roofy

36-25 Union Street

Queens, NY 11354BBL 4-05010-7502Map

Owner of record: Name Not On File

36-25 Union Street is a condominium built in 1984 in Queens, 11354. It has 63 residential units across 11 floors. The owner of record is Name Not On File. HPD has recorded 44 housing violations here, most recently on August 20, 2026. 23 of the 44 most recent violations are still open.

HPD violations
44
DOB violations
40
ECB violations
2
HPD complaints
36

What to know

Concern
8 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Aug 20, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 44

  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall in the 2nd bathroom from north located at apt 9d, 9th story, 2nd apartment from south at west

    Aug 20, 2026 · Apt 9D

    Open — Civ14 mailed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at apt 9d, 9th story, 2nd apartment from south at west

    Aug 20, 2026 · Apt 9D

    Open — Civ14 mailed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 9d, 9th story, 2nd apartment from south at west

    Aug 20, 2026 · Apt 9D

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak ceiling in the 1st bathroom from north located at apt 2b, 2nd story, 3rd apartment from north at east

    Apr 21, 2026 · Apt 2B

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st bathroom from north located at apt 2b, 2nd story, 3rd apartment from north at east

    Apr 21, 2026 · Apt 2B

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective caulking around bathtub in the 1st bathroom from north located at apt 2b, 2nd story, 3rd apartment from north at east

    Apr 21, 2026 · Apt 2B

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2b, 2nd story, 3rd apartment from north at east

    Apr 21, 2026 · Apt 2B

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2b, 2nd story, 3rd apartment from north at east

    Apr 21, 2026 · Apt 2B

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 2b, 2nd story, 3rd apartment from north at east

    Apr 21, 2026 · Apt 2B

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at fire door at west wall leading to stair a at public hall, basement entrance story

    Feb 15, 2025

    Closed — Violation closed
Show 34 more ↓
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at compactor closet, 11th story

    Feb 15, 2025

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches at 2nd public hall stairs from north, 4th story

    Feb 15, 2025

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing

    Jul 22, 2024

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Jul 22, 2024

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing

    Jul 22, 2024

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.

    Jul 22, 2024

    Open — Nov sent out
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.

    Jul 22, 2024

    Open — Nov sent out
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration the suspended acoustic panels at ceiling at cellar

    Jul 22, 2024

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective latch set at door

    Jul 22, 2024

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective latch at 1st door at east

    Jul 22, 2024

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches

    Jul 22, 2024

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system near mailboxes

    Mar 27, 2024

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.

    Mar 27, 2024

    Open — Nov sent out
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.

    Mar 27, 2024

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at basement story

    Mar 27, 2024

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Mar 27, 2024

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of wheelchair at public hall stairs at north , 7th story

    Jan 18, 2024

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of clothes in garbage bag at public hall stairs at , 7th story

    Jan 18, 2024

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system . missing information on notice at public hall, basement entrance story.

    Jan 18, 2024

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.

    Jan 18, 2024

    Open — Nov sent out
  • C

    Remove device preventing door from being self-closing at kick door stopper at fire door leading from lobby to boiler room at public hall, basement entrance story.

    Jan 18, 2024

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 8f, 8th story, 1st apartment from north at east

    Jan 8, 2024 · Apt 8F

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system boiler room door at cellar at boiler room

    Jan 8, 2024

    Open — Nov sent out
  • C

    Provide an adequate supply of heat for the apartment in the 1st room from north located at apt 9a, 9th story, 2nd apartment from north at east

    Feb 7, 2022 · Apt 9A

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system boiler room door locked at cellar at boiler room

    Feb 7, 2022

    Open — Nov sent out
  • C

    Remove the illegal fastening a double cylinder key operated lock installed at the building entrance door

    Apr 3, 2020

    Closed — Violation closed
  • C

    Remove the illegal fastening a double cylinder key operated lock installed at the building entrance door.

    Feb 14, 2020

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Feb 14, 2020

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story

    Feb 14, 2020

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Feb 14, 2020

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 9e, 9th story

    Jan 31, 2019 · Apt 9E

    Closed — Violation closed
  • A

    Properly repair the broken or defective the ventilation system in the bathroom located at apt 9e, 9th story

    Jan 31, 2019 · Apt 9E

    Closed — Violation dismissed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 9e, 9th story

    Jan 31, 2019 · Apt 9E

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 9e, 9th story

    Jan 31, 2019 · Apt 9E

    Closed — Violation dismissed

DOB building violations · 40

  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 6, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 6, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 20, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 16, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 16, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 9, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 9, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 9, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 9, 2015

    Dob violation - resolved
Show 30 more ↓
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7b technical report by 08/21/2012

    Aug 30, 2013

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 14, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 14, 2012

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2010 inspection/test

    Dec 13, 2011

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 12, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 12, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 29, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 29, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 13, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 13, 2010

    Dob violation - resolved
  • Construction other optional

    C-construction other optional

    Jul 27, 2009

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Jul 16, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - active
  • Facade facade optional

    Ll1198-local law 11/98 - facade facade optional

    Nov 30, 2007

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 1, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 1, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 23, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 23, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 7, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 7, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 10, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 10, 2005

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 22, 2004

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 22, 2004

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 20, 2003

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 20, 2003

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Mar 21, 2003

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed

ECB violations · 2

  • Class - 2

    Hoist rope shortening

    Feb 25, 2021

    Resolve
  • Class - 1

    No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. file application, install dlm, and perf

    Feb 25, 2021

    Resolve

Complaints

  • Paint/plaster

    Ceiling

    Aug 13, 2026 · Apt 9D

    Close
  • Water leak

    Slow leak

    Aug 13, 2026 · Apt 9D

    Close
  • Water leak

    Damp spot

    Mar 20, 2026 · Apt 2B

    Close
  • Unsanitary condition

    Pests

    Mar 20, 2026 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Jan 28, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 13, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 27, 2024 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Jul 20, 2024 · Apt 5E

    Close
  • Heat/hot water

    Entire building

    Mar 27, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 17, 2024 · Apt 3B

    Close
Show 26 more ↓
  • Heat/hot water

    Entire building

    Jan 17, 2024 · Apt 7F

    Close
  • Heat/hot water

    Entire building

    Jan 16, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 6, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 5, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 4, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 4, 2022 · Apt BLDG

    Close
  • Electric

    Power outage

    Feb 4, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 24, 2022 · Apt 9B

    Close
  • Heat/hot water

    Entire building

    Jan 21, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 16, 2020 · Apt 1C

    Close
  • Heat/hot water

    Apartment only

    Dec 16, 2020 · Apt 1C

    Close
  • Heat/hot water

    Entire building

    Feb 12, 2020 · Apt 11D

    Close
  • Heat/hot water

    Entire building

    Jan 21, 2020 · Apt 11D

    Close
  • Heat/hot water

    Apartment only

    Nov 26, 2019 · Apt 1C

    Close
  • Heat/hot water

    Apartment only

    Nov 26, 2019 · Apt 1C

    Close
  • Heat/hot water

    Apartment only

    Nov 25, 2019 · Apt 1C

    Close
  • Heat/hot water

    Entire building

    Nov 24, 2019 · Apt 1C

    Close
  • Heat/hot water

    Apartment only

    Nov 24, 2019 · Apt 1C

    Close
  • Heat/hot water

    Apartment only

    Nov 23, 2019 · Apt 1C

    Close
  • Heat/hot water

    Entire building

    Jan 29, 2019 · Apt 9E

    Close
  • Heat/hot water

    Entire building

    Jan 6, 2018 · Apt 2D

    Close
  • Heat/hot water

    Apartment only

    Jan 9, 2015 · Apt PHC

    Close
  • Paint/plaster

    Wall

    Jul 22, 2014 · Apt PHD

    Close
  • Plumbing

    Basin/sink

    Oct 16, 2012 · Apt 11A

    Close
  • Plumbing

    Basin/sink

    Oct 2, 2012 · Apt PHA

    Close
  • General

    Ventilation system

    Oct 2, 2012 · Apt PHA

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Condominium (RM)
Year built
1984
Floors
11
Residential units
63
Building area
60,120 ft²
Lot area
23,814 ft²
Zoning
R6
Community board
407
Council district
20
Block / lot
5010 / 7502
Assessed value
$3,854,736
Landmark / historic district
No

HPD registration #423390, last renewed Jul 16, 2025.

Questions about 36-25 Union Street

Who owns 36-25 Union Street?

The owner of record in NYC Department of City Planning PLUTO data is Name Not On File.

Does 36-25 Union Street have violations?

Yes. NYC HPD has recorded 44 housing violations at this property.

Is 36-25 Union Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 36-25 Union Street built?

City records list 1984 as the year it was built.

How many apartments are in 36-25 Union Street?

It has 63 residential units and 114 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.