22-49 121 Street
Queens, NY 11356BBL 4-04197-0001Map
Owner of record: He, Xiulan
22-49 121 Street is a two-family home built in 1920 in Queens, 11356. It has 2 residential units across 2 floors. The owner of record is He, Xiulan. HPD has recorded 50 housing violations here, most recently on December 17, 2025. 15 of the 50 most recent violations are still open.
- HPD violations
- 50
- DOB violations
- 1
- ECB violations
- 3
- HPD complaints
- 7
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 50
- CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door frame, north wall in the 2nd room from east at south located at apt 2, 2nd story, 1st apartment from north at east
Dec 17, 2025 · Apt 2
Open — Defect letter issued - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Dec 17, 2025 · Apt 2
Closed — Violation closed - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Dec 17, 2025 · Apt 2
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Dec 17, 2025 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , 1st window frame from south at west wall, 1st closet from north at east wall door, 1st closet from north at east wall door frame, ceiling in the 3rd room from east at north located at apt 2, 2nd story, 1st apartment from north at east
Dec 17, 2025 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , south wall, west wall in the 3rd room from east at south located at apt 2, 2nd story, 1st apartment from north at east
Dec 17, 2025 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , west wall, 1st closet from west at north wall door in the 2nd room from east at south located at apt 2, 2nd story, 1st apartment from north at east
Dec 17, 2025 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , 1st window frame from north at east wall, 1st window frame from east at south wall, 1st door from west at north wall in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from north at east
Dec 17, 2025 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Dec 17, 2025 · Apt 2
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2, 2nd story, 1st apartment from north at east
Dec 17, 2025 · Apt 2
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, 1st door frame from south at west wall, north wall, south wall in the foyer located at apt 2, 2nd story, 1st apartment from north at east
Dec 17, 2025 · Apt 2
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, baseboard at east wall, 1st window frame from west at north wall, 2nd window frame from west at north wall in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Dec 17, 2025 · Apt 2
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, north wall, south wall, east wall in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from north at east
Dec 17, 2025 · Apt 2
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall in the 2nd room from east at south located at apt 2, 2nd story, 1st apartment from north at east
Dec 17, 2025 · Apt 2
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall, 2nd window frame from south at west wall, 3rd window frame from south at west wall in the 3rd room from east at south located at apt 2, 2nd story, 1st apartment from north at east
Dec 17, 2025 · Apt 2
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, west wall in the 3rd room from east at north located at apt 2, 2nd story, 1st apartment from north at east
Dec 17, 2025 · Apt 2
Open — Defect letter issued - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Dec 12, 2025 · Apt 2
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 2fl, 2nd story, 1st apartment from north at east
Nov 17, 2025 · Apt 2FL
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling, ceiling in the kitchen located at apt 2fl, 2nd story, 1st apartment from north at east
Nov 17, 2025 · Apt 2FL
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door from west at north wall, 1st window frame from north at east wall, 1st window frame from east at south wall, 1st door from west at north wall, 1st window frame from north at east wall, 1st window frame from east at south wall in the 1st room from east at south located at apt 2fl, 2nd story, 1st apartment from north at east
Nov 17, 2025 · Apt 2FL
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2fl, 2nd story, 1st apartment from north at east
Nov 17, 2025 · Apt 2FL
Open — Certification postponment granted - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from east at north located at apt 2fl, 2nd story, 1st apartment from north at east
Nov 17, 2025 · Apt 2FL
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, 1st door frame from south at west wall, north wall, south wall in the foyer located at apt 2fl, 2nd story, 1st apartment from north at east
Nov 17, 2025 · Apt 2FL
Open — Defect letter issued - BHazardous
Properly repair or replace the broken or defective upper sash spring balance at 2nd window from east at south wall in the 2nd room from east at south located at apt 2fl, 2nd story, 1st apartment from north at east
Nov 17, 2025 · Apt 2FL
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st radiator from south at west wall in the 3rd room from east at south located at apt 2fl, 2nd story, 1st apartment from north at east
Nov 17, 2025 · Apt 2FL
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st closet from west at north wall door, 1st closet from west at north wall door in the 2nd room from east at south located at apt 2fl, 2nd story, 1st apartment from north at east
Nov 17, 2025 · Apt 2FL
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 1st room from east at south located at apt 2fl, 2nd story, 1st apartment from north at east
Nov 17, 2025 · Apt 2FL
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, baseboard at west wall, 1st closet from west at north wall door frame in the 2nd room from east at south located at apt 2fl, 2nd story, 1st apartment from north at east
Nov 17, 2025 · Apt 2FL
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, baseboard at west wall, 1st window frame from south at west wall, 2nd window frame from south at west wall, 3rd window frame from south at west wall in the 3rd room from east at south located at apt 2fl, 2nd story, 1st apartment from north at east
Nov 17, 2025 · Apt 2FL
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, baseboard at east wall, 1st window frame from west at north wall in the kitchen located at apt 2fl, 2nd story, 1st apartment from north at east
Nov 17, 2025 · Apt 2FL
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, 1st window frame from east at south wall in the 2nd room from east at south located at apt 2ndflo, 2nd story, 1st apartment from north at east
Jul 31, 2025 · Apt 2NDFLO
Closed — Violation closed - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from north at east
Jul 31, 2025 · Apt 2NDFLO
Closed — Violation closed - BHazardous
Properly secure the loose base cabinet at south wall in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from north at east
Jul 31, 2025 · Apt 2NDFLO
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2ndflo, 2nd story, 1st apartment from north at east
Jul 31, 2025 · Apt 2NDFLO
Open — Certification postponment denied - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 2nd window frame from east at south wall in the 2nd room from east at south located at apt 2ndflo, 2nd story, 1st apartment from north at east
Jul 31, 2025 · Apt 2NDFLO
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from north at east
Jul 31, 2025 · Apt 2NDFLO
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door frame in the 3rd room from east at south located at apt 2ndflo, 2nd story, 1st apartment from north at east
Jul 31, 2025 · Apt 2NDFLO
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall in the foyer located at apt 2ndflo, 2nd story, 1st apartment from north at east
Jul 31, 2025 · Apt 2NDFLO
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at west wall, 1st window frame from north at east wall in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from north at east
Jul 31, 2025 · Apt 2NDFLO
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective closet doors at east wall in the 3rd room from east at south located at apt 2ndflo, 2nd story, 1st apartment from north at east
Jul 31, 2025 · Apt 2NDFLO
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at north wall north wall in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from north at east original violation 18124305 issued 31-jul-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Jul 31, 2025 · Apt 2NDFLO
Closed — Violation dismissed - BHazardous
Properly secure the loose washbasin base cabinet at north wall in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from north at east
Jul 31, 2025 · Apt 2NDFLO
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective washbasin base cabinet at north wall in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from north at east
Jul 31, 2025 · Apt 2NDFLO
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish at bathtub by the method of reglazing in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from north at east
Jul 31, 2025 · Apt 2NDFLO
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from west at north wall door in the 3rd room from east at south located at apt 2ndflo, 2nd story, 1st apartment from north at east
Jul 31, 2025 · Apt 2NDFLO
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from north at east wall in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from north at east
Jul 31, 2025 · Apt 2NDFLO
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from east at south wall, north wall in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from north at east
Jul 31, 2025 · Apt 2NDFLO
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at north wall north wall in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from north at east
Jul 31, 2025 · Apt 2NDFLO
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from north at east
Jul 31, 2025 · Apt 2NDFLO
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling ceiling in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from north at east
Jul 31, 2025 · Apt 2NDFLO
Closed — Violation closed
DOB building violations · 1
- Construction other optional
Wt
Dec 22, 1988
Dob violation - dismissed
ECB violations · 3
- Class - 3
Fence exceeds permitted height. noted: fence erected on top of cmu wall at front(exp#1)of the property approx 5'-6" to 6'-0"high. this condition exceeds the legal allowable height of fence at front & upto bldg
Aug 23, 2018
Resolve - Class - 2
Work w/o a permit work noted: at cellar level erected full height partitions & installed water & waste lines for a 3pc bathroom (sink,toilet,shower) & a residential sink. remedy: obtain permit or restore to
Jan 8, 2010 · Penalty $800
Resolve - Non-hazardous
Work without a permit. work noted driveway and curb cut installed at 23rd avenue. remedy: obtain approval and permits or restore to prior legal condition.
Aug 9, 1997
Resolve
Complaints
- Paint/plaster
Ceiling
Nov 13, 2025 · Apt 2FL
Close - Unsanitary condition
Mold
Nov 13, 2025 · Apt 2FL
Close - Paint/plaster
Ceiling
Nov 13, 2025 · Apt 2FL
Close - Heat/hot water
Apartment only
Nov 5, 2025 · Apt 2
Close - Unsanitary condition
Mold
Jul 29, 2025 · Apt 2NDFLO
Close - Paint/plaster
Ceiling
Jul 29, 2025 · Apt 2NDFLO
Close - Appliance
Electric/gas range
Jul 29, 2025 · Apt 2NDFLO
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B2)
- Year built
- 1920
- Floors
- 2
- Residential units
- 2
- Building area
- 1,928 ft²
- Lot area
- 2,500 ft²
- Zoning
- R4A
- Community board
- 407
- Council district
- 19
- Block / lot
- 4197 / 1
- Assessed value
- $63,960
- Landmark / historic district
- No
HPD registration #928722, last renewed Sep 2, 2025.
Questions about 22-49 121 Street
Who owns 22-49 121 Street?
The owner of record in NYC Department of City Planning PLUTO data is He, Xiulan.
Does 22-49 121 Street have violations?
Yes. NYC HPD has recorded 50 housing violations at this property.
Is 22-49 121 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 22-49 121 Street built?
City records list 1920 as the year it was built.
How many apartments are in 22-49 121 Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.