14-21 College Point Blvd
Queens, NY 11356BBL 4-04085-0059Map
Owner of record: C.p.y. Realty Group LLC
14-21 College Point Blvd is a walk-up apartment building built in 1950 in Queens, 11356. It has 12 residential units across 4 floors. The owner of record is C.p.y. Realty Group LLC. HPD has recorded 149 housing violations here, most recently on June 3, 2026. 43 of the 50 most recent violations are still open.
- HPD violations
- 149
- DOB violations
- 24
- ECB violations
- 12
- HPD complaints
- 72
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 149
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective vestibule door leading to public hall , 1st story
Jun 3, 2026
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jun 3, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jun 3, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings
Jun 3, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balance at lower window sash at 1st window from south at west in the 3rd room from east at north located at apt 12, 4th story, 1st apartment from south at west
Jun 3, 2026 · Apt 12
Open — Nov certified late - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling junction box in the private hallway located at apt 12, 4th story, 1st apartment from south at west
Jun 3, 2026 · Apt 12
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the kitchen located at apt 12, 4th story, 1st apartment from south at west
Jun 3, 2026 · Apt 12
Open — Nov certified late - BHazardous
Properly repair or replace the broken or defective peephole at door in the entrance located at apt 12, 4th story, 1st apartment from south at west
Jun 3, 2026 · Apt 12
Open — Nov certified late - BHazardous
Properly repair or replace the broken or defective mechanical ventilation system at ceiling in the bathroom located at apt 12, 4th story, 1st apartment from south at west
Jun 3, 2026 · Apt 12
Open — Nov certified late - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and south wall in the bathroom located at apt 12, 4th story, 1st apartment from south at west
Jun 3, 2026 · Apt 12
Closed — Violation dismissed
Show 40 more ↓
- ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling and south wall in the bathroom located at apt 12, 4th story, 1st apartment from south at west
Jun 3, 2026 · Apt 12
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 12, 4th story, 1st apartment from south at west
Jun 3, 2026 · Apt 12
Open — Nov certified late - BHazardous
Properly repair or replace the broken or defective intercom and bell buzzer system from building front entrance to north wall in the private hallway located at apt 12, 4th story, 1st apartment from south at west
Jun 3, 2026 · Apt 12
Open — Nov certified late - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 12, 4th story, 1st apartment from south at west
Jun 3, 2026 · Apt 12
Open — Nov certified late - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Open — Nov sent out - BHazardous
Provide dwelling with a janitor or responsible person or janitorial service.
Feb 9, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch set at exit door leading to south yard at public hall, 1st story
Feb 9, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood base cabinet at sink in the kitchen located at apt 2, 1st story, 2nd apartment from north at east
Feb 9, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system . door locked in cellar at boiler room
Feb 9, 2026
Open — Nov certified late - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 2nd room from east located at apt 2, 1st story, 2nd apartment from north at east
Feb 9, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at exit door leading to south yard at public hall, 1st story
Feb 9, 2026
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 1st story, 2nd apartment from north at east
Feb 9, 2026 · Apt 2
Open — Invalid certification - BHazardous
Properly repair or replace the broken or defective glass at upper sash at the 1st window from east at south in the 2nd room from east located at apt 2, 1st story, 2nd apartment from north at east
Feb 1, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Feb 1, 2026
Open — Nov certified late - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 1st story, 2nd apartment from north at east
Feb 1, 2026 · Apt 2
Open — Nov certified late - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 1st story, 2nd apartment from north at east
Feb 1, 2026 · Apt 2
Open — Nov certified late - BHazardous
Properly repair or replace the broken or defective bell/buzzer/intercom from the building entrance to the south wall in the foyer located at apt 4, 2nd story, 1st apartment from north at east
Nov 17, 2025 · Apt 4
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 4, 2nd story, 1st apartment from north at east
Nov 17, 2025 · Apt 4
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 4, 2nd story, 1st apartment from north at east
Nov 17, 2025 · Apt 4
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at north wall in the 3rd room from east at north located at apt 4, 2nd story, 1st apartment from north at east
Nov 17, 2025 · Apt 4
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the bathroom located at apt 4, 2nd story, 1st apartment from north at east
Nov 17, 2025 · Apt 4
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective base cabinet at washbasin in the bathroom located at apt 4, 2nd story, 1st apartment from north at east
Nov 17, 2025 · Apt 4
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at north wall in the 3rd room from east at north located at apt 4, 2nd story, 1st apartment from north at east original violation 18376410 issued 17-nov-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Nov 17, 2025 · Apt 4
Open — First no access to re- inspect violation - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 30 sq ft at ceiling, north and east walls in the 1st room from east located at apt 4, 2nd story, 1st apartment from north at east
Nov 17, 2025 · Apt 4
Open — Notice of issuance sent to tenant - CImmediately hazardous
Properly repair or replace the broken or defective mortise lock at door in the entrance located at apt 4, 2nd story, 1st apartment from north at east
Nov 17, 2025 · Apt 4
Closed — Violation closed - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 30 sq ft at north, east and west walls in the 2nd room from east at north located at apt 4, 2nd story, 1st apartment from north at east
Nov 17, 2025 · Apt 4
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from east at north, the 3rd room from east at south located at apt 3, 2nd story, 1st apartment from south at west
Jul 15, 2025 · Apt 3
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 3rd room from east at south located at apt 3, 2nd story, 1st apartment from south at west
Jul 15, 2025 · Apt 3
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lower sash lock at the west in the 3rd room from east at north located at apt 3, 2nd story, 1st apartment from south at west
Jul 15, 2025 · Apt 3
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective door at east in the 3rd room from east at south located at apt 3, 2nd story, 1st apartment from south at west
Jul 15, 2025 · Apt 3
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective 1st and 2nd lower windows sash lock from south at west in the 3rd room from east at south located at apt 3, 2nd story, 1st apartment from south at west
Jul 15, 2025 · Apt 3
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3, 2nd story, 1st apartment from south at west
Jul 15, 2025 · Apt 3
Open — Notice of issuance sent to tenant - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 2, 2024
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots on 2nd and 3rd story balcony at building front at fire escape
Jul 6, 2024
Open — Invalid certification - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jul 6, 2024
Open — Invalid certification - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jul 6, 2024
Open — Invalid certification - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 12, 4th story
Jul 6, 2024 · Apt 12
Open — Invalid certification - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 12, 4th story
Jul 6, 2024 · Apt 12
Open — Invalid certification - ANon-hazardous
Properly repair with similar material the broken or defective porelain enamel gaze at bathtub in the bathroom located at apt 12, 4th story
Jul 6, 2024 · Apt 12
Open — Invalid certification
DOB building violations · 24
- Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 28, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 28, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 28, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 28, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 16, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed
Show 14 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 22, 1992
Vp*-violation unserved ecb- dismissed
ECB violations · 12
- Class - 2
Work after hours without a variance permit contrary to 28-105.12.5 noted observed four men on jobsite working without a variance to conduct construction related work stop all after hours work obtain after hours
Jul 18, 2020 · Penalty $1,250
Resolve - Class - 1
Housekeeping.at time of comp inspection i observed active work in commerical store front consisting of construction work in progress.i observed inadequate housekeeping consisting of garge piles of combustible m
May 25, 2020 · Penalty $6,250
Resolve - Class - 1
Work w/o permit. noted:at time of inspection supported scaffold had been erected 40'+ on exposure #4 at the above address.dept records showsno permit at this site.rmdy:stop all work.conform to bldg code,obtain
Jan 3, 2013 · Penalty $1,600
Resolve - Class - 1
Bc3314.5-supported scaffold does not meet bldg code specifications.noted:at time of inspection platform for supported scaffold was inadequate.the platform was plywood not scaffold grade planking.nor was the pla
Jan 3, 2013 · Penalty $1,600
Resolve - Class - 1
Supported scaffold does not meet bldg code standards. noted:at time ofinspection guard rail system was inadequate on every level.the follow-ing items were missing:1-top rails;2-midrails;3-toe boards.rmdy:at tim
Jan 3, 2013 · Penalty $1,600
Resolve - Class - 1
Supported scaffold does not meet bldg code standards.noted:at time of inspection supported scaffold was missing cross braces.w/o cross braces ther eis nothing to stop scaffold from moving laterally.rmdy:stop al
Jan 3, 2013 · Penalty $1,600
Resolve - Class - 1
Bc3314.12.4 supported scaffold does not meet building code standards. noted:at time of inspection uprights/poles for wooden scaffold were inadequate.the ends did not set square on one another and there was no s
Jan 3, 2013 · Penalty $800
Resolve - Class - 3
Failure to maintain bldg wall(s) or appurtenances noted: at exposure#11st flr store front window (santos furniture) is broken & remainder ofglass pane endanger of falling down,large hole in glass pane & cracked
Nov 28, 2012 · Penalty $200
Resolve - Non-hazardous
Failure to carry out permitted work in accordance with applicable laws & reg in that const. activities are being performed other than on weekdays bet hours 7 am to 6 pm w/o a variance as required by section 24-
Sep 19, 2004 · Penalty $200
Resolve - Hazardous
Exit door total obstruction (exit door leading to roof is totally obstructed by roofing material and misc tools remedy:remove obstrcution forthwith
Jun 9, 2004 · Penalty $480
Resolve
Show 2 more ↓
- Hazardous
Exit passageway or corridor total obstruction noted: (1) stair well leading to roof exit has misc roofing material & tools on stairs from 1st step to top steps (2) orange extension cord used as roping to block
Jun 9, 2004 · Penalty $480
Resolve - Non-hazardous
Work w/out a permit.work noted:removing approx 25 to 30 feet of parapet (brick)wall at roof.remedy:stop all work.obtain all necessary permits
Mar 19, 2004 · Penalty $800
Resolve
Complaints
- General
Signage missing
Aug 27, 2026 · Apt BLDG
Open - Unsanitary condition
Pests
May 28, 2026 · Apt 12
Close - General
Bell/buzzer/intercom
May 28, 2026 · Apt 12
Close - Unsanitary condition
Pests
May 28, 2026 · Apt 12
Close - Heat/hot water
Entire building
Feb 4, 2026 · Apt 2
Close - Plumbing
Radiator
Jan 30, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Jan 30, 2026 · Apt 2
Close - Plumbing
Water supply
Jan 30, 2026 · Apt 2
Close - General
Cabinet
Nov 13, 2025 · Apt 4
Close - Water leak
Slow leak
Nov 13, 2025 · Apt 4
Close
Show 40 more ↓
- Electric
Lighting
Nov 13, 2025 · Apt 4
Close - General
Bell/buzzer/intercom
Nov 13, 2025 · Apt SECOND
Close - Unsanitary condition
Mold
Nov 13, 2025 · Apt 4
Close - Unsanitary condition
Pests
Jun 27, 2025 · Apt 3
Close - Unsanitary condition
Pests
Jun 21, 2024 · Apt 1
Close - Appliance
Electric/gas range
Jun 21, 2024 · Apt 1
Close - Unsanitary condition
Pests
Jun 21, 2024 · Apt 1
Close - Unsanitary condition
Mold
Jun 21, 2024 · Apt 1
Close - Heat/hot water
Apartment only
May 11, 2024 · Apt 1
Close - Appliance
Electric/gas range
May 8, 2024 · Apt 1
Close - Plumbing
Basin/sink
May 8, 2024 · Apt 1
Close - Heat/hot water
Apartment only
May 8, 2024 · Apt 1
Close - Water leak
Slow leak
Sep 18, 2023 · Apt 12
Close - Unsanitary condition
Pests
Sep 18, 2023 · Apt 12
Close - Unsanitary condition
Pests
Sep 18, 2023 · Apt 12
Close - Unsanitary condition
Mold
Sep 18, 2023 · Apt 12
Close - Heat/hot water
Entire building
Apr 21, 2022 · Apt BLDG
Close - Electric
Power outage
Apr 21, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 20, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Apr 20, 2022 · Apt 8
Close - Heat/hot water
Entire building
Apr 14, 2022 · Apt BLDG
Close - Plumbing
Water supply
Apr 13, 2022 · Apt 7
Close - Heat/hot water
Entire building
Apr 12, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 12, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 7, 2022 · Apt 1
Close - Water leak
Heavy flow
Jun 8, 2021 · Apt 10
Close - Unsanitary condition
Pests
Feb 19, 2019 · Apt 2
Close - Water leak
Heavy flow
Feb 19, 2019 · Apt 2
Close - Water leak
Heavy flow
Feb 19, 2019 · Apt 2
Close - Heat/hot water
Apartment only
Feb 19, 2019 · Apt 2
Close - Heat/hot water
Entire building
Dec 16, 2018 · Apt 4
Close - Heat/hot water
Entire building
Dec 4, 2018 · Apt 10
Close - Heat/hot water
Entire building
Nov 11, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 9, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 8, 2017 · Apt BLDG
Close - Safety
Smoke detector
Dec 2, 2016 · Apt 7
Close - Safety
Carbon monoxide detector
Dec 2, 2016 · Apt 7
Close - Heating
Heat related
Nov 24, 2013 · Apt 6
Close - Plumbing
Bathtub/shower
Jan 19, 2010 · Apt 7
Close - Plumbing
Basin/sink
Jan 19, 2010 · Apt 7
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1950
- Floors
- 4
- Residential units
- 12
- Building area
- 13,946 ft²
- Lot area
- 6,235 ft²
- Zoning
- R5B
- Community board
- 407
- Council district
- 19
- Block / lot
- 4085 / 59
- Assessed value
- $886,050
- Landmark / historic district
- No
HPD registration #422455, last renewed Aug 22, 2025.
Questions about 14-21 College Point Blvd
Who owns 14-21 College Point Blvd?
The owner of record in NYC Department of City Planning PLUTO data is C.p.y. Realty Group LLC.
Does 14-21 College Point Blvd have violations?
Yes. NYC HPD has recorded 149 housing violations at this property.
Is 14-21 College Point Blvd rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 14-21 College Point Blvd built?
City records list 1950 as the year it was built.
How many apartments are in 14-21 College Point Blvd?
It has 12 residential units and 14 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.