roofy

64-41 Utopia Parkway

Queens, NY 11365BBL 4-07083-0001Map

Owner of record: Jewish Institute Of Queens

64-41 Utopia Parkway is a religious facility built in 1957 in Queens, 11365. The owner of record is Jewish Institute Of Queens. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
7
ECB violations
21
HPD complaints
0

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 7

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 7, 1994

    Dob violation - dismissed

ECB violations · 21

  • Class - 2

    Observed at exposure#1 front approximately 10 yards of combustible construction material throughout accessible to public making it hazardous condition. maintain housing keeping., maintain adequate construction

    Jul 19, 2026 · Penalty $1,250

    Active
  • Class - 2

    Job site fence constructed at exposure#1 front missing sections and state of disrepair., comply with code; make repairs as per code.

    Jul 19, 2026 · Penalty $1,000

    Resolve
  • Class - 1

    At the time of inspection of a 3-story building, i observed active job site. at the first-floor balcony, the guardrail system was inadequate, creating a 9-foot fall hazard. at the elevator landing at exp# 4, a

    Oct 1, 2025 · Penalty $5,000

    Resolve
  • Class - 2

    Miscellaneous violations.atoi i observed several installed supported scaffolds at exposure#2,#4 and roof level of the premises;that did not meet code specification-miscellaneous violation-bc 3314.1 missing toe

    Sep 26, 2025 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to comply with manufacturer specifications.atoi i observed yodock barricades in the public roadway at exp#1 not completely connectedand not filled with water.this poses hazard for vehicular traffic.rem:

    Sep 26, 2025 · Penalty $1,250

    Resolve
  • Class - 2

    At time of inspection, i observed mobile office on street at exposure #1 unenclosed as per code section bc 3307.4.7. also, the site safety plan shows the equipment movable within the barricade but contractor m

    Mar 19, 2025 · Penalty $2,400

    Resolve
  • Class - 2

    At time of inspection, i observed the structural frame of job site fence at exposure #2 was installed outwards instead of on the inside of site as per plan pg. eq-003.00.

    Mar 19, 2025

    Resolve
  • Class - 1

    At time of inspection observed a proposed 2 story alteration building. upon inspecting observed work was not conforming to approved soe drawings. soe drawings indicated rakers to be installed at expo #3 by the

    Oct 2, 2024 · Penalty $625

    Resolve
  • Class - 2

    At time of inspection observed a proposed 2 story alteration building. upon inspecting observed excavation taking place and the wall for the adjacent building at expo #4 is exposed with no waterproofing in plac

    Oct 2, 2024 · Penalty $2,500

    Resolve
  • Class - 2

    New cmu parapet on roof level, installing long poles for structural changes, job filling on agency files with objections. active permit in system for partial demo on open spaces, no permit obtain for work in pr

    Oct 12, 2023 · Penalty $1,250

    Resolve
Show 11 more ↓
  • Class - 2

    Water conditions. observed exterior cellar lvl area at exp#2 with excessive water accumulation of over 6" across approx. 70 sqft- no dewatering system was observed on site. this condition may lead to foundation

    Aug 29, 2023 · Penalty $3,125

    Resolve
  • Class - 2

    Observed exterior cellar lvl area at exp#2 with several piles of accumulated debris including concrete rubble, wood scraps and insulation scraps- piles approx. 5-6ft high and approx. 8ftx8ft in size. site was n

    Aug 29, 2023 · Penalty $3,125

    Resolve
  • Class - 2

    Observed jobsite fence at exp#1 & 2 with several loose/disconnected fence panels, several broken/chipped fence panels, several nails/screws protruding into the pedestrian walkway/sidewalk, and several viewing p

    Aug 29, 2023 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to maintain building in a code compliant manner. noted; at front of property excessive amount of debris stored. also noted; fence at front has fallen., repair and/or replace

    Jan 3, 2022 · Penalty $312

    Resolve
  • Class - 2

    No storage in boiler room, light in room not working, support on flue pipe wrong material and covers missing from controls correct all violating conditions and submit a certificate of correction

    Jul 14, 2021 · Penalty $625

    Resolve
  • Class - 1

    Unlawful act failure to comply with order of the commissioner.failure to certify correction for ecb#34793837x.rem:certify correction.

    Jan 10, 2018 · Penalty $800

    Resolve
  • Class - 2

    Violation of parking regulation in a residential district.noted:@time of inspection observed 3school buses parked @the left side of bldg contrary to parking regulation and cofo #104637 dated 09/08/55.rem:confor

    Jan 27, 2017 · Penalty $400

    Resolve
  • Class - 2

    Work w/o a permit.noted;@ left side rear,erected wooden canopy approx.8'x 30' with corrugated plastic roof coverig stairway.rem:obtain permit and/or restore to prior legal condition.

    Jan 22, 2015 · Penalty $2,000

    Resolve
  • Class - 3

    Work does not conform to approved construction documents and/or amendments. job #410126402/az dated 4.15.09 of which permit expired 6.28.09.non-conforming work noted: 1) plan shows seven sprinkler heads in the

    Jun 3, 2010 · Penalty $500

    Active
  • Class - 2

    Work w/o a permit north of bldg installed 25ftl curb cut (measured) no permits on file also created a concrete dad in excess of 625 sqft no permits filed remedy: obtain permits or restore to prior legal

    Oct 27, 2009 · Penalty $800

    Resolve
  • Non-hazardous

    Work without a permit installed roof mounted refrigeration equipment remedy obtain a permit

    Nov 22, 1989 · Penalty $250

    Resolve

Complaints

No HPD complaints in our records

Complaint data is still being backfilled from NYC Open Data.

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Religious facility (M9)
Year built
1957
Floors
2
Residential units
—
Building area
59,329 ft²
Lot area
40,272 ft²
Zoning
R2A
Community board
408
Council district
24
Block / lot
7083 / 1
Assessed value
$3,761,883
Landmark / historic district
No

Questions about 64-41 Utopia Parkway

Who owns 64-41 Utopia Parkway?

The owner of record in NYC Department of City Planning PLUTO data is Jewish Institute Of Queens.

Does 64-41 Utopia Parkway have violations?

NYC HPD has no housing violations on record for this property.

Is 64-41 Utopia Parkway rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 64-41 Utopia Parkway built?

City records list 1957 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.