Prince Street
Queens, NY 11354BBL 4-04949-0075Map
Owner of record: Princeton Estates LLC
Prince Street is a factory / industrial built in 2021 in Queens, 11354. The owner of record is Princeton Estates LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 8
- ECB violations
- 25
- HPD complaints
- 7
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 8
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - dismissed - Construction other optional
Boro commissioner has ordered work stopped for # q00080057-i 1 due to general contractor withdrawal.
Apr 4, 2022
Dob violation - dismissed - Construction other optional
Borough commissioners notice of order to stop work immediately due to suspension of contracters license for job # 421342586.
Dec 30, 2021
Dob violation - dismissed - Construction other optional
Boro commissioner's notice of order to stop work immediately due to suspension of contractor's license for job # q00080057-11.
Dec 30, 2021
Dob violation - dismissed - Construction other optional
Boro commissioner's notice of order to stop work immediately due to suspension of contractor's license for job # q00080057-11.
Dec 30, 2021
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 26, 2000
Dob violation - dismissed - Construction other optional
Jd
Feb 28, 1990
Vp*-violation unserved ecb- dismissed - Construction other optional
Jd
Feb 21, 1990
Vp*-violation unserved ecb- dismissed
ECB violations · 25
- Class - 2
Observed:active site cp present upon inspection checked all log books and noted: super log book ,preshift , orientation and toolbox talking all inadequate ., preshift no date ,no workers sign , orientation mi
Apr 10, 2025 · Penalty $1,250
Resolve - Class - 2
Observed: active site ,upon inspection noted: great amount of garbage black plastic bags, wooden plastic cans and metal creating hazards for rodents and workers on site
Apr 10, 2025
Resolve - Class - 2
Observed multiple temporary platforms in interior open shafts near exp#4. upon review of the pe-approved design drawings, i found that a full second (bottom) layer of planks going across the shaft was not provi
Oct 19, 2023
Resolve - Class - 2
Upon in inspection of an non-active proposed 4 story nb i observed a temp construction fence installed at exposure 1 not according to code. i observed the 1 and only viewing panel with no panel cover & with an
Jul 22, 2023
Resolve - Class - 2
4 story nb active site. i observed a temporary makeshift work platform in place on 6'x6' opening on concrete slab with planking on top not properly secured an unsafe condition on 1,2,3 floor. exposing workers t
Mar 16, 2023
Resolve - Class - 2
At the time of my inspection of a proposed 4 story nb i observed a temp construction fence installed. after reviewing dob records it was determined that the temp fence expired 1-11-23
Jan 14, 2023
Resolve - Class - 2
Failure to provide p.e approved detail design drawings. as noted:at time of inspection on an active construction site. observed at exposure#4,stair 1 and 2 was placed steel panel staircase w/ landing at floor#1
Jul 21, 2022
Resolve - Class - 2
Work doesnt conform to approved const docs &or approved amendments.atoi of active site i observed pipe grips missing@exp1/4 corners elevation1 sidewalkshed&crossbrace installed in wrong location.conform work to
Jul 14, 2022
Resolve - Class - 2
Failure to maintain adequate housekeeping per sec requirements.atoi ofactive site i observed const material on top of roof protection wire mesh&2x4 wood no const material should be on top of roof protection as
Jul 14, 2022 · Penalty $1,280
Resolve - Class - 2
At time of inspection i observed windows at exposure #4 not covered during construction operation workers were puting up cmu wall no windows were covered it shall be the duty of the person causing such work to
Jul 14, 2022
Resolve
Show 15 more ↓
- Class - 2
Bc3309.10 miscvios.atoi of active jobsite i observed roof protection@exp2/4 w/styrofoam,2osha planks,plywood on top,roof wasnt fully plankedw/osha approved planks.roof should be of flame retardant wood plank la
Jul 14, 2022 · Penalty $1,280
Resolve - Class - 2
At time of inspection of a proposed four story new building at second floor level, i observed sidewalk shed at exposure #1 missing protection between construction fence and sidewalk shed. bc-3307.2.3 requires s
Jul 2, 2022
Resolve - Class - 2
Work contrary to design drawings-sidewalk shed.at time of inspection of active proposed 4 story nb job site observed sws installed at exp #1 contrary due to no anchor plates installed as shown in design drawing
Mar 15, 2022
Resolve - Class - 2
Bc3314.1 supported scaffolds not erected or maintained to code.at time of inspection of active 4 story nb job site observed supported scaffolds installed at all exposures on interior of job site missing toe boa
Mar 15, 2022
Resolve - Class - 2
Work contrary to side safety plan.at time of inspection on active proposed 4 story nb job site observed shanty installed at exp #1 shanty not shown on site safety plan.remedy:conform to and/or amend site safety
Mar 15, 2022
Resolve - Class - 2
28-116.2.3 failure to provide an adequate inspection program tr-3,light weight concrete design mix.as noted:at time of inspection on an active construction site,failure to provide and file with dept.of building
Dec 10, 2021
Resolve - Class - 2
Bc 3301.1.2 fire code-fire extinguishers(fdny fc 906)at time of inspection on an active 4 story nb jobsite i observed fire extinguishers on site not inspected monthly fire extinguishers in cellar missing inspec
Nov 30, 2021
Resolve - Class - 2
Documents to be kept onsite at time of inspection on an active 4 storynb jobsite when inspecting the requred daily logs i observed tool box talks have not been conducted/maintained since 10/26/2021-must be done
Nov 30, 2021 · Penalty $1,280
Resolve - Class - 1
Bc3301.13.3 failure to designate &/or have const super present@site asrequired.noted:ato my insp of n4styb,@grndfl,aprx7workers onsite,i observed workers entering site@aprx7:05am.i entered site@7:30&observed ac
Oct 20, 2021 · Penalty $2,500
Resolve - Class - 2
Bc3309.9 weather proofing integrity of adj bldg noted:ato my insp of n4styb,const in progress,aprx7workers onsite,i observed adj property@exp4 had its exposed facade covered w/(illegible) which had become loose
Oct 20, 2021 · Penalty $3,125
Resolve - Class - 2
Bc3301.1 1926.701b uncapped rebar onsite noted:ato my insp of n4stybldg,const in progress@grnd fl,aprx7workers onsite,upon entering site i observed large secs of rebar aprx3-4'@exps2,3,4 which had no caps on or
Oct 20, 2021
Resolve - Class - 2
Const super failed to perform duties per code.noted:ato my insp of n4stybldg,const in progress@grndfl,aprx7workers on site,i observed following conditions no cs or comp person on site uncapped rebar thruout no
Oct 20, 2021 · Penalty $5,000
Resolve - Class - 2
Project information panel construction sign not provided or not posted. noted: at time of inspection of an none active jobsite observed no project information panel construction sign not posted. remedy: comply
Jan 15, 2020
Resolve - Class - 2
Jobsite fence not constructed or maintained pursuant to subsection. noted: at time of inspection of an none active. upon reviewing(bis/dob now)observed jobsite construction fence erected under permit#q00080057-
Jan 15, 2020
Resolve - Hazardous
Residence altered for occupancy as a dwelling for more than the legally approved # of families.bldg dept records indicated residence is legally approved for two families.bldg now occupied by the two families
Jul 10, 2003
Resolve
Complaints
- Heating
Heat related
Mar 15, 2012 · Apt 3
Close - Heating
Heat related
Mar 15, 2012 · Apt 3FL
Close - Heating
Heat related
Mar 14, 2012 · Apt 3
Close - Heating
Heat related
Mar 13, 2012 · Apt 3
Close - Heating
Heat related
Oct 27, 2005 · Apt 1
Close - Plumbing
Water-leaks
Oct 27, 2005 · Apt 1
Close - Heating
Heat-plant
Oct 27, 2005 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Factory / industrial (F9)
- Year built
- 2021
- Floors
- 4
- Residential units
- —
- Building area
- 30,040 ft²
- Lot area
- 8,328 ft²
- Zoning
- M2-1
- Community board
- 407
- Council district
- 20
- Block / lot
- 4949 / 75
- Assessed value
- $1,481,400
- Landmark / historic district
- No
Questions about Prince Street
Who owns Prince Street?
The owner of record in NYC Department of City Planning PLUTO data is Princeton Estates LLC.
Does Prince Street have violations?
NYC HPD has no housing violations on record for this property.
Is Prince Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was Prince Street built?
City records list 2021 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.