136-11 38 Avenue
Queens, NY 11354BBL 4-04978-0076Map
Owner of record: W H Plaza, LLC
136-11 38 Avenue is an elevator apartment building built in 2025 in Queens, 11354. It has 10 residential units. The owner of record is W H Plaza, LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 15
- ECB violations
- 37
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 15
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 30, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 2, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 7, 2024
Dob violation - dismissed - Emergency none
Fully demolish the building and garde site
Jan 24, 2022
Dob violation - dismissed - Emergency none
Full demolition of the building without mechanical means and grade site
Dec 30, 2020
Dob violation - dismissed - Construction other optional
Failure to comply with commish ordr control #303744 (111620feu40701ff) issued on 11/16/2020 for the immediate demoltion of the building under the construction supervsion of pe.no demolition activity observd today (12/30/2020)at the site.comply with commissioner order control #303744 (111620feu40701ff) immediately
Dec 30, 2020
Dob violation - dismissed - Construction other optional
Emerg wrk- 4 alarm fire 11/14/20,2 comm spaces extreme fire dmg.136-11 38 ave part colpse-wd frme roof&2fl.136-13 38 ave was part colpse open web joist framd fls@ 1&2fls.perimeter walls not [email protected] strct comp.ownr immd hire nyspe&contrct-erect t-brd fen.alng 38 ave aprx 20' frm frnt wall-estab colapse zone-full demo.wrk supv/dirct pe.file 2day
Nov 16, 2020
Dob violation - dismissed - Immediate emergency anythingoptional
Seal all accessible openings
Nov 16, 2020
Dob violation - dismissed - Construction other optional
Structure rendered non compliant due to fire. at time of inspection premises suffered significant fire and smoke damage including but not limited to open roof with burnt rafters and open windows exposing interior to outside elements
Nov 14, 2020
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - dismissed
Show 5 more ↓
- Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2013 inspection/test
Oct 31, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 31, 2012
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 31, 2010
Dob violation - resolved
ECB violations · 37
- Class - 2
Failure to file certificate of correction with the dob. no corrective measures on record for violation# 039556378z-issued 7.09.2026.file a certificate of correction
Sep 2, 2026 · Penalty $1,250
Active - Class - 1
Observed: active site upon inspection noted: construction superintendent failure to perform duties noted missing super log after 07-06-2026 also noted inadequate tool box talking workers not sign after each me
Jul 9, 2026 · Penalty $10,000
Resolve - Class - 2
Responding to an incident, where unknown intruder trespassed into job site and claimed he was injured on his back fall at 2nd fl. level. contractor failure to provide adequate security at entrance of job site c
Jun 5, 2026 · Penalty $5,000
Active - Class - 1
A proposed new 9 story building, there was an unknown citizen that illegally trespassed into the job site while workers were entering & exiting the site for lunch. the trespasser claimed to have injured his bac
Jun 5, 2026 · Penalty $10,000
Active - Class - 2
Bc3309.13: at the time of inspection of the nine-story new building active job site, the adjoining property's ac units at exposures 2,3 and 4 were not properly protected. cement residue was observed on the equi
Mar 4, 2026 · Penalty $2,500
Resolve - Class - 1
Observed roof guardrail toppled, creating falling hazard on unenclosed perimeter (bc 3308.1). on roof and maintain
Feb 18, 2026 · Penalty $5,000
Resolve - Class - 2
Observed supported scaffold (exp #4, facing 38 ave) netting loose, planks untied, poor access (bc 3314.1). this not only created falling hazard for workers, but also failed to protect the public. stop use of su
Feb 18, 2026 · Penalty $2,500
Resolve - Class - 2
Observed jersey barriers without infills or connections, loading dock open to the public. loose barricade could be topple onto the ongoing traffic, while pedestrian might be injured by walking into the working
Feb 18, 2026 · Penalty $1,250
Resolve - Class - 1
Observed adj roof protection missing at rear yard of exp #3 (facing 138 street) while jobsite still had facade work there, compromising neighbor's property on the roof. stop exterior work on rear yard of exp #3
Feb 18, 2026 · Penalty $5,000
Resolve - Class - 2
Suspended scaffold lifelines entangled around the frame without proper protection against sharp edges, while some lifeline had improper anchorage on outrigger beam, or sharing one anchor with other (bc 3314.6).
Feb 18, 2026
Resolve
Show 27 more ↓
- Class - 2
On exposure#2 from 2nd floor to 3rd floor,exposure#3 from 2 to 4th floor and exposure#4 from 3rd floor to 4th floor exterior walls outboard insulation were installed thickness 1.5" r-value 7.5 contrary to en dr
Sep 5, 2025 · Penalty $1,280
Active - Class - 1
Bc3301.2 safety measures & safeguards: inspection of a 9 story building, i observed a worker standing on an a frame ladder beyond the cable system & caz close to the leading edge of the building. the worker was
Aug 7, 2025 · Penalty $5,030
Resolve - Class - 1
During inspection of a 9 story building, i requested for the standpipe testing information, and none was provide. dob records indicated that there was no electrical permit for the standpipe which is required, a
Aug 7, 2025 · Penalty $1,630
Resolve - Class - 1
During inspection, i observed a worker performing over head work on an a frame ladder using a grinder without a guard. the workers leg was over the top straddling the ladder, with both hands off and not maintai
Aug 7, 2025 · Penalty $6,250
Resolve - Class - 2
During inspection i observed that the sidewalk shed was missing the required info panel on the upper parapet. the info panel informs the public and emergency personal of the correct address of the site. provide
Aug 7, 2025 · Penalty $3,125
Resolve - Class - 2
Construction superintendent failed to perform duties per code. as noted at time of inspection on an active construction site 9 story new building structural completed to bulhead. observed that superintendent fa
May 8, 2025 · Penalty $5,000
Resolve - Class - 2
Failure to maintain/display on site documents required by bc chapter 33. as noted at time of inspection on an active construction site 9 story new building. observed(a) at exposure #3 4 feet by 4 feet chipping
May 8, 2025 · Penalty $1,250
Resolve - Class - 2
28-116.2.3. failure to provide inadequate inspection program for tr-1.as noted at time of inspection on an active construction site, 9 storyconcrete cast-in place completed to bulkhead new building. i observed
May 8, 2025 · Penalty $1,250
Resolve - Class - 2
28-104.7. submittal of construction document. as noted at time of inspection on an active construction site, 9 story new building cmu block placement work onsite. observed at exposure #3 cmu block masonry wall
Nov 29, 2024 · Penalty $1,280
Resolve - Class - 1
3303.8.6.1.4-observed 9 stories building topped off w/out exterior walls,only cable system(guardrails installed @perimeter,no horizontal netting installed or alternative system, protection for equipment made of
Nov 4, 2024 · Penalty $2,500
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction-no guardrails.as noted:at time of inspection on active construction site 9 story new building form work placement at floor #5
Jul 12, 2024 · Penalty $5,030
Resolve - Class - 2
Failure to maintain/display on site documents required by bc chapter 33.as noted:at time of inspection on active construction site 9 story new building formwork placement work at floor #5 observed at exp #3, fl
Jul 12, 2024 · Penalty $1,280
Resolve - Class - 1
Bc3305.3.6 failure to provide re-shoring schedule.as noted:at time of inspection on active construction site 9 story new building form work placement at floor #5 observed at floor #2 #3 installed with re-shorin
Jul 12, 2024 · Penalty $2,530
Resolve - Class - 1
3304.8 and 3304.14.2. failure to drain construction site of standing water. as noted: at time of inspection at a jobsite for a proposed 9 story building at the 1st floor level, observed approximately "4.5" of g
May 30, 2024 · Penalty $2,500
Resolve - Class - 2
Failure to maintain/display on site documents required by bc chapeter 33. no noted at time of my inspection of 9 stories building on requesting for (1) amended drawing, (2) formwork drawing and t.r.o none was p
Mar 6, 2024 · Penalty $1,250
Resolve - Class - 2
Work does not conform to approved construction documents & or approvedamendments. insp dwg alt 1 420572589,10/17/12. note at time of inspection found (1) 2nd fl level wall configuration altered where plans
Mar 27, 2013 · Penalty $500
Resolve - Class - 2
Work w/o a permit. note at time of inspection found (1) plumbing work performed for the creation of a steam room/shower & sauna on the 2nd fl. (2) found elevator has been taken out of service by the creation of
Mar 27, 2013 · Penalty $800
Resolve - Class - 2
Sec. 1001.2 it shall be unlawful to alter a bldg of structure in a manner that will reduce the # of exits or the capacity of the means of egress to less than required. premises under p.c. alt 2 420592601,filed
Mar 27, 2013 · Penalty $800
Resolve - Class - 2
Occupancy contrary to that allowed by the c of o or bldg dept records.note: at time of inspection found temp c of o 420572589t001 expired 3-11-13. temporary c of o indicates 2nd fl as a use group 6,w/a beauty
Mar 27, 2013 · Penalty $1,200
Resolve - Class - 2
Failure to maintain bldg in a code compliant manner. note at time of inspection found elevator ea 173/2010 taken out of service by the creation of a 2pcs bathroom at the 2nd fl level in the elevator shaft.
Mar 27, 2013 · Penalty $500
Resolve - Class - 2
Sec. 12-10 creation of a physical culture establishment (massage parlor) w/o bsa approval. note at time of inspection found a massage parlorcreated on the 2nd fl w/a steam rm/shower & sauna w/i no bsa approval
Mar 27, 2013 · Penalty $800
Resolve - Class - 1
Work w/o a permit. note: at time of inspection found store front removed, 1st flr partially demoed/gutted & areas of 1st flr flring removed leaving exposed wood joists.no permits posted on or record aspermitted
Jun 13, 2012
Resolve - Class - 2
Occupancy contrary to that allowed by the cert of occupancy noted premises 2sty commercial bldg 1st fl occupied as restaurant c/o shows 1st fl store rem: discontinue illegal use of amend c/o
Jun 9, 2010 · Penalty $1,200
Resolve - Class - 1
Occupancy contrary to that allowed by the c of o or dob records. c of o #191924 states for first flr 1 store. premises has been divided into2 restaurants, one restaurant w/ seating for 37 the other w/ seating
Dec 30, 2008 · Penalty $2,400
Resolve - Class - 2
Altered/changed bldg occupied w/o a valid c of o as per 28-118.3.1-28-118.3.2 for alt i job #400415500. to change first flr from store to 2 eating and drinking establishment work completed establishment opened
Dec 30, 2008
Resolve - Class - 2
Failure to provide approved/accepted plans at job site at time of inspection for alt ii job #401750609 permit expired 7-15-05 plans not at site or in folder. remedy: provide plans assure a set for dob folder.
Dec 30, 2008 · Penalty $250
Resolve - Class - 3
Failure to maintain bldg in code compliant manner interior at time of inspection damaged ceiling panels on the 2nd fl due to active water leaks from the roof observed the following areas were noted ktcn toilet
Jul 9, 2008
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2025
- Floors
- —
- Residential units
- 10
- Building area
- 22,681 ft²
- Lot area
- 5,078 ft²
- Zoning
- C4-3
- Community board
- 407
- Council district
- 20
- Block / lot
- 4978 / 76
- Assessed value
- $654,300
- Landmark / historic district
- No
Questions about 136-11 38 Avenue
Who owns 136-11 38 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is W H Plaza, LLC.
Does 136-11 38 Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 136-11 38 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 136-11 38 Avenue built?
City records list 2025 as the year it was built.
How many apartments are in 136-11 38 Avenue?
It has 10 residential units and 12 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.