18-11 College Point Blvd
Queens, NY 11356BBL 4-04128-0015Map
Owner of record: Difonzo, As Trustee, Michael
18-11 College Point Blvd is a mixed residential and retail building built in 1931 in Queens, 11356. It has 4 residential units across 3 floors. The owner of record is Difonzo, As Trustee, Michael. HPD has recorded 41 housing violations here, most recently on February 28, 2020. 2 of the 41 most recent violations are still open.
- HPD violations
- 41
- DOB violations
- 17
- ECB violations
- 5
- HPD complaints
- 100
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 41
- CImmediately hazardous
Arrange and make self-closing the doors .... in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north
Feb 28, 2020 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entrance located at apt 2l, 2nd story, 1st apartment from west at north
Feb 28, 2020 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors .... in the entrance located at apt 2r, 2nd story, 1st apartment from east at south
Feb 28, 2020 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors front entrance door to building , 1st story
Feb 28, 2020
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors ... in the entrance located at apt 3l, 3rd story, 1st apartment from west at north
Feb 28, 2020 · Apt 3L
Closed — Violation dismissed - IInformation / order
The premises have been vacated by an order of this department and cannot be reoccupied except for caretaker until a new certificate of occupancy has been obtained.
Sep 2, 2016
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of fire damage in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
Jul 28, 2016 · Apt 3R
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of fire damage in the entire apartment located at apt 3l, 3rd story, 1st apartment from west at north
Jul 28, 2016 · Apt 3L
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of fire damage in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Jul 28, 2016 · Apt 2R
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of fire damage in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north
Jul 28, 2016 · Apt 2L
Closed — Violation closed
Show 31 more ↓
- BHazardous
Properly repair the broken or defective bell & return buzzer system in the entire apartment located at apt 3l, 3rd story, apartment at east
Mar 5, 2009 · Apt 3L
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system 1st story public hall
Mar 5, 2009
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door to boiler room locked cellar
Mar 5, 2009
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box 1st story public hall
Mar 5, 2009
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules.
Mar 5, 2009
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor 1st story public hall
Mar 5, 2009
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective metal base cabinet at sink in the kitchen located at apt 3r, 3rd story, apartment at west
Mar 5, 2009 · Apt 3R
Closed — Violation closed - BHazardous
Properly secure the loose handrail at stair all stories at public hall
Mar 5, 2009
Closed — Violation closed - BHazardous
Properly repair the broken or defective bell & return buzzer system in the entire apartment located at apt 3r, 3rd story, apartment at west
Mar 5, 2009 · Apt 3R
Closed — Violation closed - BHazardous
Abate the nuisance consisting of vermin mice at apt 3l 3rd story apt at east
Mar 5, 2009
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceiling throughout located at apt 3r, 3rd story, 1st apartment from north at east
Jan 14, 2007 · Apt 3R
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets leaky hot water in the bath tub located at apt 3r, 3rd story, 1st apartment from north at east
Jan 14, 2007 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair the broken or defective bell at the entrance door to bldg. located at apt 3r, 3rd story, 1st apartment from north at east
Jan 14, 2007 · Apt 3R
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... over walls in the bathroom located at apt 3r, 3rd story, 1st apartment from north at east
Jan 14, 2007 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair the broken or defective electric bell to open bldg. entrance door from the apt located at apt 3r, 3rd story, 1st apartment from north at east
Jan 14, 2007 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair the broken or defective inoperative bell system at front areaway to in the entire apartment located at apt 2r, 2nd story
Dec 19, 2006 · Apt 2R
Closed — Violation closed - BHazardous
Replace with new the broken or defective shut off radaitor valves thru-out in the entire apartment located at apt 2r, 2nd story, apartment at east
Dec 19, 2006 · Apt 2R
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the east yard
Feb 7, 2005
Open — Not complied with - BHazardous
Properly repair the broken or defective door bell in the entire apartment located at apt 2r, 2nd story, apartment at east
Feb 7, 2005 · Apt 2R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the 3rd room from east at south located at apt 2r, 2nd story
Sep 23, 2003 · Apt 2R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling at closet in the foyer located at apt 2r, 2nd story, apartment at south
Sep 23, 2003 · Apt 2R
Closed — Violation closed - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 2r, 2nd story, apartment at south
Sep 23, 2003 · Apt 2R
Closed — Violation closed - BHazardous
Abate the nuisance consisting of vermin mice droppings in the entire apartment located at apt 2r, 2nd story, apartment at south
Sep 23, 2003 · Apt 2R
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2r, 2nd story, apartment at south
Sep 23, 2003 · Apt 2R
Closed — Violation closed - ANon-hazardous
§ 62 m/d law rearrange television and/or radio antenna to be at least 10 feet above roof and not attached to any fire escape or soil or vent line rear roof.
Jun 24, 1999
Closed — Violation closed - BHazardous
D26-10.01 adm code properly repair with similar material the broken or defective plaster clg cellar at frnt.
Apr 26, 1999
Closed — Violation closed - ANon-hazardous
D26-20.08,20.09 adm code file certification of satisfactory installation of smoke detecting device in accordance with h.p.d. rules and regulations.
Apr 26, 1999
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retarding ceiling cellar thruout.
Apr 26, 1999
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yard thruout.
Apr 26, 1999
Open — Not complied with - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the cellar thruout.
Apr 26, 1999
Closed — Violation closed - ANon-hazardous
D26-10.01 adm code abate the nuisance consisting of cardboard cartons clothes stored at cellar.
Apr 26, 1999
Closed — Violation closed
DOB building violations · 17
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Construction other optional
Due to fire
Jul 22, 2016
Dob violation - dismissed
Show 7 more ↓
- Construction other optional
Emerg work.bldg suffered severe damages from fire.structural integrity of bldg is compromised.bldg is at imminent risk of further collapse remedy:owner to immed demolish bldg.start work no later than 10am 7/23/16.work to be performed under pe supervision.file for permit within 48 hrs of commencing work
Jul 22, 2016
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - dismissed
ECB violations · 5
- Class - 2
Pedestrian protection does not meet code specification. note:observed a construction fence is blocking a sidewalk fully and street partiallytemporary public walkways are not provided.that does not meet code spe
Oct 13, 2016 · Penalty $2,400
Resolve - Class - 2
Illegal use in a commercial district. noted: at rear of existing gifts& variety stores. found storage of const equipments including pipe scaffolds bracing wood planks & aluminum platforms in excess of 40 cubic
Jun 3, 2010 · Penalty $400
Resolve - Class - 2
Exit passageway of corridor required width decreased by obstruction. noted: at rear of existing bldg storage of aluminum platforms approx 3'x 30' at right passage way has reduced the width from approx 4' to 1
Jun 3, 2010 · Penalty $500
Resolve - Hazardous
Exit passage way-total obstructions. large accumulation of debris,lumber, ceiling panels and wood pallets in rear yard at base of firescape (at rear) and in exit passage way (garage cans) are causing an obstruc
Aug 11, 2005 · Penalty $480
Resolve - Hazardous
Exit passageway corridor total obstruction at west side of bldg steal gate padlocked and deabolted from street sides preventing flow of egress out of passageway which exits from fire escape & fire ladder at rea
Apr 6, 2005 · Penalty $480
Resolve
Complaints
- Heat/hot water
Apartment only
Dec 20, 2014 · Apt 2L
Close - General
Doors
Jan 26, 2010 · Apt BLDG
Close - General
Doors
Jan 26, 2010 · Apt BLDG
Close - General
Stairs
Jan 26, 2010 · Apt BLDG
Close - General
Doors
Jan 6, 2010 · Apt BLDG
Close - General
Stairs
Jan 6, 2010 · Apt BLDG
Close - General
Locks
Jan 6, 2010 · Apt BLDG
Close - Plumbing
Sewer
Sep 9, 2009 · Apt 3L
Close - Nonconst
Vermin
Sep 9, 2009 · Apt 3L
Close - Nonconst
Rubbish
Sep 9, 2009 · Apt 3L
Close
Show 40 more ↓
- Nonconst
Vermin
Feb 27, 2009 · Apt BLD
Close - General
Stairs
Feb 17, 2009 · Apt BLDG
Close - Plumbing
Water supply
Feb 6, 2009 · Apt 3R
Close - General
Cabinet
Feb 6, 2009 · Apt 3R
Close - Nonconst
Vermin
Feb 6, 2009 · Apt 3R
Close - General
Stairs
Feb 6, 2009 · Apt 3R
Close - Plumbing
Water supply
Feb 1, 2009 · Apt 3R
Close - Plumbing
Water supply
Jan 22, 2009 · Apt 3R
Close - Nonconst
Vermin
Jan 16, 2009 · Apt BLD
Close - Nonconst
Vermin
Jan 16, 2009 · Apt BLD
Close - Electric
Bell-buzzer/intercom
Nov 13, 2008 · Apt 3L
Close - Heating
Heat related
Oct 21, 2008 · Apt 3L
Close - Heating
Heat related
Oct 19, 2008 · Apt 3L
Close - General
Doors
Apr 4, 2008 · Apt 3R
Close - Paint/plaster
Ceiling
Apr 4, 2008 · Apt 3R
Close - Paint/plaster
Ceiling
Apr 4, 2008 · Apt 3R
Close - Plumbing
Water-leaks
Apr 4, 2008 · Apt 3R
Close - General
Floor
Apr 4, 2008 · Apt 3R
Close - Plumbing
Water-leaks
Apr 4, 2008 · Apt 3R
Close - Plumbing
Water-leaks
Apr 4, 2008 · Apt 3R
Close - Heating
Heat related
Nov 3, 2007 · Apt 3L
Close - Heating
Heat related
Nov 3, 2007 · Apt 3L
Close - Plumbing
Basin/sink
Feb 4, 2007 · Apt 2D
Close - Plumbing
Basin/sink
Feb 4, 2007 · Apt 2D
Close - Electric
Electric-supply
Feb 4, 2007 · Apt 2D
Close - Plumbing
Water-leaks
Dec 23, 2006 · Apt 2D
Close - Plumbing
Water-leaks
Dec 23, 2006 · Apt 2D
Close - Plumbing
Water-leaks
Dec 23, 2006 · Apt 2D
Close - Heating
Heat related
Dec 14, 2006 · Apt 3L
Close - Plumbing
Radiator
Dec 13, 2006 · Apt 2D
Close - Electric
Lighting
Dec 13, 2006 · Apt 2R
Close - Heating
Heat related
Dec 13, 2006 · Apt 2R
Close - Heating
Heat related
Dec 12, 2006 · Apt 3L
Close - Electric
Lighting
Dec 12, 2006 · Apt 3L
Close - Electric
Lighting
Dec 12, 2006 · Apt 3L
Close - Heating
Heat related
Dec 10, 2006 · Apt 3L
Close - Electric
Bell-buzzer/intercom
Dec 10, 2006 · Apt 2R
Close - Electric
Lighting
Dec 10, 2006 · Apt 2R
Close - Electric
Electric-supply
Dec 10, 2006 · Apt 2R
Close - General
Mold
Nov 20, 2006 · Apt 3R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S9)
- Year built
- 1931
- Floors
- 3
- Residential units
- 4
- Building area
- 5,676 ft²
- Lot area
- 5,000 ft²
- Zoning
- R5B
- Community board
- 407
- Council district
- 19
- Block / lot
- 4128 / 15
- Assessed value
- $695,700
- Landmark / historic district
- No
HPD registration #411708, last renewed Jul 20, 2026.
Questions about 18-11 College Point Blvd
Who owns 18-11 College Point Blvd?
The owner of record in NYC Department of City Planning PLUTO data is Difonzo, As Trustee, Michael.
Does 18-11 College Point Blvd have violations?
Yes. NYC HPD has recorded 41 housing violations at this property.
Is 18-11 College Point Blvd rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 18-11 College Point Blvd built?
City records list 1931 as the year it was built.
How many apartments are in 18-11 College Point Blvd?
It has 4 residential units and 6 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.