43-08 162 Street is a mixed residential and retail building built in 2024 in Queens, 11358. It has 2 residential units across 3 floors. The owner of record is Zheng's Realty LLC. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
1
ECB violations
16
HPD complaints
0

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 1

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 24, 2024

    Dob violation - dismissed

ECB violations · 16

  • Class - 1

    New building permit q08041733 active site cp present upon inspection noted: a partial swo exist since 11-20-23 . work continue at exposure 2, 2 floor added after pswo issued , for comply #4943576 upon inspecti

    Jan 15, 2024

    Resolve
  • Class - 2

    New 3 story building . active site and permit.cp present upon inspection observed boom delivering cmu blocks to building roof ,noted street operations performing without flag person to control pedestrian and

    Jan 15, 2024 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to maintain/display on site documents required by bc chapter 33. . at time of inspection observed: active site and permit cp present upon request for ssp none was provided contrary to bc 3301.7 (2014 co

    Jan 15, 2024 · Penalty $625

    Resolve
  • Class - 1

    New building permit q08041733 active site cp present upon inspection noted: a partial swo exist since 11-20-23 . , work continue at exposure 4, 2 floor added after pswo issued , reinspection denied on 12-09-23

    Jan 15, 2024 · Penalty $5,000

    Resolve
  • Class - 1

    New 3 story building. active site and permit . at time of inspection observed 5 cmu trades working on roof level none of them used a hard hat contrary to building code stop all work under job q08041733

    Jan 15, 2024

    Resolve
  • Class - 1

    Observed proposed 3 str bldg. at 2nd fl, with the exp#4 exterior wall built to a height of 16-20ft, and with loose material (bricks) left on the ledge of the wall, while no protection was in place for the exp#4

    Nov 20, 2023

    Resolve
  • Class - 2

    Observed 3 str bldg. at 2nd fl with a portion of the foundation wall at cel lvl cut to provide support for a i-beam and a lintel (tack welded together)- upon review of the dob-approved structural drawings, i fo

    Nov 20, 2023

    Resolve
  • Class - 2

    Observed 3 str bldg. at 2nd fl with a portion of the foundation wall at cel lvl cut/chipped to provide support for a i-beam and a lintel (tack welded together and placed on top of loose bricks)- upon review of

    Nov 20, 2023

    Resolve
  • Class - 2

    Observed a proposed 3 str new building at the 2nd fl, with an adjoining new bldg. on the same site being built simultaneously (#q08041733-i1- same proposed ht/str, at same current lvl). upon review of the cs lo

    Nov 20, 2023 · Penalty $5,000

    Resolve
  • Class - 1

    Observed proposed 3 str bldg. at 2nd fl, with the exp#2 exterior wall built to a height of 16-20ft, and with loose material and tools left on the ledge of the wall, while no protection was in place for the exp#

    Nov 20, 2023

    Resolve
Show 6 more ↓
  • Non-hazardous

    Work w/o a permit.work noted:at front-an awning was installed approx 25'x 6' & approx 10' above grade.printed on the awning:looseleaf law publications inc,43-08 est.1967 359-5559.remedy:obtain a permit

    Mar 3, 2007

    Resolve
  • Non-hazardous

    Work without a permit-news partitions were installed to create one bathroom + several other rooms.also alterations to structure bean at cei-ling.all work took place in the basmt of this address.business is a dr

    Jun 7, 1996

    Resolve
  • Non-hazardous

    Work without a permit:installing waste and supply lines for new bathroom at bamt of said address.a search of dept records shown no permit issued for said work.remedy:stop all work obtain necessary permit or r

    Jun 7, 1996

    Resolve
  • Non-hazardous

    Work without a permit.removing electrical wire + fixture at basmt of said address a search of dept records shown that no permit was issued for said work.remedy:stop all work obtain necessary permit and call fo

    Jun 7, 1996

    Resolve
  • Non-hazardous

    Occupancy contrary to bldg dept. records change of use from church to nursery school in rear without valid cert. of occupancy. remedy: obtain valid certificate of occupancy forthwith

    Jul 29, 1992 · Penalty $175

    Resolve
  • Non-hazardous

    Occupancy contrary to that allowed by building department records fromrear yard to storage of (2)two trailers approx 10ft wide x 20ft long+ 10ft wide x 40ft long. remedy discontinue illegal use.

    Mar 25, 1992 · Penalty $285

    Resolve

Complaints

No HPD complaints in our records

Complaint data is still being backfilled from NYC Open Data.

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Mixed residential and retail building (S2)
Year built
2024
Floors
3
Residential units
2
Building area
3,360 ft²
Lot area
2,500 ft²
Zoning
R5B
Community board
407
Council district
20
Block / lot
5419 / 37
Assessed value
$103,380
Landmark / historic district
No

Questions about 43-08 162 Street

Who owns 43-08 162 Street?

The owner of record in NYC Department of City Planning PLUTO data is Zheng's Realty LLC.

Does 43-08 162 Street have violations?

NYC HPD has no housing violations on record for this property.

Is 43-08 162 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 43-08 162 Street built?

City records list 2024 as the year it was built.

How many apartments are in 43-08 162 Street?

It has 2 residential units and 3 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.