242-15 Church Street
Queens, NY 11363BBL 4-08108-0076Map
Owner of record: Valcamre2 LLC
242-15 Church Street is a walk-up apartment building built in 1940 in Queens, 11363. It has 4 residential units across 2 floors. The owner of record is Valcamre2 LLC. HPD has recorded 22 housing violations here, most recently on June 11, 2026. 22 of the 22 most recent violations are still open.
- HPD violations
- 22
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 42
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 22
- CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures . in the entire apartment located at apt 2a, 2nd story, 1st apartment from west at north
Jun 11, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective porcelain glaze bathtub in the 1st bathroom located at apt 2a, 2nd story, 1st apartment from west at north
Jun 11, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain glaze bathtub in the 2nd bathroom located at apt 2a upper level, 2nd story, 1st apartment from west at north
Jun 11, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 1w, 1st story
Nov 15, 2013 · Apt 1W
Open — Nov certified late - BHazardous
Properly secure the loose electric switch north wall in the bathroom located at apt 1w, 1st story
Nov 15, 2013 · Apt 1W
Open — Nov certified late - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceilings & walls throughout in the entire apartment located at apt 1w, 1st story
Nov 15, 2013 · Apt 1W
Open — Nov sent out - BHazardous
Replace with new the missing window glass pane in the kitchen located at apt 1w, 1st story
Nov 15, 2013 · Apt 1W
Open — Nov certified late - BHazardous
Properly repair the broken or defective lower sash window throu window sash throughout in the entire apartment located at apt 1w, 1st story
Nov 15, 2013 · Apt 1W
Open — Nov certified late - BHazardous
Properly repair with similar material the broken or defective concrete paving south yard
Nov 15, 2013
Open — Nov certified late - BHazardous
Properly repair with similar material the broken or defective concrete paving west yard
Nov 15, 2013
Open — Nov certified late
Show 12 more ↓
- BHazardous
Properly repair with similar material the broken or defective concrete paving north yard
Nov 15, 2013
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 1w, 1st story
Nov 15, 2013 · Apt 1W
Open — Nov certified late - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1w, 1st story
Aug 28, 2013 · Apt 1W
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the bathroom located at apt 1w, 1st story
Aug 28, 2013 · Apt 1W
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and walls in the entire apartment located at apt 1w, 1st story
Aug 28, 2013 · Apt 1W
Open — Certification postponment granted - BHazardous
Properly repair the broken or defective window cranks in the entire apartment located at apt 1w, 1st story
Aug 28, 2013 · Apt 1W
Open — Nov sent out - BHazardous
Replace with new the missing glass window pane in the kitchen located at apt 1w, 1st story
Aug 28, 2013 · Apt 1W
Open — Nov sent out - BHazardous
Properly secure the loose light switch at south wall in the bathroom located at apt 1w, 1st story
Aug 28, 2013 · Apt 1W
Open — Nov sent out - BHazardous
Replace with new the missing stone tile at front yard
Aug 23, 2013
Open — Certification postponment denied - BHazardous
Properly repair the broken or defective paving west and rear yard
Aug 23, 2013
Open — Nov certified late - BHazardous
Properly secure the loose ceiling light fixture at porch at building entrance , 1st story
Aug 23, 2013
Open — Nov certified late - ANon-hazardous
Repair the broken or defective rain leader at exterior wall at building front , 1st story
Aug 23, 2013
Open — Invalid certification
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Plumbing
Basin/sink
Aug 19, 2026 · Apt 2A
Close - Plumbing
Bathtub/shower
Aug 19, 2026 · Apt 2A
Close - Door/window
Door
Aug 19, 2026 · Apt 2A
Close - Electric
Power outage
Jun 13, 2026 · Apt 2A
Close - Electric
Power outage
Jun 9, 2026 · Apt 2A
Close - Unsanitary condition
Pests
Jun 9, 2026 · Apt 2A
Close - Plumbing
Bathtub/shower
Jun 9, 2026 · Apt 2A
Close - Heat/hot water
Entire building
Jan 16, 2026 · Apt 1B
Close - Construction
Pavement
Nov 8, 2013 · Apt 1W
Close - Construction
Pavement
Nov 8, 2013 · Apt 1W
Close
Show 32 more ↓
- Construction
Pavement
Nov 8, 2013 · Apt 1W
Close - General
Windows
Nov 8, 2013 · Apt 1W
Close - General
Windows
Nov 8, 2013 · Apt 1W
Close - General
Windows
Nov 8, 2013 · Apt 1W
Close - Paint/plaster
Wall
Nov 8, 2013 · Apt 1W
Close - Paint/plaster
Wall
Nov 8, 2013 · Apt 1W
Close - Electric
Wiring
Nov 8, 2013 · Apt 1W
Close - Electric
Lighting
Nov 8, 2013 · Apt 1W
Close - Electric
Lighting
Nov 8, 2013 · Apt 1W
Close - Paint/plaster
Ceiling
Nov 8, 2013 · Apt 1W
Close - Paint/plaster
Wall
Oct 24, 2013 · Apt 1W
Close - Paint/plaster
Ceiling
Oct 24, 2013 · Apt 1W
Close - General
Windows
Oct 24, 2013 · Apt 1W
Close - General
Windows
Oct 24, 2013 · Apt 1W
Close - General
Windows
Oct 24, 2013 · Apt 1W
Close - Electric
Lighting
Oct 24, 2013 · Apt 1W
Close - Electric
Electric-supply
Oct 24, 2013 · Apt 1W
Close - General
Windows
Aug 22, 2013 · Apt 1W
Close - Construction
Pavement
Aug 22, 2013 · Apt 1W
Close - Electric
Wiring
Aug 22, 2013 · Apt 1W
Close - General
Windows
Aug 22, 2013 · Apt 1W
Close - Construction
Pavement
Aug 22, 2013 · Apt 1W
Close - Paint/plaster
Wall
Aug 22, 2013 · Apt 1W
Close - Paint/plaster
Ceiling
Aug 22, 2013 · Apt 1W
Close - Paint/plaster
Door/frame
Aug 22, 2013 · Apt 1W
Close - Paint/plaster
Door/frame
Aug 22, 2013 · Apt 1W
Close - Paint/plaster
Cabinet
Aug 22, 2013 · Apt 1W
Close - Paint/plaster
Ceiling
Aug 22, 2013 · Apt 1W
Close - Electric
Lighting
Aug 22, 2013 · Apt 1W
Close - Paint/plaster
Ceiling
Aug 22, 2013 · Apt 1W
Close - Paint/plaster
Ceiling
Aug 22, 2013 · Apt 1W
Close - Plumbing
Water-leaks
Aug 22, 2013 · Apt 1W
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C3)
- Year built
- 1940
- Floors
- 2
- Residential units
- 4
- Building area
- 4,180 ft²
- Lot area
- 4,047 ft²
- Zoning
- R1-2
- Community board
- 411
- Council district
- 19
- Block / lot
- 8108 / 76
- Assessed value
- $481,500
- Landmark / historic district
- No
HPD registration #930174, last renewed Jun 4, 2026.
Questions about 242-15 Church Street
Who owns 242-15 Church Street?
The owner of record in NYC Department of City Planning PLUTO data is Valcamre2 LLC.
Does 242-15 Church Street have violations?
Yes. NYC HPD has recorded 22 housing violations at this property.
Is 242-15 Church Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 242-15 Church Street built?
City records list 1940 as the year it was built.
How many apartments are in 242-15 Church Street?
It has 4 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.