133-36 Sanford Avenue
Queens, NY 11355BBL 4-05121-7501Map
Owner of record: Unavailable Owner
133-36 Sanford Avenue is a condominium built in 2005 in Queens, 11355. It has 99 residential units across 19 floors. The owner of record is Unavailable Owner. HPD has recorded 33 housing violations here, most recently on May 14, 2026. 16 of the 33 most recent violations are still open.
- HPD violations
- 33
- DOB violations
- 29
- ECB violations
- 36
- HPD complaints
- 81
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 33
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 11b, 11th story, 2nd apartment from west at north
May 14, 2026 · Apt 11B
Closed — Violation dismissed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the 2nd bathroom from east located at apt 11b, 11th story, 2nd apartment from west at north
May 14, 2026 · Apt 11B
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 11b, 11th story, 2nd apartment from west at north
May 14, 2026 · Apt 11B
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 11b, 11th story, 2nd apartment from west at north
May 14, 2026 · Apt 11B
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 13, 2025
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing consisting of kick down door stopper installed at building entrance door at public hall, 1st story
Oct 23, 2023
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 30, 2023
Closed — Violation dismissed - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures throughout in the entire apartment located at apt 5g, 5th story, 4th apartment from east at south
Oct 18, 2022 · Apt 5G
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 9, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 9, 2022
Closed — Violation dismissed
Show 23 more ↓
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 19, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 19, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 4, 2019
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Apr 24, 2019
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Apr 24, 2019
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at public hall, 1st story
Apr 24, 2019
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Apr 24, 2019
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system .. at public hall, 1st story
Apr 24, 2019
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Apr 24, 2019
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st story
Apr 24, 2019
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 26, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 8, 2017
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jun 28, 2017
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jun 28, 2017
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Apr 24, 2017
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Apr 24, 2017
Open — Nov sent out - BHazardous
Replace the broken or defective control valve at radiator in the 3rd room from north located at apt 9c, 9th story, 3rd apartment from north at east
Mar 18, 2017 · Apt 9C
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Mar 7, 2017
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Mar 7, 2017
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 28, 2016
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective exhust fan at ceiling in the entire apartment located at apt 19f, 19th story, 3rd apartment from east at south
Mar 3, 2016 · Apt 19F
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 20, 2015
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 4, 2015
Closed — Violation dismissed
DOB building violations · 29
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 5, 2025
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2021
Aug 21, 2022
Dob violation - active - Construction other optional
Failure to maintain exterior bldg facade & appurtenances.-observe on 1/7/20 @ various glass pnl balc.railing missing/damage/broken glass railing spider at various flrs @ expo#1&3 remedy owner to immed retain a nys lic.prof.to evaluate:all glass pnls on balconies & owner to immed.inspect 100%(hand on)prov.eng'r report by 2/8/20
Jan 7, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed
Show 19 more ↓
- Facade safety program facade required
Unsafe report was filed
Oct 4, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 16, 2019
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2018
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2017
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 31, 2017
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 27, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 27, 2016
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Construction other optional
C-construction other optional
May 17, 2012
Dob violation - dismissed - Construction other optional
C-construction other optional
May 9, 2012
Dob violation - dismissed - Construction other optional
C-construction other optional
Feb 16, 2012
Dob violation - dismissed
ECB violations · 36
- Class - 3
Occupancy contrary to that allowed by the certificate of occupancy or buildings department records. gained access by occupant of ph-b. at time of inspection, noted three people utilizing space for 501(c)(3) pub
Jun 23, 2025 · Penalty $500
Active - Class - 2
Failure to submit an acceptable required cycle 9c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #914329. remedy: submit acceptable requ
Apr 8, 2025 · Penalty $2,530
Active - Class - 1
Failure to submit the required parking structure initial observation report for an existing parking structure documenting the conditions of psid#q0002319 by the august 1, 2024 deadline. to date, the department
Oct 1, 2024 · Penalty $2,530
Active - Class - 2
Work without a permit. at time of inspection, observed, at cellar parking area erected full height partitions to create 3 separate rooms without permit., obtain all permits
Jun 20, 2024 · Penalty $1,250
Active - Class - 2
Failure to comply with commissioner's order to file a certificate of correction with the department building.note:at the time of inspection respondent did not comply with previous violation#35538611l issued on
Jul 15, 2020
Resolve - Class - 1
Failure- to provide safety measures such as side walk shed netting fence ect.where required to protect and secure public safety as per 103.04 at the time of inspection responded was not in compliance with previ
Jun 26, 2020 · Penalty $12,500
Resolve - Class - 1
Failure to provide safety measures(sidewalk shed netting etc)where required to protect and secure public safety from documented unsafe facade as per 1rcny 103-04 facade technical report filed unsafe by pe ira o
Jun 2, 2020 · Penalty $12,500
Resolve - Class - 1
Failure to provide safety measures,such as-sidewalk shed netting,fencing,etc.where required to protect & secure public safety from documented unsafe facade as per 1rcny 103-4 facade technical report filed unsaf
Mar 5, 2020
Resolve - Class - 1
Failure to take provide safety measure,such as,sidewalk shes's fence,etc.where required to protect and secure public safety from documented unsafe facade as per 1rcmu-103-04 facade technical report unsafe by pe
Jan 7, 2020 · Penalty $12,500
Resolve - Class - 1
Failure to maintain exterior of building facade and appurtenances.note:at the time of inspection facade observed debris.1-exposure#1observed damage/broken or missing balcony glass panel screww bolt andchor/nut
Jan 7, 2020 · Penalty $6,250
Resolve
Show 26 more ↓
- Class - 1
Failure to maintain exterior building facade & appurtenances. note: @the time of inspection building facade observe defects (1)exp#4 west elevation observe cracks/spalled and chipping bricks/mortar @masonry
Oct 28, 2019 · Penalty $2,500
Resolve - Class - 2
As per class 2 (b265) 28.303.7 failure to file a complete boiler insp as per dob records submit a current bo-9 report.
Jun 27, 2017 · Penalty $1,250
Resolve - Class - 2
As per class (b265) 28.303.7 failure to file a complete boiler insp as per dob records submit a current bo-9 report.
Jun 27, 2017 · Penalty $1,250
Resolve - Class - 1
40v7,99bb5,40x10,2x10,2x10,15m7,70z2,05n10,100b11,71x10,97x10. 40v7- brake maintenance tag; 99bb5-1 year test, 40x10-lighting in machine room, 210-phone inoperative, 2x10-alarm bells inoperative, 15m7-certi
Mar 8, 2017 · Penalty $2,500
Resolve - Class - 2
40v7,60b10,99bb5,40m7,61m7,2x10,2x10,70z2,100b11,12b7,15m7,5n10. 40v7-brake mainteannce tag; 60b10-machine room lighting; 99bb5-one year test expired; 40m7-missing covers; 61m7-disconnects need plugs; 2x10
Mar 8, 2017 · Penalty $1,250
Resolve - Class - 1
3309.10 no protection for adjacent yard: no overhead protection.note: active jobsite in progress,connection of chimney from 133-36 sanford to adjacent bldg extisting masonary chimney @exp#4.there is no overhead
Oct 27, 2015
Resolve - Class - 1
3314.4.3 no record of daily insp of supported scaffold performed by competent person @site.note:active jobsite supported scaffold erected @exp#4 approx 19 stories high.site safety log that yesterday 10/26/15 wo
Oct 27, 2015 · Penalty $1,600
Resolve - Class - 2
Temporary construction equipment on site: expired permit. at time of inspection observed supported pipe scaffold erected at exp#4 of bldg. scaffold is approx 40+ feet in height. seach of dob records show all
May 6, 2015 · Penalty $800
Resolve - Class - 2
97x10,99bb05,97x10-repair & return to service,99bb05-perform & file catagory 1 test.
Dec 12, 2014 · Penalty $500
Resolve - Class - 2
97x10,99bb05,97x10-repair & return to service,99bb05-perform & file catorgry 1 test
Dec 12, 2014 · Penalty $500
Resolve - Class - 1
No record of daily inspection of suspended scaffold performed by authorized person at site. upon inspection of daily suspended scaffold log last entry was 7/26/13 & work in progress at exposure 3 on multipoint
Aug 6, 2013 · Penalty $2,400
Resolve - Class - 1
Failure to have site safety manager present at time of inspection. upon inspection of site work in progress at exterior of bldg using multi pout suspended scaffold caulking windows at exposure 3;at exposure 1 &
Aug 6, 2013 · Penalty $1,200
Resolve - Class - 2
Work does not conform to approved construction documents or amendments. site safety plans at site issued by best squad does not show the erected multi point suspended scaffold on roof & set back/balcony at 1,2,
Aug 6, 2013 · Penalty $500
Resolve - Class - 1
No roof protection. upon inspection observed roof protection missing from roof of adjacent property at exposure 2. 1 story bldg until mechanical unit mounted at roof level. work in progress at 21st fl & scaffol
Aug 6, 2013 · Penalty $2,400
Resolve - Class - 1
New building occupied w/o a valid c of o. new building partially finished under job #401230431 is occupied (partially) from cellar through 15th floor. nb application not signed off & c of o not issued. (note:
May 9, 2012 · Penalty $2,500
Resolve - Class - 1
Sec. 3314.8 except for scaffold platforms 6 feet or less above the ground. the open sides & ends of every scaffold platform shall be provided w/a guard racks system & toe board. noted: at penthouse level,work
Mar 23, 2012 · Penalty $1,600
Resolve - Class - 1
Sec. 3314.9 supported scaffold does not meet code specification. notedscaffold does not meet code specification,at penthouse level,found loose (planking),not tied down at this level,netting loose throughtout at
Mar 23, 2012 · Penalty $1,600
Resolve - Class - 1
New building occupied without a valid cert of occupancy. noted:temporary cofo number #401230431t006 issued at premises on 10-31-11 & expiredon 1-29-12 has not been renew for the occupancy of the building. rem:o
Feb 6, 2012 · Penalty $2,500
Resolve - Class - 2
No record of daily inspection of supported scaffold perfomred by competant person at site.at time of inspec.no daily inspection log book for supported scaffold person when asked.remedy:provide daily inspec.log
Oct 27, 2011 · Penalty $400
Resolve - Class - 1
New building occupied w/o valid cert of occupancy.noted:temp c of o.#401230431t005 issued on 2/22/11 & occupancy of the bldg.also obserbed on flr 7,9,10,13 & 17 to be occupied.this flr is under construction & n
Jun 30, 2011 · Penalty $1,000
Resolve - Class - 2
Owner has failure to comply w/ the comm's order to file a cert of correction w/ the dob for ecb vio #34890656l & dob #120110c07rns07.rem:file a cert of correction.
Jun 30, 2011 · Penalty $800
Resolve - Class - 1
Sec. 3310.3. failure to have site safety plan program as required: noted site safety plan from 2008 does not reflect site conditions - suchas pipe scaffolding at elevation/& not found on flr. remedy: stop all
Jun 30, 2011 · Penalty $800
Resolve - Class - 1
Sec. 3303.10. no tenant protection plan - noted: at flrs 7,9,10,13,17.tenants are occupying apts while apts, hallway walls & ceiling is being renovated & curtain wall glass is being replaced, some apt balconies
Jun 30, 2011 · Penalty $1,600
Resolve - Class - 1
Work does not conform to documentation/design drawing - noted: design drawing for pipe scaffolding at elevation 1 & 2 is required to be covered w/tarp - removal of curtain wall glass has been ongoing w/o tarp
Jun 30, 2011 · Penalty $1,000
Resolve - Class - 1
Nb occupied w/o a valid c of o.current tco for this high-rise dwelling #401230431t003 has expired nearly 8 months ago on 4/12/10.staff @ location indicate premises is almost 'fully occupied'.this nov is marked
Dec 1, 2010 · Penalty $1,000
Resolve - Hazardous
Failure to provdie site safety manager at the time of inspection no site safety mgr. present. remedy: provide site safety mgr as per code.
May 20, 2008 · Penalty $2,000
Resolve
Complaints
- Heat/hot water
Apartment only
May 15, 2026 · Apt 15F
Close - Heat/hot water
Entire building
May 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 12, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
May 11, 2026 · Apt 11B
Close - Heat/hot water
Entire building
May 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 2, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Jul 31, 2025 · Apt 7G
Close - Electric
Outlet/switch
Jul 31, 2025 · Apt 7G
Close - General
Bell/buzzer/intercom
Jul 31, 2025 · Apt 7G
Close
Show 40 more ↓
- Unsanitary condition
Pests
Jul 31, 2025 · Apt 7G
Close - Heat/hot water
Entire building
Feb 14, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 9, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 15, 2023 · Apt 19B
Close - Heat/hot water
Entire building
Oct 22, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 25, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Oct 17, 2022 · Apt 5G
Close - Electric
Power outage
Oct 17, 2022 · Apt 5G
Close - Electric
Power outage
Oct 15, 2022 · Apt 5G
Close - Heat/hot water
Entire building
May 12, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
May 10, 2021 · Apt 19A
Close - Heat/hot water
Entire building
Apr 12, 2021 · Apt 20A
Close - Heat/hot water
Entire building
Oct 31, 2019 · Apt 19F
Close - Heat/hot water
Apartment only
May 2, 2019 · Apt 16D
Close - Heat/hot water
Apartment only
Apr 20, 2019 · Apt 16D
Close - Heat/hot water
Apartment only
Apr 18, 2019 · Apt 16D
Close - Heat/hot water
Apartment only
Apr 7, 2019 · Apt 16D
Close - Heat/hot water
Apartment only
Dec 13, 2017 · Apt 20F
Close - Heat/hot water
Apartment only
Nov 20, 2017 · Apt 15C
Close - Heat/hot water
Apartment only
Nov 20, 2017 · Apt 15C
Close - Heat/hot water
Apartment only
Nov 18, 2017 · Apt 20F
Close - Heat/hot water
Entire building
Jun 22, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
May 7, 2017 · Apt 10E
Close - Heat/hot water
Apartment only
Apr 25, 2017 · Apt 11F
Close - Heat/hot water
Apartment only
Apr 22, 2017 · Apt 11F
Close - Plumbing
Water supply
Mar 22, 2017 · Apt 10E
Close - Heat/hot water
Entire building
Mar 22, 2017 · Apt 10E
Close - Heat/hot water
Apartment only
Mar 15, 2017 · Apt 9C
Close - Heat/hot water
Entire building
Mar 7, 2017 · Apt 9C
Close - Heat/hot water
Apartment only
Mar 5, 2017 · Apt 9C
Close - Heat/hot water
Apartment only
Mar 4, 2017 · Apt 9C
Close - Heat/hot water
Apartment only
Mar 2, 2017 · Apt 9C
Close - Heat/hot water
Entire building
Feb 25, 2017 · Apt 9C
Close - Heat/hot water
Apartment only
Feb 5, 2017 · Apt 20F
Close - Heat/hot water
Apartment only
Jan 23, 2017 · Apt 9C
Close - Heat/hot water
Apartment only
Jan 6, 2017 · Apt 9C
Close - Heat/hot water
Apartment only
Jan 5, 2017 · Apt 9C
Close - Heat/hot water
Entire building
Oct 9, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 9, 2016 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 2005
- Floors
- 19
- Residential units
- 99
- Building area
- 143,801 ft²
- Lot area
- 25,290 ft²
- Zoning
- R6
- Community board
- 407
- Council district
- 20
- Block / lot
- 5121 / 7501
- Assessed value
- $10,876,951
- Landmark / historic district
- No
HPD registration #428544, last renewed Oct 23, 2025.
Questions about 133-36 Sanford Avenue
Who owns 133-36 Sanford Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.
Does 133-36 Sanford Avenue have violations?
Yes. NYC HPD has recorded 33 housing violations at this property.
Is 133-36 Sanford Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 133-36 Sanford Avenue built?
City records list 2005 as the year it was built.
How many apartments are in 133-36 Sanford Avenue?
It has 99 residential units and 101 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.