

    Close
  • General

    Bell/buzzer/intercom

    Sep 30, 2023 · Apt 1

    Close
  • Plumbing

    Bathtub/shower

    Sep 30, 2023 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Sep 30, 2023 · Apt 1

    Close
  • Appliance

    Electric/gas range

    Sep 30, 2023 · Apt 1

    Close
  • Appliance

    Electric/gas range

    Sep 13, 2023 · Apt 1UNIT

    Close
  • Plumbing

    Bathtub/shower

    Sep 13, 2023 · Apt 1UNIT

    Close
  • Paint/plaster

    Wall

    Sep 13, 2023 · Apt 1UNIT

    Close
  • Unsanitary condition

    Mold

    Sep 13, 2023 · Apt 1UNIT

    Close
  • Water leak

    Slow leak

    Sep 13, 2023 · Apt 1UNIT

    Close
  • Plumbing

    Toilet

    Jul 28, 2023 · Apt 2F

    Close
  • Water leak

    Slow leak

    Jul 10, 2023 · Apt 2

    Close
  • Electric

    Outlet/switch

    Jul 10, 2023 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Jul 10, 2023 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Apr 27, 2023 · Apt 1

    Close
  • Water leak

    Damp spot

    Apr 27, 2023 · Apt 1

    Close
  • Unsanitary condition

    Mold

    Apr 27, 2023 · Apt 1

    Close
  • Electric

    Outlet/switch

    Apr 27, 2023 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Feb 22, 2023 · Apt 2F

    Close
  • Unsanitary condition

    Pests

    Jan 19, 2023 · Apt 2F

    Close
  • Door/window

    Window frame

    Jan 19, 2023 · Apt 2F

    Close
  • Paint/plaster

    Wall

    Jan 19, 2023 · Apt 2F

    Close
  • Paint/plaster

    Ceiling

    Jan 19, 2023 · Apt 2F

    Close
  • Unsanitary condition

    Pests

    Jan 19, 2023 · Apt 2F

    Close
  • Electric

    No lighting

    Jun 17, 2022 · Apt L7403

    Close
  • General

    Cooking gas

    Jun 17, 2022 · Apt L7403

    Close
  • Electric

    Power outage

    May 24, 2022 · Apt BMIDDL

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C0)
Year built
1931
Floors
2
Residential units
3
Building area
2,200 ft²
Lot area
1,114 ft²
Zoning
R3-1
Community board
409
Council district
32
Block / lot
8944 / 48
Assessed value
$63,420
Landmark / historic district
No

HPD registration #425330, last renewed Feb 25, 2026.

Questions about 74-03 Rockaway Boulevard

Who owns 74-03 Rockaway Boulevard?

The owner of record in NYC Department of City Planning PLUTO data is Khodzhayev, Suleyman.

Does 74-03 Rockaway Boulevard have violations?

Yes. NYC HPD has recorded 63 housing violations at this property.

Is 74-03 Rockaway Boulevard rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 74-03 Rockaway Boulevard built?

City records list 1931 as the year it was built.

How many apartments are in 74-03 Rockaway Boulevard?

It has 3 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.