roofy

138-10 Franklin Avenue

Queens, NY 11355BBL 4-05137-0055Map

Owner of record: Carlyle Towers Coop INC

138-10 Franklin Avenue is an elevator apartment building built in 1961 in Queens, 11355. It has 194 residential units across 15 floors. The owner of record is Carlyle Towers Coop INC. HPD has recorded 13 housing violations here, most recently on May 7, 2026. 5 of the 13 most recent violations are still open.

HPD violations
13
DOB violations
43
ECB violations
35
HPD complaints
72

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation May 7, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 13

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 7, 2026

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 24, 2023

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective door at the west wall at public hall at compactor closet, 10th story

    Feb 4, 2023

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Feb 4, 2023

    Open — Nov sent out
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Feb 4, 2023

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall

    Feb 4, 2023

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall

    Feb 4, 2023

    Open — Nov sent out
  • C

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 7l, 7th story, 1st apartment from west at north

    Feb 8, 2016 · Apt 7L

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 16n, 16th story, 3rd apartment from south at west

    Nov 2, 2012 · Apt 16N

    Closed — Violation dismissed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 16n, 16th story, 3rd apartment from south at west

    Nov 2, 2012 · Apt 16N

    Closed — Violation dismissed
Show 3 more ↓
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 16n, 16th story, 3rd apartment from south at west

    Nov 2, 2012 · Apt 16N

    Closed — Violation dismissed
  • C

    Repair the roof so that it will not leak front room ceiling 16 sty northwest apt 16b. , section '' ''

    Apr 29, 1997 · Apt 16B

    Closed — Violation dismissed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color front room ceiling 16 sty northwest apt 16b. , section '' ''

    Apr 29, 1997 · Apt 16B

    Closed — Violation dismissed

DOB building violations · 43

  • Construction other optional

    Boro commissioner has ordered work stopped for# 440606747 due to superintendent of construction withdrawal. site is closed, unable to gain access to see % of work.

    Aug 20, 2025

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 23, 2024

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 23, 2024

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2023

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 15, 2023

    Dob violation - dismissed
  • Construction other optional

    Borough commissioner has ordered work stopped under job # 440606747 due to applicant withdrawal.

    Mar 7, 2023

    Dob violation - dismissed
  • Hazardous condition (facade) facade required

    Cycle 9b unsafe report filed

    Feb 20, 2023

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 3, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 10, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 10, 2019

    Dob violation - resolved
Show 33 more ↓
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 16, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 16, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 16, 2018

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 14, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 14, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 19, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 19, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 29, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 29, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 14, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 14, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 19, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 19, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 15, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 15, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 27, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 25, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 25, 2007

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Apr 2, 2007

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 26, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 26, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 7, 2003

    Dob violation - resolved
  • Facade facade optional

    Ll10/80-local law 10/80 - facade facade optional

    Feb 22, 2000

    Dob violation - dismissed
  • Facade facade optional

    Ll10/80-local law 10/80 - facade facade optional

    Jan 21, 1997

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jan 21, 1997

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 30, 1989

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 30, 1989

    Dob violation - resolved

ECB violations · 35

  • Class - 2

    I observed pedestrian protection (sidewalk shed) installed at exposures 1,2&3 contrary to codes: 3307.6.4.11 color. i observed blue bracing @ expos 2, blue & red kickers @ expos 3, as well as yellow clamps inst

    Oct 16, 2024 · Penalty $2,400

    Resolve
  • Class - 1

    I observed 2 suspended scaffolds installed at exposure 1 with no sidewalk shed installed contrary to code 3307.6.2 where required. facade repairs over 40ft a shed is required at half the distance of the height

    Oct 16, 2024 · Penalty $2,400

    Resolve
  • Class - 2

    I observed pedestrian protection (sidewalk shed) installed at exposures 1,2&3 inadequately maintained contrary to code 3307.6.5.1 safe condition. i observed multiple rotted/damaged mudsills. rusted & deteriora

    Oct 16, 2024 · Penalty $2,400

    Resolve
  • Class - 1

    Upon inspection of a 15 story facade repair jobsite i observed 2 suspended scaffolds hanging over main entry to building at exposure 2 with no overhead protection installed over pathway to protect pedestrians f

    Oct 16, 2024 · Penalty $10,000

    Resolve
  • Class - 2

    Upon inspection of a 15 story facade repair jobsite i observed a damaged suspended scaffold platform fully installed at exposure 1 contrary to code 3314.4.4.1 safe working order. cut/modified vertical support p

    Oct 16, 2024 · Penalty $2,500

    Resolve
  • Class - 2

    Upon inspection of a non-active 20 story facade alt construction site i observed a sidewalk shed installed at exposures 1,2&3 contrary to code 3301.9.2 - where a sidewalk shed is installed, a sidewalk shed para

    Sep 16, 2024 · Penalty $3,125

    Resolve
  • Class - 2

    Pedestrian protection (sidewalk shed) installed at expos 1,2&3 contrary to codes 3307.6.4.7- minimum 8ft height not maintained at pathway. pipe set at height of approx. 7ft spanning across pedestrian pathway a

    Sep 16, 2024 · Penalty $2,400

    Resolve
  • Class - 2

    Upon inspection of an active 15 story alt construction site i observed suspended scaffold in use at exposure 1 and 4. i asked on site workers to speak to a supervisor. a worker proceeded to call one who was off

    Jun 4, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    E.c.b violation issued for work without a permit but file on 4/09/2024 yet not approved ,observed construction work at cellar level garage at of time of inspection approx 60 feet replacing existing concrete wal

    Apr 16, 2024 · Penalty $625

    Resolve
  • Class - 2

    //1rcny-1041-20(k)-certificate of fitness//at the time of my inspection of active job site - suspended scaffold in use uppon asking workers using scaffold (ranjodh singh and sukhjinder singh) for certificate of

    Feb 14, 2024

    Resolve
Show 25 more ↓
  • Class - 2

    Active job site observed outrigger beams suspended scaffold installed contrary to plans-beam set up should be 3' outreach and 13' to counterweights-installed 11' to counterweights,using 1500lb motors not specif

    Feb 14, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    Active job site-uppon asking for pull test,pre/post instalation letter,details for angles,motor service reports-not provided (provided next day)manufacturing specs for meams and insulation under planks of outri

    Feb 14, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    At the time of my inspection of active job site -suspended scaffold in use- uppon asking for foreman on site-worker(mohammad majid) stating that he is foreman on site -he did not possess a dob issued foreman ca

    Feb 14, 2024 · Penalty $1,250

    Resolve
  • Class - 1

    Fail to maintain building elements-supported scaffold obstruct exterior fdny standpipe connection bc3303.9.@active 15 story facade repair site observe supported scaffold erected from grade up to roof level with

    Aug 9, 2023 · Penalty $2,500

    Resolve
  • Class - 1

    08/17/21 site safety plan:ssp-210.00+310.00.@15 story facade&roof repair site observe active use of supported scaffold in place up to roof level towering over expsoure#4 school(ps244q) active playground not con

    Aug 9, 2023 · Penalty $6,250

    Resolve
  • Class - 2

    Upon inspection of a facade repair jobsite i observed supported scaffold in use installed at exposure 4 approx. 130ft in height. after inspecting the scaffold and verifying if workers were qualified with 4 hour

    Aug 2, 2023 · Penalty $1,250

    Resolve
  • Class - 2

    Up inspection of an active 15 story facade repair jobsite i observed a sidewalk shed installed at all exposures with no code compliant parapet sign. as per code a sign with the contractor or owner of the sites

    Aug 2, 2023 · Penalty $1,250

    Resolve
  • Class - 2

    Upon inspection was requested to rigger forman :1- suported scaffold periodic inspection letter . 2- suspended scaffold motor manufacturer speciffications . none was provided . provide /maintain on site requir

    Jul 22, 2022 · Penalty $625

    Resolve
  • Class - 1

    Observed :facade work job #440606747 active site upon visual inspection was noted : inadequate suported scaffold ,between ground level and first floor exp 2 using screw jack over a part of supported scaffold c

    Jul 22, 2022 · Penalty $2,500

    Resolve
  • Non-hazardous

    85bb5/59i10/.

    May 2, 2007 · Penalty $180

    Resolve
  • Non-hazardous

    17d06/17h11/38o02/41u15/51k11/55y13/55y02/64x10. 17- hoistway door gibs on "11" fl are loose. 17h- hoistway door gibs on "b,1" flrs are worn. 41- nyc id# missing from controller. 51- replace rouged hoist ropes.

    Apr 25, 2006 · Penalty $180

    Resolve
  • Non-hazardous

    17h11/38o02/41u15/55y13/55y02. 17- hoistway door gibs on "b", 1 flr worn. 41- nyc 10# missing from controller. 55-y-13, 55-y-02 elev. hoist machine is leaking oil, properly seal leak, & clean oil off of machine

    Apr 25, 2006 · Penalty $180

    Resolve
  • Non-hazardous

    50a. 50a)install discharge piping on steam safety valves to a safe area on all three valves.

    Sep 8, 2003 · Penalty $180

    Resolve
  • Non-hazardous

    50a.50a-install discharge piping on steam safety valves to a safe areaon all three boilers.

    Sep 8, 2003 · Penalty $180

    Resolve
  • Hazardous

    Failure to file an amended round five report acceptable to this dept persuant to rule r.c.n.y.32-03b(5),indicating correction of hazardous conditions described in initial ll10/80 report.rem:file an amended repo

    May 4, 2001 · Penalty $1,000

    Resolve
  • Hazardous

    Failure to file an amended round five report acceptable to this department pursuant to rule r.c.n.y. 32-03b(5),indicating correction of hazardous condition described in initial ll10/80 report.remedy:file an ame

    Mar 30, 2001 · Penalty $1,000

    Resolve
  • Hazardous

    Failure to file an amended round five report acceptable to this dept pursuant to rule r.c.n.y.32-03b(5),indicating correction of hazardous conditions described in initial ll10/80 report.rem:file an amended repo

    Jan 26, 2001 · Penalty $400

    Resolve
  • Non-hazardous

    Failure to maintain exterior building wall noted:at north elevation east and west corners 7th and 8th floors-vertical cracking of brick masonry.remedy:provide overhead protection and permits where required and

    Jan 12, 2001 · Penalty $350

    Resolve
  • Hazardous

    Failure to file an amended round 5 report acceptable to this dept.pursuant to rule r.c.n.y.32-03b(5),indicating correction of haz.conditionsdescribed in initial ll10/80 report.remedy:file an amended report foll

    Apr 13, 2000 · Penalty $400

    Resolve
  • Non-hazardous

    Work without a permit. work noted: erecting and maintaining an eight (8') feet high plywood fence on premises without first obtaining a permit. remedy: obtain a fence permit forthwith.

    Aug 19, 1999

    Resolve
  • Hazardous

    Failure to file an amended round four report acceptable to this department pursuant to rule r.c.n.y. 32-03b(5), indicating correction of hazardous conditions described in initial ll10/80 report. remedy: file

    Jun 9, 1997 · Penalty $400

    Resolve
  • Non-hazardous

    74 x repir top of car insp.

    Mar 15, 1997

    Resolve
  • Non-hazardous

    37b,50b,54b,39h,50y,50o,74q,74#, 37 50 +54-b provide proper ground 39 h- recut + regrove traction sheave file app obtain permit and have inspected by this dept before returning to service 50-o clean motor

    Mar 12, 1997 · Penalty $100

    Resolve
  • Non-hazardous

    25# 15b 15m 03o 21l 46m 58o 59o 04x 14l file box & obtain a prmit for new dor operator provide missing dust covers and repair & adjust self closers as needed clean car top shackel restrictors plastic replace

    Sep 7, 1990 · Penalty $435

    Resolve
  • Non-hazardous

    25# 04x 10t 14m 15m 15b 18d 21l 46m 58o 59o 03o 03m file bx obtain a permit for nw door operator door close button mark set screw replace missing dust covers & repair & adjust self closes secure covers shackel

    Sep 7, 1990 · Penalty $435

    Resolve

Complaints

  • Paint/plaster

    Wall

    Oct 16, 2026 · Apt 6N

    Open
  • Unsanitary condition

    Garbage/recycling storage

    Apr 23, 2024 · Apt 10A

    Close
  • Unsanitary condition

    Pests

    Jul 16, 2023 · Apt 12E

    Close
  • Door/window

    Window frame

    Apr 18, 2023 · Apt 7G

    Close
  • Heat/hot water

    Entire building

    Feb 3, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 11, 2022 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Mar 9, 2021 · Apt 9K

    Close
  • Unsanitary condition

    Mold

    Feb 10, 2021 · Apt 529

    Close
  • Water leak

    Slow leak

    Feb 2, 2021 · Apt 529

    Close
  • Door/window

    Window frame

    Feb 2, 2021 · Apt 529

    Close
Show 40 more ↓
  • Unsanitary condition

    Mold

    Feb 2, 2021 · Apt 529

    Close
  • Plumbing

    Water supply

    Dec 16, 2020 · Apt 9K

    Close
  • Plumbing

    Water supply

    Dec 16, 2020 · Apt 9K

    Close
  • Heat/hot water

    Apartment only

    Dec 16, 2020 · Apt 9K

    Close
  • Heat/hot water

    Entire building

    Dec 7, 2020 · Apt 5H

    Close
  • Heat/hot water

    Entire building

    Dec 5, 2020 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 3, 2020 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 2, 2020 · Apt 14D

    Close
  • Heat/hot water

    Entire building

    Oct 28, 2019 · Apt 16F

    Close
  • Heat/hot water

    Entire building

    Oct 28, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 24, 2017 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 21, 2017 · Apt 1J

    Close
  • Heat/hot water

    Entire building

    Feb 2, 2016 · Apt 7L

    Close
  • General

    Cooking gas

    Feb 2, 2016 · Apt 7L

    Close
  • General

    Cooking gas

    Jan 20, 2016 · Apt 7L

    Close
  • Heat/hot water

    Entire building

    Nov 13, 2015 · Apt 14L

    Close
  • Heat/hot water

    Entire building

    Jun 10, 2015 · Apt 6H

    Close
  • Heat/hot water

    Apartment only

    Dec 20, 2014 · Apt 4K

    Close
  • Heat/hot water

    Apartment only

    Nov 19, 2014 · Apt APT14L

    Close
  • Heat/hot water

    Apartment only

    Nov 14, 2014 · Apt 14L

    Close
  • Heat/hot water

    Entire building

    Nov 5, 2014 · Apt 6N

    Close
  • Heat/hot water

    Entire building

    Nov 5, 2014 · Apt 6H

    Close
  • Heat/hot water

    Entire building

    Oct 26, 2014 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Oct 23, 2014 · Apt 8J

    Close
  • Heat/hot water

    Entire building

    Oct 20, 2014 · Apt 14D

    Close
  • Heat/hot water

    Entire building

    Oct 14, 2014 · Apt 8L

    Close
  • Heat/hot water

    Apartment only

    Oct 12, 2014 · Apt 8J

    Close
  • Plumbing

    Water supply

    Jun 17, 2014 · Apt 6H

    Close
  • Heating

    Heat related

    Jan 26, 2014 · Apt NA

    Close
  • Heating

    Heat related

    Jan 26, 2014 · Apt 6D

    Close
  • Heating

    Heat related

    Jan 25, 2014 · Apt 4K

    Close
  • Heating

    Heat related

    Nov 28, 2013 · Apt 6D

    Close
  • Heating

    Heat related

    Mar 14, 2013 · Apt BLDG

    Close
  • Plumbing

    Water-leaks

    Mar 7, 2013 · Apt 6N

    Close
  • Heating

    Heat related

    Jan 26, 2013 · Apt 1C

    Close
  • Heating

    Heat related

    Jan 25, 2013 · Apt NA

    Close
  • Heating

    Heat related

    Jan 23, 2013 · Apt NA

    Close
  • Plumbing

    Water-leaks

    Dec 7, 2012 · Apt 6N

    Close
  • Heating

    Heat related

    Dec 1, 2012 · Apt NA

    Close
  • Heating

    Heat related

    Dec 1, 2012 · Apt NA

    Close

Sales history

DatePriceTypeUnits
Sep 10, 2026$610,000Coops - elevator apartments—
Sep 1, 2026$563,100Coops - elevator apartments—
Jul 1, 2026$468,100Coops - elevator apartments—
Jun 18, 2026$475,000Coops - elevator apartments—
May 8, 2026Non-market transferCoops - elevator apartments—
Apr 10, 2026Non-market transferCoops - elevator apartments—
Jan 9, 2026$417,216Coops - elevator apartments—
Dec 15, 2025$479,000Coops - elevator apartments—

Building details

Building type
Elevator apartment building (D4)
Year built
1961
Floors
15
Residential units
194
Building area
226,160 ft²
Lot area
56,588 ft²
Zoning
R6
Community board
407
Council district
20
Block / lot
5137 / 55
Assessed value
$10,507,500
Landmark / historic district
No

HPD registration #420028, last renewed Sep 29, 2025.

Questions about 138-10 Franklin Avenue

Who owns 138-10 Franklin Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Carlyle Towers Coop INC.

Does 138-10 Franklin Avenue have violations?

Yes. NYC HPD has recorded 13 housing violations at this property.

Is 138-10 Franklin Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 138-10 Franklin Avenue built?

City records list 1961 as the year it was built.

How many apartments are in 138-10 Franklin Avenue?

It has 194 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.