roofy

61-27 186 Street

Queens, NY 11365BBL 4-07075-0041Map

Owner of record: Mayflower Business Group LLC

61-27 186 Street is a hotel built in 2014 in Queens, 11365. It has 20 residential units across 12 floors. The owner of record is Mayflower Business Group LLC. HPD has recorded 14 housing violations here, most recently on May 8, 2026. 7 of the 14 most recent violations are still open.

HPD violations
14
DOB violations
58
ECB violations
72
HPD complaints
18

What to know

Concern
2 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 8, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 14

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 8, 2026

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 21, 2025

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing on wall, at public hall, 1st story

    Jun 29, 2025

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Jun 29, 2025

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 16, 2025

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Dec 2, 2024

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 18, 2024

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 24, 2023

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 16, 2022

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1007, 10th story, 5th apartment from south at west

    Mar 21, 2022 · Apt 1007

    Open — Nov sent out
Show 4 more ↓
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Mar 21, 2022

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 10, 2022

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Mar 10, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 20, 2021

    Closed — Violation dismissed

DOB building violations · 58

  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 3, 2024

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2024

    Dob violation - active
  • Hazardous condition (facade) facade required

    Cycle 9a unsafe report filed

    Apr 18, 2024

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 23, 2024

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 3, 2023

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 3, 2023

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2023

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 2, 2023

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2022

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2022

    Dob violation - dismissed
Show 40 more ↓
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2022

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 1, 2022

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 2, 2022

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2021

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2021

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2021

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 16, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 16, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 16, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 16, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 16, 2021

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 2, 2021

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Apr 29, 2021

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 3, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 3, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 3, 2020

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 30, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 30, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 30, 2019

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator - failure to file category 1 2017 inspection/test

    Apr 5, 2019

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 16, 2019

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2016 inspection/test

    Sep 15, 2017

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2016 inspection/test

    Sep 15, 2017

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 4, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 4, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 4, 2017

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 28, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 30, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 16, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 16, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 16, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 2, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 2, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 5, 2016

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jul 1, 2016

    Vp*-violation unserved ecb- dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 15, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 15, 2016

    Dob violation - dismissed

ECB violations · 72

  • Class - 2

    Failure to file acceptable cycle 9a report indicating correction of unsafe condition described in initial facades report required by 28-302.5 for control #918139. remedy: file acceptable report.

    Apr 20, 2026 · Penalty $6,250

    Active
  • Class - 1

    Failure to maintain adequate housekeeping per section requirements.note:observed respondent failure to comply with previously written violation #35669460n dated 12/20/22 on roof building materials such as wood

    Feb 2, 2023 · Penalty $12,500

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping per section requirements. note:observed on the roof building materials such as metal flashing,wood,pvc pipes and flooring,stored in an unsecured manner. remedy:comply w

    Dec 20, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit acceptable required cycle9a report of critical exam documenting condition of exterior wall&appurtenances required by 28-302.4 for control918139.submit acceptable required technical report

    Dec 2, 2022 · Penalty $6,250

    Active
  • Class - 2

    Failure to maintain building and parts thereof in a code-compliant manner. illegal off-street parking maintained without dob approval contrary to zr 25-62, bc 3202.2.2.4, and/or dot specifications, creating a h

    Apr 21, 2022

    Resolve
  • Class - 2

    Work does not conform to approved construction documents &/or approvedamendments. note: on an loc request pc job#421408934 for wording signs"wyndhan garden hotel" indicate on plan to be installed on `86th stree

    May 3, 2017 · Penalty $250

    Resolve
  • Class - 2

    Temporary construction equipment in site-expired permit @time of inspection of 12 stry new bldg under construction has 8ft high wood construction fence erected under permit #420595038 has expired on 10/19/16 w.

    Oct 25, 2016 · Penalty $400

    Resolve
  • Class - 1

    Partial stop work order for supported scaffold issued pursuant to 28- 207.2 and posted at premises.unsafe condition.noted:observed supportedscaffold erected at exp#1.working levels are not fully planked.wood pl

    Sep 28, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    Missing/inadequate guard rails at time of inspection observed a new bldg erected up to 12 floors.during inspection noted that the guard rails were inadequate at 3rd floor and roof level creating hazardous condi

    Sep 10, 2016 · Penalty $2,400

    Resolve
  • Class - 2

    3308.3 vertical netting not per code, damaged or inadequate.at time of inspection observed a new bldg erected up to 12 floor.during inspection noted that vertical netting were damaged,not secured as required

    Sep 10, 2016 · Penalty $800

    Resolve
Show 40 more ↓
  • Class - 2

    Work w/out a permit. expired permit. @ time of insp of a 12 story new bldg under construction, has temp standpipe under job# 420896613-01-ew-sd has exposed on 3/17/16 w/ no renewal in system. rem: renew permit.

    Aug 11, 2016 · Penalty $400

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures or temporary construction-no toe boards. at time of inspection 12 sty new bldg fully enclosed,active waste site w/different trades at different sty's i ob

    Aug 11, 2016 · Penalty $1,000

    Resolve
  • Class - 1

    Work does not conform to approved construction construction documents &/or approved amendments. noted: at time of inspection of 12 sty new bldg under construction hasd overhead protection at exp#2 & 4 on site s

    Aug 11, 2016 · Penalty $1,000

    Resolve
  • Class - 1

    Failure to institute safety equipment measures or temporary construction-no guardrails. active of inspection observed 12 sty new bldg activesite w/different tracks at various floors bldg enclosed. i observed no

    Aug 11, 2016 · Penalty $1,200

    Resolve
  • Class - 1

    Sec. 28-110.1 osha 10. at time of inspection of 12 sty new bldg under construction which is a site safety job has approx construction was 12 construction workers performing various(trades)w/no osha 10 & availab

    Aug 11, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction operations. note: @ time of my insp of a 12 story bldg @ bulkhead level, constr work in progress. i observed workers dismantling scaffold & p

    Jul 16, 2016 · Penalty $10,000

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures or temporary construction-no guardrails noted: no guardrails at roof level and 9th floor exp3, creating a fall hazard for workers on site for 12 story

    Jul 1, 2016 · Penalty $1,200

    Resolve
  • Class - 1

    Failure to file evidence of compliance with workers comp law or and disability benefits law and liabilty insurance. at time of inspection apprx 20-25 men on active construction site with insurance policy

    Jul 1, 2016 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping per section requirements at time of inspection of 12 story new building has construction debris piled up creating no visible walkway or path also noted: at front has

    Jul 1, 2016 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to safeguard all persons and property affected by constructionoperations. note: active jobsite observed workers on supported scaffold apprx 60'in the air 1-not tied off at exp4; 2-working on 1-2 scaffol

    Mar 24, 2016 · Penalty $2,400

    Resolve
  • Class - 1

    Sec. 3314.4.3 inspections: supported scaffold. note: active jobsite,supported scaffold erected approx 12 sty enclosing jobsite on all exposures. observed workers on scaffold at exp#2,3,4. there has not been an

    Mar 24, 2016 · Penalty $1,600

    Resolve
  • Class - 2

    3301.7 design: required/contrary. note: active site, supported scaf fold erected 12 flrs around new bldg. workers apprx 9 flrs above tied off to eyehook fall protection system.there is no site specific design

    Mar 24, 2016 · Penalty $400

    Resolve
  • Class - 1

    Work does not conform to approved construction documents &/or amendments: scaffold. note: observed active job site,workers on supported scaffold approx 10 floors in the air. the supported scaffold enclose jobsi

    Mar 24, 2016 · Penalty $1,000

    Resolve
  • Class - 2

    3314.1.1 partial stop work order for supported scafofld issued pursuant to 28-207.2 and posted at premises. supported scaffold are in unsafeconditions.note: observed supported scaffold erected all around the bl

    Jan 26, 2016 · Penalty $400

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by const ops.noted:observed active jobsite,11th fl formwork rebar work in progress.observed @exp#3 men usinf mechanical hoisting device to lift large pcs of

    Dec 9, 2015 · Penalty $2,400

    Resolve
  • Class - 2

    Wok does not conform to approved const docs &/or approved amendments.note:observed active jobsite,11 fl rebar formwork is in progress.the supported scaffold enclosing the bldg in contrary to approved design dra

    Dec 9, 2015 · Penalty $500

    Resolve
  • Class - 2

    Failure to maintain:housekeeping.note:active jobsite, 11 fl formwork rebar in progress,workers working throughout site as well.@the 10 fl & 9th fl observed piles of const debris that need to be moved off site o

    Dec 9, 2015 · Penalty $800

    Resolve
  • Class - 2

    28-110.1 osha 10.at time of re-inspection of 12 story pr0posed new building site safety manager leonard m fig lic #248 presented as the sitesafety mangaer for site has no osha card presented at time of inspecti

    Nov 2, 2015 · Penalty $400

    Resolve
  • Class - 1

    Sec. 3310.6 designated site safety manager. at time of inspection notethat the pw2 of existing permit is not the ssm on site designated for job site. remedy: fswo provide ssm on pw2 call best for re-inspection.

    Sep 22, 2015 · Penalty $2,430

    Resolve
  • Class - 1

    Sec. 3310.9.1 concrete safety manager(expired lic registration)as noted: at time of inspection concrete placement at floor #10 & walls,shearwalls & columns at floor #9. failure of formwork at floor #9 exp#2

    Sep 22, 2015 · Penalty $1,600

    Resolve
  • Class - 2

    Submittal of construction documents. as noted: at time of inspection on an active construction site concrete placement at floor #10 and columns and shear walls at floor #9. complaint #4631872 concrete fell fro

    Sep 22, 2015 · Penalty $400

    Resolve
  • Class - 1

    Failure to safeguard public & property. at time of inspection noted that there was a concrete operation blowout on the 9th fl exp#2 of jobsite concrete fell out onto car below damaging exterior & interior of

    Sep 22, 2015 · Penalty $2,430

    Resolve
  • Class - 1

    Sec. 3307.3 overhead protection not provided. at time of inspection noted that there was no overhead protection @ exp#2 & 4 of jobsite as required by code. there is a shopping mall parking lot adjacent to the

    Sep 22, 2015 · Penalty $1,630

    Resolve
  • Class - 1

    Sec. 3310.2(e)(g)failure of concrete safety manager to perform required duties. as noted: at time of inspection concrete placement at floor #10 & walls,shear walls & columns,at floor #9. failure of formwork at

    Sep 22, 2015 · Penalty $1,600

    Resolve
  • Class - 2

    Work does not conform to approved construction documents or approved amendments. re-inspection call ceu 212-393-2730 as noted: at time ofi nspection on an active construction site observed at floor #8 observed

    Sep 9, 2015

    Resolve
  • Class - 2

    Work does not conform to approved construction documents and/or approved amendments. noted: at time of inspection of 12sty new building und er construction has sidewalk shed installed at exp1,under permit #4401

    Aug 18, 2015 · Penalty $530

    Resolve
  • Class - 2

    Failure to safeguard all persons and property affected by constructionoperations.noted:at tme of re-inspection observed the following for 12story new bldg under construction has sidewalk shed at exp1.under perm

    Aug 18, 2015 · Penalty $1,230

    Resolve
  • Class - 2

    Failure to provide required sidewalk shed parapet sign (panel) sh permit #440129264 exp10-17-15. rmdy: provide sidewalk shed parapet panel (sign) at site (on shed).

    Aug 6, 2015

    Resolve
  • Class - 1

    Workers (approve 4) were observed removing planks from supported scaf fold above 40'in height at exp3.these workers when asked did not provide requried 32h certificate to install,adjust,repair,maintain,inspect

    Aug 6, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    Work does not conform to approved construction documents/design draw ings temporary wood platform is elevated shaft at 5th flr does not conform to design drawings (eq-001.01) dated 9-16-14.no conforming work

    Aug 6, 2015 · Penalty $1,000

    Resolve
  • Class - 1

    3301.2 failure to provide adequate means of egress.both stairways are totally obstructed at the 6th flr by numerous reshores in stairway. bldg is currently 8 stories.scaffold stair towers are not legal means

    Aug 6, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    Unlawfully continued work while on notice of a stop work order.partialstop work order #073115cssumm05/35132877z was issued for side rails not secure,stair tower not secured. at time of inspection i observed wor

    Aug 6, 2015 · Penalty $4,800

    Resolve
  • Class - 2

    Partial stop work order for supported scaffold issued pursuant to 28-207.2 and posted at premises.work does not conform to approved construction documents.note:observed supported scaffold erected all around the

    Jul 31, 2015

    Resolve
  • Class - 1

    3314.1 partial stop work order for supported scaffold issued pursuant to 28-207.2 and posted at premises.scaffold in unsafe conditions.note:observed supported scaffold erected all around the building under perm

    Jul 31, 2015 · Penalty $1,600

    Resolve
  • Class - 2

    Failure to maintain adequate housekeeping per section requirements.note at time of inspection active construction site observed accumulationof combustible materials consist of all various type of wood materials

    Jul 23, 2015

    Resolve
  • Class - 2

    Sec. 1906.6 at time of inspection active construction site bldg complete to 8 sty observed reshores jacket installed at the perimeter of bldg not secure on 6th & 5th floor as required by code. remedy: comply w/

    Jul 23, 2015

    Resolve
  • Class - 1

    Work does not conform to approved construction documents and/or approved amendments.at time of inspection observed active jobsite, 6 flrs above ground.the ccdc on site states that full protection be in place,

    May 21, 2015 · Penalty $1,000

    Resolve
  • Class - 1

    3301.7. design required by chapter 33-material hoist. at time of inspection observed active jobsite 6 floors above ground.observed a material hoist in place in elevator shaft at the 6th flr erecting deck.also

    May 21, 2015 · Penalty $500

    Resolve
  • Class - 1

    Failure to maintain.no guardrails.at time of inspection observed active jobsite erecting 6th flr. at the 4th floor level at exp3 observed sections of guardrail missing approx 25'long missing guardrail at elev

    May 21, 2015 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to maintain housekeeping.at time of inspection observed activejobsite erecting 6th flr. at the 4th flr and 3rd flr observed construction debris,material scattered throughout the floors, pcs of wood,conc

    May 21, 2015 · Penalty $2,400

    Resolve

Complaints

  • Unsanitary condition

    Pests

    Aug 6, 2026 · Apt 402

    Close
  • Unsanitary condition

    Pests

    Aug 6, 2026 · Apt 402

    Close
  • Unsanitary condition

    Pests

    Aug 6, 2026 · Apt 402

    Close
  • Unsanitary condition

    Pests

    Aug 1, 2026 · Apt ROOM10

    Close
  • Unsanitary condition

    Pests

    Jul 26, 2026 · Apt 1013

    Close
  • Unsanitary condition

    Pests

    Jul 26, 2026 · Apt 1013

    Close
  • Unsanitary condition

    Pests

    Jul 26, 2026 · Apt 1013

    Close
  • Unsanitary condition

    Pests

    Jun 20, 2025 · Apt 1016

    Close
  • Unsanitary condition

    Pests

    May 16, 2025 · Apt 1016

    Close
  • Electric

    Outlet/switch

    Dec 4, 2024 · Apt 403

    Close
Show 8 more ↓
  • Heat/hot water

    Entire building

    Aug 10, 2022 · Apt 1015

    Close
  • Heat/hot water

    Entire building

    Mar 20, 2022 · Apt 1007

    Close
  • Unsanitary condition

    Pests

    Sep 4, 2020 · Apt 705

    Close
  • Unsanitary condition

    Pests

    Sep 22, 2018 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Aug 10, 2018 · Apt 1005

    Close
  • Unsanitary condition

    Pests

    Jan 22, 2018 · Apt 917

    Close
  • Unsanitary condition

    Pests

    Jan 22, 2018 · Apt 512

    Close
  • Nonconst

    Janitor/super

    Feb 8, 2006 · Apt 1

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Hotel (H2)
Year built
2014
Floors
12
Residential units
20
Building area
76,367 ft²
Lot area
12,000 ft²
Zoning
C4-2
Community board
408
Council district
23
Block / lot
7075 / 41
Assessed value
$10,741,500
Landmark / historic district
No

HPD registration #433513, last renewed Feb 17, 2023.

Questions about 61-27 186 Street

Who owns 61-27 186 Street?

The owner of record in NYC Department of City Planning PLUTO data is Mayflower Business Group LLC.

Does 61-27 186 Street have violations?

Yes. NYC HPD has recorded 14 housing violations at this property.

Is 61-27 186 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 61-27 186 Street built?

City records list 2014 as the year it was built.

How many apartments are in 61-27 186 Street?

It has 20 residential units and 132 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.