roofy

189-10 Grand Central Pkwy

Queens, NY 11423BBL 4-07277-0001Map

Owner of record: NYC Department Of Education

189-10 Grand Central Pkwy is a school building built in 1951 in Queens, 11423. The owner of record is NYC Department Of Education. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
21
ECB violations
43
HPD complaints
0

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 21

  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 20, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 6, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
Show 11 more ↓
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 13, 1997

    Dob violation - active
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 13, 1997

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Mar 8, 1996

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Apr 17, 1995

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    May 31, 1994

    Dob violation - dismissed
  • Elevator elevatoroptional

    1

    Jun 28, 1993

    Dob violation - dismissed
  • Elevator elevatoroptional

    1

    Apr 7, 1992

    Dob violation - dismissed
  • Elevator elevatoroptional

    1

    Apr 25, 1991

    Dob violation - dismissed
  • Elevator elevatoroptional

    1

    Jun 29, 1990

    Dob violation - dismissed
  • Elevator elevatoroptional

    1

    Oct 12, 1989

    Dob violation - dismissed

ECB violations · 43

  • Class - 2

    Reissued ecb #35719695r. failure to maintain building in code-compliant manner. noted smoke doors not self-closing at 2nd floor at stair c, 1st floor at stair b. remedy: repair and/or replace.

    May 1, 2026 · Penalty $3,125

    Resolve
  • Class - 2

    Exit doors not self-closing. noted: exit door #7 and at bulkhead at stair c door to the roof not self-closing. remedy: repair/replace door.

    May 1, 2026 · Penalty $625

    Resolve
  • Class - 2

    Reissued ecb #35719686z. failure to maintain building in code-compliant manner. noted no guardrails installed at all roof levels at school. remedy: repair and/or replace.

    May 1, 2026 · Penalty $3,125

    Active
  • Class - 2

    Reissue#35677431y failure to maintain building in code-compliant manner.noted at 2nd floor smoke at stair c,1st floor smoke at stair b,exit 7 and bulkhead at stair c.checks in disrepair at doors throughout whol

    May 9, 2025 · Penalty $3,125

    Resolve
  • Class - 2

    Reissue#35677430m failure to maintain building in code-compliant manner.at time of inspection no guardrails installed at all roof levels at school.rem:repair and/or replace.

    May 9, 2025 · Penalty $3,125

    Active
  • Class - 2

    Failure to maintain building in code compliant manner.noted at glass broken at bulkhead door,window stair a and cafeteria.rem:repair and/or replace glass.

    May 9, 2025 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to maintain building in code-compliant manner:illumination forexits,exit discharges and public corridors per bc 1006.1;27-381.rem:repair/replace lighting.

    May 9, 2025 · Penalty $1,250

    Resolve
  • Class - 2

    Reissue#35677432x failure to maintain building in code-compliant manner.noted at exit 7 exterior sidewalk in disrepair with holes in concrete causing tripping hazards.rem:repair and/or replace sidewalk.

    May 9, 2025 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to maintain building in code-compliant manner.noted at bulkheads stairs a,b,c running cracks around doorways and walls,stair c ceiling water penetration.rem:repair and/or replace.

    May 9, 2025 · Penalty $1,250

    Resolve
  • Class - 2

    Reissue 35674927y. failure to maintain building in code-compliant manner. no guardrails install at roof levels on all roofs of school. remedy: repair and/or replace.

    May 14, 2024 · Penalty $1,562

    Active
Show 33 more ↓
  • Class - 2

    Failure to maintain building in code-compliant manner. doors not self-closing, hardware broken or missing rooms 101, 119, 120, 208, 203, 210, 216, 218, 220, 224 and hallway door by 219 stays open 2in. remedy: r

    May 14, 2024 · Penalty $625

    Resolve
  • Class - 2

    Failure to maintain building in code-compliant manner. back of a and dbetween exit 7 and 8 slab shifting open gap between slab and building and section of slab in front of exit 7 broken. remedy: repair and/or r

    May 14, 2024 · Penalty $625

    Resolve
  • Class - 2

    Failure to maintain building in code-compliant manner.observed no guardrails at roof level at all roof.rem:repair and/or replace install guardrails.

    Apr 14, 2023 · Penalty $625

    Active
  • Class - 2

    Failure to maintain building in code-compliant manner.observed outsideof exit 7 walkway have missing sections of concrete to entry/exit doorrem:replace and/or replace.

    Apr 14, 2023 · Penalty $625

    Resolve
  • Class - 2

    Exit door not self-closing. note: at auditorium exit #7 and cafeteria exit 4 doors are not self closing. remedy: repair/replace door

    Mar 14, 2019

    Resolve
  • Class - 2

    Exit door not self closing in auditorium exit 7 back side door one door, in stair "a" left side door 2nd floor one door, in corridor nearroom 208 2nd flr one door. exit doro not self closing at the time of

    Apr 6, 2018

    Resolve
  • Class - 2

    The bullnose wall tile is cracked and runs appx 4ft long located in the corridor hallway by room 253 on the 3rd floor lvl rem: replace cracked bull nose tiles

    May 30, 2012

    Resolve
  • Class - 2

    No fire stopping provided in the gas meter room noted pipe penetrationthrough the wall has open gaps w/o fire stopping at cellar lvl rem: provide maintain fire stopping

    Feb 18, 2009

    Resolve
  • Class - 2

    Reissue 34692357y stairway c is missing 2 doors located on the 1st fl lvl rem: replace missing doors

    Feb 18, 2009

    Resolve
  • Class - 2

    Reissue 34692356m roof has become porous and allowing rain to enter the bldg causing interior damages by staircase a & b on the 2nd fl lvl adjacent to the windows rem: water proof exterior roof

    Feb 18, 2009

    Resolve
  • Class - 2

    Reissue 34692359h roof has become porous and allowing rain water to enter the bldg causing interior damages at staircase g 2nd floor lvl near the skylight rem: water proof exterior roof

    Feb 18, 2009

    Resolve
  • Class - 2

    Reissue 34692360p windows in the auditorium on the 1st fl lvl is defective windows do not open on close properly rem: repair replace windows

    Feb 18, 2009

    Resolve
  • Class - 2

    Reissue: 34577265n failure to maintain bldg in code compliant manner. noted: stairway case "c" has manner. noted: stairway case "c" has 2 door missing on the 1st flr level. remedy: repair and or replace 2 doors

    Aug 13, 2008

    Resolve
  • Class - 2

    Failure to maintain bldg walls or appurtenances. noted: windows in theauditorium 1st flr level is defective. windows can not open or close. remedy: maintain exterior bldg wall.

    Aug 13, 2008

    Resolve
  • Class - 2

    Reissue: 34577266p failure to maintain bldg walls or appurtenances. noted: roof has become porous and allowing rain water into the bldg causing interior damages by staircase "g&f" in the gymnasium 1st flr level

    Aug 13, 2008

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner. noted: glazed blocks are cracked in the corridor at the 1st flr adj to room 108. remedy: repair and or replace glazed block tiles.

    Aug 13, 2008

    Resolve
  • Class - 2

    Reissue: 34577267r failure to maintain bldg walls or appurtenances. noted: roof has become porous and allowing rain water into the bldg causing interior damages by stairway a and b adj to the windows. remedy:

    Aug 13, 2008

    Resolve
  • Non-hazardous

    2 stairwell doors missing at 1fl stairwell c.reissue 34400843m.remedy:replace missing doors.

    Jun 22, 2007 · Penalty $2,500

    Resolve
  • Non-hazardous

    Water penetration through roof into auditorium stairway g & f & room 253 bathroom.remedy:stop water penetration & make all necessary repairs,

    Jun 22, 2007 · Penalty $2,500

    Resolve
  • Non-hazardous

    Water penetration through exterior wall into stairway b & a at landingto bulkhead,above window.remedy:make all necessary repairs stop water penetration.

    Jun 22, 2007 · Penalty $2,500

    Resolve
  • Non-hazardous

    Farrar & trefts ftfb bcr lp steam,oil,1950.b4b(27-127)entire external insulation on referenced boiler is asbestos.selective abatement done to facilitate welded repair on modle (g) & surface blow down notice

    Feb 6, 2007

    Resolve
  • Non-hazardous

    Farrar & trefts,ftfb blr,lp steam,oil,1950.b4b(27-127) entire external insulation on referenced boiler is asbestos.selective removal of material done to facilitate welded repairs.50-plant must perform complete

    Feb 6, 2007

    Resolve
  • Non-hazardous

    Failure to maintain stairwell doors 2 doors are missing @ 1st flr level stairwell c.remedy:replace doors @ above location

    May 25, 2006

    Resolve
  • Non-hazardous

    Failure to maintain roof leaks into classrooms 103,223,220,217,216,210.remedy:stop water penetration unto classroom

    May 25, 2006

    Resolve
  • Non-hazardous

    Failure to maintain ceiling in classrooms plaster is spalling from water penetration from roof in samll areas. location rm 103,223,220,217,216,210.remedy:repair ceiling

    May 25, 2006

    Resolve
  • Non-hazardous

    Use of illegal harware.noted:at exits "c" and "d" each door (4) has comnination padlock/sliding bolt installed.also noted:none of the four doors were locked at time of inspection.remedy:remove illegal hardware

    Jan 9, 2004

    Resolve
  • Non-hazardous

    Use of illegal hardware notedat exits "a" and "b" each door (4) has combination padlock/sliding bolt installed.also noted:none of the four doors were locked at time of inspection.remedy:remove illegal hardware

    Jan 9, 2004

    Resolve
  • Non-hazardous

    Failure to maintain.noted:in room 224 rear wall has wall structual crack.remedy:make all necessary repairs

    Jan 9, 2004

    Resolve
  • Non-hazardous

    Exit passageway corridor obstructed:noted:exit passageway corridor (g)obstructed by 6'x6' portable blackboard.remedy:remove obstruction

    Jan 9, 2004

    Resolve
  • Non-hazardous

    Failure to maintain bldg exterior wall defectrs are crack on exterior force of bride on east elevation of west wing.not crack is on return next to courtyard play area.rem:repair immediately,obtain all permit re

    Feb 9, 2001

    Resolve
  • Non-hazardous

    Failure to maintain bldg:defects are crack wall over doorway in hallway next to rm b4.crack wall in rm 224-202.crack wall tiles in cafeteria,1fl hallway next to rms 110 and 108,stair e at 2 fl level and on wind

    Feb 9, 2001

    Resolve
  • Hazardous

    Failue to maintain bldg exterior. noted: playfield surface cracked & uplifted. not all windows operable throughout school. parapet walls at roof below 42" & w/o guard rails. remedy: maintain bldg exterior.

    Mar 5, 1999

    Resolve
  • Hazardous

    73k11. cease use of sidewalk elevator #164 until all rotted and rustedparts arerenewed and a test performed

    Oct 5, 1990

    Resolve

Complaints

No HPD complaints in our records

Complaint data is still being backfilled from NYC Open Data.

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
School building (W1)
Year built
1951
Floors
2
Residential units
—
Building area
63,114 ft²
Lot area
109,938 ft²
Zoning
R2A
Community board
408
Council district
23
Block / lot
7277 / 1
Assessed value
$9,549,000
Landmark / historic district
No

Questions about 189-10 Grand Central Pkwy

Who owns 189-10 Grand Central Pkwy?

The owner of record in NYC Department of City Planning PLUTO data is NYC Department Of Education.

Does 189-10 Grand Central Pkwy have violations?

NYC HPD has no housing violations on record for this property.

Is 189-10 Grand Central Pkwy rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 189-10 Grand Central Pkwy built?

City records list 1951 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.