roofy

80-39 249 Street

Queens, NY 11426BBL 4-08562-0052Map

Owner of record: Aminyar, Friba

80-39 249 Street is an one-family home built in 1940 in Queens, 11426. It has 1 residential unit across 2 floors. The owner of record is Aminyar, Friba. HPD has recorded 60 housing violations here, most recently on September 18, 2026. 47 of the 50 most recent violations are still open.

HPD violations
60
DOB violations
0
ECB violations
2
HPD complaints
50

What to know

Concern
7 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 18, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 60

  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt pvt, 1st story, 1st apartment from north at east

    Sep 18, 2026 · Apt PVT

    Open — Nov sent out
  • B

    Abate the infestation consisting of mice in the entire apartment located at apt pvt, 1st story, 1st apartment from north at east

    Sep 18, 2026 · Apt PVT

    Open — Nov sent out
  • B

    Abate the nuisance consisting of pests. evidence of water bugs in the entire apartment located at apt 1fl, 1st story, 1st apartment from north at east

    Sep 18, 2026 · Apt 1FL

    Open — Nov sent out
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt 1fl upper level, 1st story, 1st apartment from north at east

    Sep 18, 2026 · Apt 1FL

    Open — Nov sent out
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt 1fl lower level, 1st story, 1st apartment from north at east

    Sep 18, 2026 · Apt 1FL

    Open — Nov sent out
  • B

    Properly secure the loose handrail at north wall at 1st story to 2nd story stairs in the private hallway located at apt 1fl, 1st story, 1st apartment from north at east

    Sep 18, 2026 · Apt 1FL

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall, east wall, west wall in the 22nd room from east at north located at apt 1fl, 1st story, 1st apartment from north at east

    Sep 18, 2026 · Apt 1FL

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, west wall in the 2nd room from east located at apt 1fl, 1st story, 1st apartment from north at east

    Sep 18, 2026 · Apt 1FL

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 1st room from east at south located at apt 1fl, 1st story, 1st apartment from north at east

    Sep 18, 2026 · Apt 1FL

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the kitchen located at apt 1fl, 1st story, 1st apartment from north at east

    Sep 18, 2026 · Apt 1FL

    Open — Nov sent out
Show 40 more ↓
  • B

    Properly repair the source and abate the evidence of a water leak over ceiling in the 2nd room from east at south located at apt pvt lower level, 1st story, 1st apartment from north at east

    Sep 18, 2026 · Apt PVT

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective light fixture at the ceiling in the 11th room from east at south located at apt ph upper level, 1st story, 1st apartment from north at east

    Sep 3, 2026 · Apt PH

    Open — Nov sent out
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet , in the 2nd bathroom from east located at apt ph upper level, 1st story, 1st apartment from north at east

    Sep 3, 2026 · Apt PH

    Open — Nov sent out
  • A

    Refit the door in the entrance located at apt ph lower level, 1st story, 1st apartment from north at east

    Sep 3, 2026 · Apt PH

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling in the 1st room from east at south located at apt ph, 1st story, 1st apartment from north at east

    Sep 3, 2026 · Apt PH

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling in the kitchen located at apt ph, 1st story, 1st apartment from north at east

    Sep 3, 2026 · Apt PH

    Open — Nov sent out
  • C

    Properly repair the source and abate the evidence of a water leak at the ceiling in the 2nd room from east at south located at apt ph, 1st story, 1st apartment from north at east

    Sep 3, 2026 · Apt PH

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling in the foyer located at apt ph, 1st story, 1st apartment from north at east

    Sep 3, 2026 · Apt PH

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at the west wall in the 12th room upper level from east at north located at apt ph upper level, 1st story, 1st apartment from north at east

    Sep 3, 2026 · Apt PH

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak over the ceiling ceiling in the 12th room upper level from east at south located at apt ph upper level, 1st story, 1st apartment from north at east

    Sep 3, 2026 · Apt PH

    Open — Nov sent out
  • B

    Abate the infestation consisting of mice in the entire apartment located at apt ph, 1st story, 1st apartment from north at east

    Sep 3, 2026 · Apt PH

    Open — Nov sent out
  • C

    Remove all obstructions from water closet ,, in the 1st bathroom from east located at apt ph lower level, 1st story, 1st apartment from north at east

    Sep 3, 2026 · Apt PH

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective entrance door in the 11th room from east at south located at apt ph upper level, 1st story, 1st apartment from north at east

    Sep 3, 2026 · Apt PH

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective 2nd closet door from south at west in the 11th room from east at south located at apt ph upper level, 1st story, 1st apartment from north at east

    Sep 3, 2026 · Apt PH

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective entrance door in the 12th room from east at north located at apt ph upper level, 1st story, 1st apartment from north at east

    Sep 3, 2026 · Apt PH

    Open — Nov sent out
  • C

    Repair the broken or defective plastered surfaces and paint in uniform color approximate 10sq feet at the ceiling in the 2nd room from east at south located at apt ph, 1st story, 1st apartment from north at east

    Sep 3, 2026 · Apt PH

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt ph, 1st story, 1st apartment from north at east

    Sep 3, 2026 · Apt PH

    Open — Nov sent out
  • B

    Abate the infestation consisting of roaches in the entire apartment located at apt ph, 1st story, 1st apartment from north at east

    Sep 3, 2026 · Apt PH

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in wash basin and bathtub in the 2nd bathroom from east located at apt ph upper level, 1st story, 1st apartment from north at east

    Sep 3, 2026 · Apt PH

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in washbasin waste line in the 2nd bathroom from east located at apt privat, 1st story, 1st apartment from north at east

    Aug 15, 2026 · Apt PRIVAT

    Open — Nov sent out
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the 2nd bathroom from east located at apt privat, 1st story, 1st apartment from north at east

    Aug 15, 2026 · Apt PRIVAT

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen lower level located at apt privat, 1st story, 1st apartment from north at east

    Aug 15, 2026 · Apt PRIVAT

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at north wall in the kitchen lower level located at apt privat, 1st story, 1st apartment from north at east

    Aug 15, 2026 · Apt PRIVAT

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 11th room lower level from east at south located at apt privat, 1st story, 1st apartment from north at east

    Aug 15, 2026 · Apt PRIVAT

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the in the 11th room from east at south located at apt privat, 1st story, 1st apartment from north at east

    Aug 15, 2026 · Apt PRIVAT

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 12th room lower level from east located at apt privat, 1st story, 1st apartment from north at east

    Aug 15, 2026 · Apt PRIVAT

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak over ceiling in the 22nd room upper level from east at north located at apt privat, 1st story, 1st apartment from north at east

    Aug 15, 2026 · Apt PRIVAT

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at north wall in the 22nd room upper level from east at north located at apt privat, 1st story, 1st apartment from north at east

    Aug 15, 2026 · Apt PRIVAT

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at east wall in the 22nd room upper level from east at north located at apt privat, 1st story, 1st apartment from north at east

    Aug 15, 2026 · Apt PRIVAT

    Open — Nov sent out
  • B

    Abate the infestation consisting of mice in the entire apartment located at apt firstf, 1st story, 1st apartment from north at east

    Aug 15, 2026 · Apt FIRSTF

    Open — Nov sent out
  • B

    Abate the infestation consisting of roaches in the entire apartment located at apt firstf, 1st story, 1st apartment from north at east

    Aug 15, 2026 · Apt FIRSTF

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective washed out bricks mortar at joints at all steps at building front at stoop

    Aug 15, 2026

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 22nd room from east at north, the 11th room from east at south, the 12th room from east, the kitchen located at apt privat, 1st story, 1st apartment from north at east

    Aug 15, 2026 · Apt PRIVAT

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the in the 12th room from east located at apt privat, 1st story, 1st apartment from north at east

    Aug 15, 2026 · Apt PRIVAT

    Open — Nov sent out
  • C

    Provide an adequate supply of gas to the fixtures range in the kitchen located at apt privat, 1st story, 1st apartment from north at east

    Aug 15, 2026 · Apt PRIVAT

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 1st room from east at south located at apt pvt, 1st story, 1st apartment from north at east

    Jul 20, 2026 · Apt PVT

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 2nd room from east at south located at apt pvt, 1st story, 1st apartment from north at east

    Jul 20, 2026 · Apt PVT

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling in the 1st room from east at south located at apt pvt, 1st story, 1st apartment from north at east

    Jul 20, 2026 · Apt PVT

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling in the 2nd room from east at south located at apt pvt, 1st story, 1st apartment from north at east

    Jul 20, 2026 · Apt PVT

    Open — Nov sent out
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt pvt, 1st story, 1st apartment from north at east

    Jul 15, 2026 · Apt PVT

    Open — Certification postponment granted

DOB building violations · 0

No DOB violations on record

ECB violations · 2

  • Class - 1

    Rca issued 06/09/25 to same respondent & no permits issued, jobs filed, appointments made or proof submitted to show correction of rca for work w/out a permit at cellar level installed water & waste lines for a

    Oct 16, 2026 · Penalty $2,500

    Active
  • Class - 2

    Rca issued 06/09/25 same respondent no permits issued jobs filed new c/o obtain appointments made or proof submitted to show correction for residence converted from legal 1 fam to an illegal 2 fam dept. records

    Oct 16, 2026 · Penalty $2,500

    Active

Complaints

  • Unsanitary condition

    Pests

    Aug 29, 2026 · Apt PH

    Close
  • Unsanitary condition

    Mold

    Aug 29, 2026 · Apt PH

    Close
  • Flooring/stairs

    Stairs

    Aug 18, 2026 · Apt PVT

    Close
  • Water leak

    Slow leak

    Aug 18, 2026 · Apt PVT

    Close
  • Unsanitary condition

    Pests

    Aug 18, 2026 · Apt PVT

    Close
  • Plumbing

    Toilet

    Aug 18, 2026 · Apt PVT

    Close
  • Appliance

    Electric/gas range

    Aug 18, 2026 · Apt PVT

    Close
  • Water leak

    Slow leak

    Aug 18, 2026 · Apt PVT

    Close
  • Unsanitary condition

    Pests

    Aug 12, 2026 · Apt FIRSTF

    Close
  • Paint/plaster

    Ceiling

    Aug 12, 2026 · Apt FIRSTF

    Close
Show 40 more ↓
  • Unsanitary condition

    Mold

    Aug 12, 2026 · Apt FIRSTF

    Close
  • Unsanitary condition

    Pests

    Aug 12, 2026 · Apt FIRSTF

    Close
  • Appliance

    Electric/gas range

    Aug 12, 2026 · Apt FIRSTF

    Close
  • Plumbing

    Basin/sink

    Aug 12, 2026 · Apt FIRSTF

    Close
  • Plumbing

    Toilet

    Aug 11, 2026 · Apt PRIVAT

    Close
  • Plumbing

    Toilet

    Aug 11, 2026 · Apt PRIVAT

    Close
  • Plumbing

    Basin/sink

    Aug 11, 2026 · Apt PRIVAT

    Close
  • Unsanitary condition

    Mold

    Aug 11, 2026 · Apt PRIVAT

    Close
  • Water leak

    Damp spot

    Aug 11, 2026 · Apt PRIVAT

    Close
  • Water leak

    Slow leak

    Aug 11, 2026 · Apt PRIVAT

    Close
  • Paint/plaster

    Cabinet

    Aug 11, 2026 · Apt PRIVAT

    Close
  • Appliance

    Electric/gas range

    Aug 11, 2026 · Apt PRIVAT

    Close
  • Plumbing

    Basin/sink

    Jul 22, 2026 · Apt PRIVAT

    Close
  • Plumbing

    Bathtub/shower

    Jul 22, 2026 · Apt PRIVAT

    Close
  • General

    Ventilation system

    Jul 22, 2026 · Apt PRIVAT

    Close
  • Unsanitary condition

    Pests

    Jul 22, 2026 · Apt PRIVAT

    Close
  • Paint/plaster

    Ceiling

    Jul 22, 2026 · Apt PRIVAT

    Close
  • Plumbing

    Toilet

    Jul 22, 2026 · Apt PRIVAT

    Close
  • Plumbing

    Toilet

    Jul 22, 2026 · Apt PRIVAT

    Close
  • Water leak

    Heavy flow

    Jul 22, 2026 · Apt PRIVAT

    Close
  • Water leak

    Slow leak

    Jul 22, 2026 · Apt PRIVAT

    Close
  • Appliance

    Electric/gas range

    Jul 22, 2026 · Apt PRIVAT

    Close
  • Water leak

    Slow leak

    Jun 22, 2026 · Apt PVT

    Close
  • Plumbing

    Toilet

    Jun 22, 2026 · Apt PVT

    Close
  • Appliance

    Electric/gas range

    Jun 22, 2026 · Apt PVT

    Close
  • Unsanitary condition

    Pests

    Jun 22, 2026 · Apt PVT

    Close
  • Unsanitary condition

    Pests

    Jun 16, 2026 · Apt PH

    Close
  • Plumbing

    Bathtub/shower

    Jun 16, 2026 · Apt PH

    Close
  • Appliance

    Electric/gas range

    Jun 16, 2026 · Apt PH

    Close
  • Unsanitary condition

    Pests

    May 26, 2026 · Apt PH

    Close
  • Plumbing

    Toilet

    May 26, 2026 · Apt PH

    Close
  • Unsanitary condition

    Pests

    May 26, 2026 · Apt PH

    Close
  • Water leak

    Slow leak

    May 26, 2026 · Apt PH

    Close
  • Appliance

    Electric/gas range

    May 26, 2026 · Apt PH

    Close
  • Plumbing

    Water supply

    Jan 13, 2025 · Apt 2

    Close
  • Plumbing

    Water supply

    Jan 13, 2025 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Jan 13, 2025 · Apt 2

    Close
  • Plumbing

    Basin/sink

    Jan 13, 2025 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Dec 21, 2024 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Dec 21, 2024 · Apt 1

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
One-family home (A5)
Year built
1940
Floors
2
Residential units
1
Building area
1,224 ft²
Lot area
1,638 ft²
Zoning
R2A
Community board
413
Council district
23
Block / lot
8562 / 52
Assessed value
$39,900
Landmark / historic district
No

HPD registration #928615, last renewed Nov 12, 2025.

Questions about 80-39 249 Street

Who owns 80-39 249 Street?

The owner of record in NYC Department of City Planning PLUTO data is Aminyar, Friba.

Does 80-39 249 Street have violations?

Yes. NYC HPD has recorded 60 housing violations at this property.

Is 80-39 249 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 80-39 249 Street built?

City records list 1940 as the year it was built.

How many apartments are in 80-39 249 Street?

It has 1 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.