132-49 41 Avenue
Queens, NY 11355BBL 4-05037-0091Map
Owner of record: Bdw Realty LLC
132-49 41 Avenue is an elevator apartment building built in 2023 in Queens, 11355. It has 7 residential units across 5 floors. The owner of record is Bdw Realty LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 1
- ECB violations
- 14
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 1
- Construction other optional
Due to damage caused by construction operations at 132-51 41st avenue
Feb 9, 2016
Dob violation - active
ECB violations · 14
- Class - 2
@permitted 5 story new building site observe not 1 single building permit conspicuous posted anywhere around exterior perimeter of exp#1 where gc failed to comply with code 28-105.11 as sites still incomplete/n
Jun 26, 2025
Resolve - Class - 2
Obstruction of street bc3307.2.1.@5story nb site observe sites barriers occupying the street w/lumber connected to tree protection in front of site&i verified the obstruction of street with sites barrier does n
Jun 26, 2025
Resolve - Class - 2
@permitted 5 story nb site observe gc failed to maintain area used by the public ie: sidewalk with cracks&uneven walking surfaces throughout constituting tripping hazard to code bc 3303.4.1 affecting the safety
Jun 26, 2025
Resolve - Class - 1
At inspection, it was observed sidewalk shed completely missing at exposure-1 whereas building not yet completed above 2nd floor exposing public using sidewalk to great danger of being struck from above by cons
Jun 25, 2024 · Penalty $10,030
Resolve - Class - 2
Work without permit-expired. as noted at time of inspection on a construction site that i had no access. observed construction plywood fenceq00531158-1l has expired on 5-4-2024 and on further research more was
May 16, 2024
Resolve - Class - 2
At inspection, it was observed: construction debris that are combustible and not contained all over the 1st floor and also stored against the construction fence coupled with improper storage of construction mat
Apr 8, 2024
Resolve - Class - 2
The general contractor has failed to act in a responsible manner for safety: observed as per bc 3301.1.1 worker on a-frame ladder been used contrary to manufacturers specifications, not opened, his body above t
Apr 8, 2024 · Penalty $2,500
Resolve - Class - 2
Failure to conform work to site safety plan: at inspection, it was observed as per bc 3301.13.1, chrome railing was not protected, protection on the balcony was missing 2" plank in the middle contrary to the ss
Apr 8, 2024 · Penalty $2,500
Resolve - Class - 2
During my inspection of a new 5 story building, construction in progress at the 5th floor, observed workers building exterior cmu walls, observed inadequate roof/coping protection @ exp.#2, approx.: 6ft contrar
Feb 16, 2024
Resolve - Class - 2
While walking up to the 5th fl, i observed the stairway partially blocked by temp platform for supported scaffold erected, , scaffold was erected throughout the floor with missing braces, guardrails, levels not
Feb 16, 2024
Resolve
Show 4 more ↓
- Class - 2
During my inspection of a new 5 story building, construction in progress at the 5th fl, approx 7 workers on-site, i asked if i could see the workers sst cards, 3 workers: xi lin zou, bing lei lin & manuel xum d
Feb 16, 2024
Resolve - Class - 2
On exposure #2,and 4 from 1st until 3rd floor between adjacent building metal stud were installed 1" far from cmu wall contrary to en drawing,com/check and architectural drawing which is 2". on exposure #3, fro
Jan 26, 2024
Resolve - Class - 2
Time of inspection at 5 story new building, i observed construction job site fence not maintained as to code/ subsection ( large amount of graffiti, plywood fence falling apart and loose ) maintain site fence t
Dec 9, 2022
Resolve - Class - 2
Temporary construction equipment on site-expired permit. at the time of inspection,i saw temporary construction equipment fence at site-while doing research for the bis & dob now. the permit#q0051158-11-fn expi
Jul 23, 2021
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 2023
- Floors
- 5
- Residential units
- 7
- Building area
- 7,689 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6
- Community board
- 407
- Council district
- 20
- Block / lot
- 5037 / 91
- Assessed value
- $651,150
- Landmark / historic district
- No
Questions about 132-49 41 Avenue
Who owns 132-49 41 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Bdw Realty LLC.
Does 132-49 41 Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 132-49 41 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 132-49 41 Avenue built?
City records list 2023 as the year it was built.
How many apartments are in 132-49 41 Avenue?
It has 7 residential units and 8 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.