140-18 Cherry Avenue
Queens, NY 11355BBL 4-05192-0041Map
Owner of record: 14018 Chang Rong LLC
140-18 Cherry Avenue is an elevator apartment building built in 2022 in Queens, 11355. It has 10 residential units across 6 floors. The owner of record is 14018 Chang Rong LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 7
- ECB violations
- 37
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 7
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 11, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 11, 2024
Dob violation - active - Construction other optional
Special inspector, alberto roman, pe surrendered all filing privileges. borough commissioner orders stop work order for job #421513357.
Aug 17, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 5, 2020
Dob violation - dismissed
ECB violations · 37
- Class - 2
3303.3 atoi of 6 story new building at roof level, building approximately 11,687 sq feet. site closed & there were no construction activity. upon shouting at perimeter and banging on fence and door to alert wat
Sep 26, 2026 · Penalty $2,500
Active - Class - 2
@active site me&sites personnel locked eyes through job fence openings,&as i made my presence known by knocking on fence+locked site access,calling/shouting "department of building/dob"for inspection access, at
Sep 25, 2026 · Penalty $2,500
Active - Class - 2
Observed sidewalk snow not cleaned on time, creating a slipping hazard for pedestrians (bc 3303.4.1) - gc #614093clean up snow from sidewalk
Feb 24, 2026 · Penalty $6,250
Active - Class - 2
Observed sidewalk shed had uncovered bolts and dangling loose pieces, creating scratching hazard for pedestrians (bc3307.6.5.6) - gc #614093maintain sws, cover sharp edges
Feb 24, 2026 · Penalty $10,000
Active - Class - 2
At time of inspection, i observed safety netting to supported scaffold at exposure #1 was not maintain as per code section bc 3314.1./ maintain scaffold.
Mar 11, 2025 · Penalty $10,000
Active - Class - 2
3314.3.4-observed sidewalk shed w/ pipe scaffold exp@ 1 on top of sidewalk shed deck, no loads-imposed letter for sidewalk shed.stop all work at exp 1 use of pipe scaffold .remedy: provide loads imposed letter
Sep 30, 2024
Resolve - Class - 2
Observed supported pipe scaffold erected installed exp@ 3 w/ make-shift connections between scaffolds, cuts frames missing cross-braces at base for stabilization & attached to structure of building.stop all wo
Sep 30, 2024
Resolve - Class - 1
Observed missing protection for adjacent properties , exp @ 1 & 4 missing overhead and roof protection, exp @ 3 & 4 missing window protection while unfinished construction operations. missing protection creates
Sep 30, 2024 · Penalty $25,000
Active - Class - 1
3309.1-observed missing protection for adjacent properties exp @ 2 missing roof protection, exp @ 1 & 4 missing overhead and roof protection, exp @ 3 & 4 missing window protection while unfinished construction
Sep 30, 2024
Resolve - Class - 2
Observed supported pipe scaffold erected installed exp@ 3 w/ make-shift connections between scaffolds, cuts frames missing cross-braces at base for stabilization & attached to structure of building.stop all wo
Sep 30, 2024 · Penalty $625
Resolve
Show 27 more ↓
- Class - 2
During my inspection of a 6story nb, construction in progress at the 6th floor, observed supported scaffolds erected @ exp.#1&3, supp. scaffold at exp.#1 had 2 independent towers erected , while 3 connected wer
Feb 20, 2024 · Penalty $6,250
Active - Class - 2
Observed construction fence in place at exp#1, upon review the department records (bis & dob now) observed that permit# 421513357 to install construction fence expired on 9/13/2023 and has not been renewed.
Sep 21, 2023 · Penalty $3,125
Resolve - Class - 1
No protection of roof+skylights. observe site operations above exposure#4 adjoining property 140-14 cherry ave rear roof & skylights while no protection of roof+skylight in place creating hazardous conditions t
Jan 26, 2023 · Penalty $2,500
Resolve - Class - 1
Fail to safeguard adjoining properties exposure#2 140-20&exposure#4 140-14 cherry ave. observe sites construction operations taken and towering over above properties rear yard (exposure#2) and balconies(exposur
Jan 26, 2023 · Penalty $625
Resolve - Class - 1
No work or storage zone barrier. observe construction operations for site occurring adjacent to sidewalk shed with no work or storage zone barrier in place to protect the pedestrian actively passing through wit
Jan 26, 2023 · Penalty $6,250
Resolve - Class - 2
At time of inspection at an active jobsite it was observed coldform steel is contrary to approved plan,missing 2x16 inches strap top & bottom details on page s-006.00,also no manufacturer details on site and no
Jan 23, 2023
Resolve - Class - 2
At time of inspection at an active jobsite it was observed upon request no side walk shed maintenance log and letter of 6 months reinspection available or presented contrary to code.provide sidewalk shed mainte
Jan 23, 2023
Resolve - Class - 2
28-116.2.3 failure to provide an adequate inspection program tr3 lightweight concrete design mix.as noted at time of inspection at an activeconstruction site,failure to provide and file with dob tr3 concrete de
Nov 29, 2022 · Penalty $625
Resolve - Class - 2
At time of inspection on an active proposed 6 story nb jobsite i observed numerous unsafe conditions not logged in the cs logbook - missing documents for temporary platforms, fire extinguishers not maintained,
Nov 2, 2022 · Penalty $5,000
Resolve - Class - 1
At time of inspection on an active proposed 6 story nb jobsite - when asking the designated competent person on site to provide the following required on site documents none could be provided: 1.)sidewalk shed
Nov 2, 2022 · Penalty $2,530
Resolve - Class - 2
At time of inspection on an active proposed 6 story nb jobsite i observed a sidewalk shed installed at exp.1 - observed no sidewalk shed parapet panel installed as required. the sidewalk shed parapet panel info
Nov 2, 2022 · Penalty $1,280
Resolve - Class - 1
At time of inspection on an active proposed 6 story nb jobsite - i observed active hotworks taking place - when asking for the firewatch/guard -none could be provided. when inspecting the fire extinguishers on
Nov 2, 2022 · Penalty $2,530
Resolve - Class - 2
Work without a permit(construction plywood fence permit expired).as noted:at time of inspection construction site was closed.i observed construction plywood fence permit has expired on 04/06/2022 permit#4215133
May 20, 2022 · Penalty $3,125
Resolve - Class - 2
Jobsite plywood construction fence not pursuant to subsection.as notedat time of inspection construction site was closed.observed at exp2 adjoining new building construction site.plywood construction fence lean
Feb 25, 2022 · Penalty $2,500
Resolve - Class - 2
Documents to be kept onsite/failure to maintain or display documents required by chapter 33-foundation phase.at time of inspection at a 6 story new building,i observed approx 4 workers onsite installing mcu blo
Aug 24, 2021
Resolve - Class - 2
3301.13.1 work contrary to site safety plan.at time of inspection at a6 story new building,i observed on an active jobsite approx 4 workers onsite at cellar level installing mcu blocks in elevator shaft and mix
Aug 24, 2021
Resolve - Class - 2
3304.8 drainage/removal of water on foundation work phase.at time of inspection at a 6 story new building,i observed on an active jobsite workers installing mcu blocks,mixing content and cutting blocks with ele
Aug 24, 2021
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements.at time of inspection at a 6 story new building,i observed poor housekeeping throughout the cellar level of the jobsite,material,debris and gar
Aug 24, 2021
Resolve - Class - 1
Sec. bc3303.4.1.1 failure to maintain areas used by the public. note: at time of inspection of proposed 6 sty new bldg at the excavation/foundation phase,i observed that in the front of the jobsite sidewalk con
Jul 22, 2021 · Penalty $6,250
Resolve - Class - 2
Work w/o a permit(construction plywood fence permit expired). as noted:at time of inspection const site was closed. i observed const plywoodfence permit has expired on 11/30/2020 permit#421513357-01-eq-fn. reme
Feb 12, 2021 · Penalty $625
Resolve - Class - 2
Job site plywood construction fence not pursuant to subsection.as noted:at time of inspection construction site was close,construction plywood fence permit an active.observed at expo 4(rear side) missing plywoo
Aug 20, 2020
Resolve - Class - 1
Failure to notify the dept proir to the commencement of earthwork. at time of inspection at an excavation job site,upon reviewing bis,i observed the contractor did not notify the dept prior to the commencement
Dec 23, 2019 · Penalty $6,250
Resolve - Class - 1
Sec. 3303.14.2 failure to provide adequate drainage to prevent accumulation at construction,demolition or excavation site. at time of inspection at an excavatuon site,i observed excessive water in excavation
Dec 23, 2019 · Penalty $6,250
Resolve - Class - 1
Construction superintendent failed to perform duties per code or pre- ent. observed: at time of inspection there were 5 chinese male workers working on individual floors and there wasnt a superintendent or com-
Dec 16, 2019
Resolve - Class - 1
Failure to provide protection @side of excavation & support excavationas noted: @time of inspection jobs ite was not active & construction gate door open. 140-20 cherry ave, adjoining new building an active
Nov 8, 2019 · Penalty $12,500
Resolve - Class - 2
Job site plywood construction fence not pursuant to subsection. as noted: @time of inspection construction site was closed. observed @exp#2 plywood construction fence missing and exp#4(rear side) 3 plywood fall
Nov 8, 2019 · Penalty $2,500
Resolve - Class - 2
Occupancy contrary to that allowed by the cofo or bldg dept records.dob's records indicate residence as 2family dwelling.illegal occupancy noted:@1st flr;converted to worship house.rem:discontinue illegal use o
Oct 18, 2016 · Penalty $1,200
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (DB)
- Year built
- 2022
- Floors
- 6
- Residential units
- 10
- Building area
- 9,497 ft²
- Lot area
- 2,800 ft²
- Zoning
- R7B
- Community board
- 407
- Council district
- 20
- Block / lot
- 5192 / 41
- Assessed value
- $499,950
- Landmark / historic district
- No
Questions about 140-18 Cherry Avenue
Who owns 140-18 Cherry Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 14018 Chang Rong LLC.
Does 140-18 Cherry Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 140-18 Cherry Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 140-18 Cherry Avenue built?
City records list 2022 as the year it was built.
How many apartments are in 140-18 Cherry Avenue?
It has 10 residential units and 11 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.