roofy

40-08 204 Street

Queens, NY 11361BBL 4-06206-0033Map

Owner of record: Kim, Hae Yong

40-08 204 Street is a two-family home built in 1920 in Queens, 11361. It has 2 residential units across 2.5 floors. The owner of record is Kim, Hae Yong. HPD has recorded 14 housing violations here, most recently on April 29, 2016. 14 of the 14 most recent violations are still open.

HPD violations
14
DOB violations
1
ECB violations
3
HPD complaints
9

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Apr 29, 2016

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 14

  • B

    Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling. in the private hallway located at apt 2ndfl, 2nd story

    Apr 29, 2016 · Apt 2NDFL

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak ceiling. in the private hallway located at apt 2ndfl, 2nd story

    Apr 29, 2016 · Apt 2NDFL

    Open — Nov sent out
  • B

    Properly repair the broken or defective gas-range oven in the kitchen located at apt 2ndfl, 2nd story

    Apr 29, 2016 · Apt 2NDFL

    Open — Nov sent out
  • B

    Repair by closing so as to be gas tight all openings in the sink waste line. in the kitchen located at apt 2ndfl, 2nd story

    Apr 29, 2016 · Apt 2NDFL

    Open — Nov sent out
  • B

    Replace with new the broken or defective sink cabinet in the kitchen located at apt 2ndfl, 2nd story

    Apr 29, 2016 · Apt 2NDFL

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood and vinyl floor tiles. in the kitchen located at apt 2ndfl, 2nd story

    Apr 29, 2016 · Apt 2NDFL

    Open — Nov sent out
  • B

    Properly secure the loose sink faucets in the kitchen located at apt 2ndfl, 2nd story

    Apr 29, 2016 · Apt 2NDFL

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets bathtub. in the bathroom located at apt 2ndfl, 2nd story

    Apr 29, 2016 · Apt 2NDFL

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling. in the bathroom located at apt 2ndfl, 2nd story

    Apr 29, 2016 · Apt 2NDFL

    Open — Nov sent out
  • A

    Trace and repair the source and abate the nuisance consisting of mold ... and mildew on tile wall. in the bathroom located at apt 2ndfl, 2nd story

    Apr 29, 2016 · Apt 2NDFL

    Open — Nov sent out
Show 4 more ↓
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2ndfl, 2nd story

    Apr 29, 2016 · Apt 2NDFL

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color plaster ceiling at vestibule 1sty public hall.

    Apr 29, 2016

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department walls and ceiling at vestibule 1sty public hall.

    Apr 29, 2016

    Open — Nov sent out
  • B

    Replace with new the broken or defective wood door front entrance to building 1sty

    Apr 29, 2016

    Open — Nov sent out

DOB building violations · 1

  • Construction other optional

    Work w/out permit. at cellar erected full hgt partitions. installed wa ter/waste lines and gas line

    Jul 11, 2016

    Vw-violation work without permit - active

ECB violations · 3

  • Class - 2

    Work w/o a permit. at cellar level installed water/waste lines for a 3pc bathroom (toilet,sink & shower) and a residential sink w/o permits.remedy: obtain permit or restore premises to prior legal conditions.

    Feb 11, 2014

    Resolve
  • Non-hazardous

    Work w/o a work permit. work noted:at the cellar level installed water & waste lines for a 3pc bathrm.sink,toilet,shower & res.sink.remedy:comply w/d.o.b. order. restore to the legal original condition.

    Apr 13, 2007

    Resolve
  • Hazardous

    Work w/o a permit.work noted:at cellar level installed water & waste line for a 3pc bathroom(sink,toilet,shower)& residential sink.remedy:obtain permit or restore to prior legal conditions

    Dec 21, 2006

    Resolve

Complaints

  • Heat/hot water

    Apartment only

    Apr 18, 2016 · Apt 2NDFL

    Close
  • Heat/hot water

    Apartment only

    Apr 14, 2016 · Apt 2NDFL

    Close
  • Paint/plaster

    Ceiling

    Apr 14, 2016 · Apt 2NDFL

    Close
  • Appliance

    Electric/gas range

    Apr 14, 2016 · Apt 2NDFL

    Close
  • Heat/hot water

    Apartment only

    Apr 14, 2016 · Apt 2NDFL

    Close
  • Flooring/stairs

    Floor

    Apr 14, 2016 · Apt 2NDFL

    Close
  • Flooring/stairs

    Floor

    Apr 14, 2016 · Apt 2NDFL

    Close
  • Plumbing

    Basin/sink

    Apr 14, 2016 · Apt 2NDFL

    Close
  • Plumbing

    Basin/sink

    Apr 14, 2016 · Apt 2NDFL

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Two-family home (B3)
Year built
1920
Floors
2.5
Residential units
2
Building area
1,556 ft²
Lot area
4,000 ft²
Zoning
R2A
Community board
411
Council district
19
Block / lot
6206 / 33
Assessed value
$72,000
Landmark / historic district
No

Questions about 40-08 204 Street

Who owns 40-08 204 Street?

The owner of record in NYC Department of City Planning PLUTO data is Kim, Hae Yong.

Does 40-08 204 Street have violations?

Yes. NYC HPD has recorded 14 housing violations at this property.

Is 40-08 204 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 40-08 204 Street built?

City records list 1920 as the year it was built.

How many apartments are in 40-08 204 Street?

It has 2 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.