roofy

132-51 41 Road

Queens, NY 11355BBL 4-05039-0040Map

Owner of record: Wts41 LLC

132-51 41 Road is an elevator apartment building built in 2025 in Queens, 11355. It has 10 residential units across 6 floors. The owner of record is Wts41 LLC. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
0
ECB violations
25
HPD complaints
0

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 0

No DOB violations on record

ECB violations · 25

  • Class - 2

    3301.7; obs active proposed 6 story nb with sws & const. fence installed @ expo 1 with c-hook sc installation. c-hook installation was removed when roof level was reached. c-clamps were seen installed on parape

    Aug 26, 2026 · Penalty $1,250

    Active
  • Class - 2

    Observed : site closed upon inspection check sws & fence permit q01299332, q00375372, and found both expired on 07-05-26 & 05/07/2026, contrary to building code

    Jul 7, 2026

    Resolve
  • Class - 2

    All sliding doors were installed with u-factory 0.28 contrary to architectural drawing and en drawing that indicate u-factor 0.27, conform work to approved construction documents/amendments; contact via email:

    May 15, 2026

    Resolve
  • Class - 2

    Observed suspended scaffolding at exposure #1 (front) and exposure #4 (right side) installed using c-hooks with parapet clamps. upon research through dob now system, notification was given for installation of s

    May 11, 2026 · Penalty $2,500

    Resolve
  • Class - 2

    Suspended scaffolding at exposure #1 (front) and exposure #4 (right side) installed using c-hooks and parapet clamps. plans provided for suspended scaffold show proper installation with c-hooks on parapet. upon

    May 11, 2026 · Penalty $2,500

    Resolve
  • Class - 2

    Observed with competent person on proposed 6-story building, container on the street filled with debris not enclosed around to protect the public from the sidewalk and roadway. reference 2022 building code (330

    May 9, 2026 · Penalty $2,500

    Resolve
  • Class - 2

    Performed after hour variance sweep on active jobsite for proposed 6-story building. present was the competent person (andy chen) and workers with valid sst cards installing drywall, tiling, and sprinklers. upo

    May 9, 2026 · Penalty $1,250

    Resolve
  • Class - 2

    Observed sws built contrary to plans as per dobrecords. documents provided on site were outdated drawings. sws on site has a 8ft high section & 12ft high section. inner posts to be installed within construction

    Feb 2, 2026

    Resolve
  • Class - 2

    Observed adjacent property protection installed @expo4, upon request for approved design drawings none were provided, catch-alls not shown on ssp. also noted protection installed on neighbors balcony @expo2 w/

    Feb 2, 2026 · Penalty $1,250

    Resolve
  • Class - 2

    Observed active construction site on proposed nb, 6 stories. upon inspection, plastic non fire rated tarps were seen used on openings @all expos from 2thru6flr, for heating purposes. not in accordance with 3303

    Feb 2, 2026 · Penalty $2,500

    Resolve
Show 15 more ↓
  • Class - 2

    Observed active 6story nb. great amount of combustible material &debris stored hazardly on 1stfloor &several floors thruout site. obstructing egress, creating fire & rodent hazard. snow/icy conditions on all se

    Feb 2, 2026

    Resolve
  • Class - 2

    Work not conforming to plans. at time of inspection, contractor used 2" rigid insulation at a r-value of r-10. approved drawings specify rigid insulation at a r-value of r13, conform work to approved constructi

    Jan 23, 2026

    Resolve
  • Class - 2

    Proposed 6 story building. observed jersey barriers on street with active dot permit with large openings and without being interlocked on pinned together, compromising the protection of the public by making the

    Dec 29, 2025 · Penalty $625

    Resolve
  • Class - 2

    Observed sidewalk shed with 2 elevations, upon reviewing approved drawings on crm 1 elevation is 8ft. when an elevation is below 12ft the registered design professional shall include a note in the approved draw

    Dec 29, 2025

    Resolve
  • Class - 2

    At the time of my inspection of active job site upon asking for orientation log book,cs log book(as per competent person construction super was on site 8am) log book not filled out,inadequate site safety plan-s

    Nov 6, 2025 · Penalty $1,250

    Resolve
  • Class - 2

    Bc 3309.1/adjoining property protectionat the time of my inspection observed inadequate/missing adjoining property protection as required -at corner of exp#3/2 missing parapet wall protection-at corner of exp#3

    Nov 6, 2025 · Penalty $2,500

    Resolve
  • Class - 2

    At the time of my inspection observed sidewalk shed at exp#1-not maintained as required(bc3307.6.5.3)-posts/base plates buried in concrete/dirt,broken base plates,posts out of plumb,post not nailed to base plat

    Nov 6, 2025 · Penalty $2,400

    Resolve
  • Class - 2

    Observed sidewalk shed installed at exp#1under application # q01299332(same gc) contrary to plans -as per plans shed shall be 10 feet high-installed 8'/10',posts not installed as per plans ,crossbracing missing

    Nov 6, 2025

    Resolve
  • Class - 2

    At the time of my inspection of active site-i observed working platform with supported scaffold installed at top with big amount of material-upon asking competent person for design drawing for working platform

    Nov 6, 2025 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to maintain/display on site documents required by bc chapter 33. as noted at time of inspection on an active construction site, 6 story new building cmu block placement work on 3rd floor. observed a) st

    Nov 5, 2025 · Penalty $1,250

    Resolve
  • Class - 2

    Observed steel i-beam connected to the foundation via steel plate, with concrete build-up placed after foundation pour to level the beam. approved plans indicate the plate is to sit directly on the foundation.

    Jul 18, 2025

    Resolve
  • Class - 2

    Erected fence on exp#1 with visible deterioration, non construction related signage, missing plexiglass on viewing panels and not maintain part on exp#4. creating a collapse hazard for pedestrians and adjacent

    May 8, 2025 · Penalty $1,000

    Resolve
  • Class - 2

    Job fence.@inactive site observe job fence in place at exposure#1 (41 rd)&#3 with most recent-last issued job fence permit job#q00375372 expired since 10-09-23.for job fence

    Apr 26, 2024 · Penalty $625

    Resolve
  • Class - 2

    Inactive construction of 6 story nb, vacant lot. i observed an excessive amount of debris throughout the whole site piled against the adjoining property at exposure 2. this can cause the potential for rodents a

    Apr 20, 2023

    Resolve
  • Non-hazardous

    Work without permit. work noted at rear built a two story extension approx. 24'h x 16' w x 16' d and a one story extension attached to two story extention approx 12'h x 16'w x 30'l all exterior work completed.

    Mar 4, 2002 · Penalty $250

    Resolve

Complaints

No HPD complaints in our records

Complaint data is still being backfilled from NYC Open Data.

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D6)
Year built
2025
Floors
6
Residential units
10
Building area
13,451 ft²
Lot area
4,224 ft²
Zoning
R6
Community board
407
Council district
20
Block / lot
5039 / 40
Assessed value
$418,050
Landmark / historic district
No

Questions about 132-51 41 Road

Who owns 132-51 41 Road?

The owner of record in NYC Department of City Planning PLUTO data is Wts41 LLC.

Does 132-51 41 Road have violations?

NYC HPD has no housing violations on record for this property.

Is 132-51 41 Road rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 132-51 41 Road built?

City records list 2025 as the year it was built.

How many apartments are in 132-51 41 Road?

It has 10 residential units and 11 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.