72-66 Main Street
Queens, NY 11367BBL 4-06623-0084Map
Owner of record: G&Y Main Street Plaza LLC
72-66 Main Street is a store building built in 1940 in Queens, 11367. The owner of record is G&Y Main Street Plaza LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 27
- ECB violations
- 27
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 27
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed
Show 17 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Construction other optional
C-construction other optional
Feb 12, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Marquee other required
Cmq-marquee other required
Jan 13, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boiler boiler optional
B-boiler boiler optional
Mar 6, 1998
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - dismissed
ECB violations · 27
- Class - 1
At the time of inspection of a 2-story building undergoing vertical and horizontal enlargement, inadequate roof protection was observed at exp# 2. coping stones on the adjacent property were not protected and w
May 20, 2026 · Penalty $10,000
Resolve - Class - 2
At the time of inspection of a 2-story active job site, a pump jack scaffold was observed at exposure 4 on the adjacent property without required safety measures or overhead protection, creating a hazard to pub
May 20, 2026 · Penalty $5,000
Resolve - Class - 1
At the time of inspection of a 2-story active job site, a stairway from the roof level to the basement was observed without required handrails, creating a hazard to workers and personnel. stop use of the stairw
May 20, 2026 · Penalty $2,500
Resolve - Class - 1
At the time of inspection of a 2-story active job site, styrofoam residue was observed throughout the street, on parked vehicles, and adjacent properties, creating a hazard to public safety and property. stop a
May 20, 2026 · Penalty $10,000
Resolve - Class - 1
2-story building active job site undergoing vertical and horizontal enlargement, 6 workers were observed performing styrofoam, stucco, electrical, and tile work. review of dob records found gc permit expired on
May 20, 2026 · Penalty $2,500
Resolve - Class - 1
Bc3314.1at inspection of a 2-story building under vertical/horizontal enlargement, pipe scaffold at exp# 1 and 4 was unsafe due to loose planking, missing guardrails, and unsecured components, creating hazard t
May 20, 2026 · Penalty $5,000
Resolve - Class - 1
At the time of inspection of a 2-story active job site, multiple unsafe violating conditions were observed. request was made for superintendent madison ramirez rosa;#- 027410) however, he was not present at the
May 20, 2026 · Penalty $10,000
Resolve - Class - 2
At the time of inspection of a 2-story active job site, the sidewalk shed at exp# 1 &4 was not maintained. posts were observed floating above grade and not bearing on the sidewalk, creating an immediate danger
May 20, 2026 · Penalty $2,400
Resolve - Class - 1
Ecb39535775j issued 01/08/2025 notes x brace protruding pass curb line,not resolved,hazard interference of mobile vehicle in event parallel parking striking delivery trucks leads sws instability and collapse.bc
May 7, 2025 · Penalty $6,250
Resolve - Class - 2
Respondent failed to correct violating condition and file for a certificate of correction pursuant to ac 28-204.4 for violation no. 39535756y issued 01/08/2025. at time of inspection, i observed inactive close
Mar 10, 2025 · Penalty $625
Resolve
Show 17 more ↓
- Class - 2
Respondent failed to correct violating condition and file for a certificate of correction pursuant to ac 28-204.4 for violation no. 39535757x issued 01/08/2025. at the time of inspection, i observed inactive cl
Mar 10, 2025 · Penalty $625
Resolve - Class - 2
Respondent failed to correct violating condition and file for a certificate of correction pursuant to ac 28-204.4 for violation no. 39535758h issued 01/08/2025. at time of inspection, i observed inactive closed
Mar 10, 2025 · Penalty $625
Resolve - Class - 2
Respondent failed to correct violating condition and file for a certificate of correction pursuant to ac 28-204.4 for violation no. 39535759j issued 01/08/2025. at time of inspection, i observed inactive closed
Mar 10, 2025 · Penalty $625
Resolve - Class - 2
Respondent failed to correct violating condition and file for a certificate of correction pursuant to ac 28-204.4 for violation no. 39535775j issued 01/08/2025. at time of inspection, i observed inactive closed
Mar 10, 2025 · Penalty $625
Resolve - Class - 1
Bc3314.1 supported scaffold @enlargement site observe unsafe supported scaffold in use to facilitate demolition of masonry wall with missing baseplates, platform not full decked nor tied down, no ladder for saf
Jan 8, 2025 · Penalty $5,000
Resolve - Class - 1
@active enlargement site with superintendent on permit i requested onsite personnel for site safety plan&orientation, sidewalk shed+fence plan,recent pre-shift safety meeting log&none were provided to ensure so
Jan 8, 2025 · Penalty $2,500
Resolve - Class - 1
Bc 3301.13.5 alternate construction superintendent.@active enlargement site with construction superintendent on permit observe ongoing unsafe demo operations&no competent person present where gc failed to ensur
Jan 8, 2025 · Penalty $5,000
Resolve - Class - 1
@active enlargement site observed no debris container on site for demo'd debris, equipment and debris obstructing egress passageway to street, and debris all over top of sidewalk shed deck creating hazards espe
Jan 8, 2025 · Penalty $2,500
Resolve - Class - 2
@active enlargement site observe incomplete exterior work (exterior masonry wall finish¶pet) approx. 20ft above adjoin neighboring property roof@exp#2(72-68)&the protection of roof in place not extended 20'
Jan 8, 2025 · Penalty $2,500
Resolve - Class - 1
Sidewalk shed. observe sidewalk shed in place on main st to 72 dr not conform to plans with missing horizontal braces where x braces in place for vertical members@ground level, tall shed x pipe brace above grou
Jan 8, 2025 · Penalty $2,500
Resolve - Class - 3
Failure to maintain in code-complaint manner. at time of inspection observed, 5 bulbs of sidewalk shed are not working., repair and or replace
Oct 9, 2024
Resolve - Class - 2
Lighting bc3307.6.4.8.@permitted enlargement site observe pedestrian protection sidewalk shed in place covering exposure#1(main st)&4(72 dr)& all of sheds light fixture in place for underside pedestrian passage
Aug 23, 2024 · Penalty $5,000
Resolve - Class - 2
Job fence #q00826747 permit expired on 08/01/24. at permitted enlargement site observe job fence in place at exposure#1(main st)&4 (72dr) with job fence permit verified in bis/dobnow to be expired since 08/01/2
Aug 23, 2024 · Penalty $3,125
Resolve - Class - 2
Failure to maintain, interior exit. noted: exit sign to 72 dr is not illuminated. egress steps at 2nd flr theaters are also not illuminated. remedy: repair/replace all defective lighting.
Jan 10, 2013 · Penalty $250
Resolve - Class - 2
Failure to maintain exterior. noted: theater marquee over sidewalk is damaged. remedy: repair marquee. obtain structural stability report from ny state licensed engineer.
Jan 10, 2013 · Penalty $250
Resolve - Non-hazardous
21-b,49,a.exposed oil lines b.remove debris and storage from boiler room.
Mar 6, 1998 · Penalty $400
Resolve - Non-hazardous
Altered bldg. occupied without a valid cert. of occupancy alt 500/88. remedy: obtain a new cert. of occupancy.
Apr 12, 1989 · Penalty $250
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Store building (K2)
- Year built
- 1940
- Floors
- 2
- Residential units
- —
- Building area
- 19,287 ft²
- Lot area
- 9,700 ft²
- Zoning
- R4
- Community board
- 408
- Council district
- 24
- Block / lot
- 6623 / 84
- Assessed value
- $1,098,900
- Landmark / historic district
- No
Questions about 72-66 Main Street
Who owns 72-66 Main Street?
The owner of record in NYC Department of City Planning PLUTO data is G&Y Main Street Plaza LLC.
Does 72-66 Main Street have violations?
NYC HPD has no housing violations on record for this property.
Is 72-66 Main Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 72-66 Main Street built?
City records list 1940 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.