15-24 College Point Blvd
Queens, NY 11356BBL 4-04076-0022Map
Owner of record: S.h Marketing Group, LLC
15-24 College Point Blvd is a mixed residential and retail building built in 1925 in Queens, 11356. It has 3 residential units across 3 floors. The owner of record is S.h Marketing Group, LLC. HPD has recorded 19 housing violations here, most recently on April 28, 2017. 19 of the 19 most recent violations are still open.
- HPD violations
- 19
- DOB violations
- 3
- ECB violations
- 3
- HPD complaints
- 32
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 19
- BHazardous
Properly repair the broken or defective bell and buzzer system in the entire apartment located at apt fl3, 3rd story
Apr 28, 2017 · Apt FL3
Open — Nov sent out - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt fl3, 3rd story
Apr 28, 2017 · Apt FL3
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures .. in the entire apartment located at apt fl3, 3rd story
Apr 28, 2017 · Apt FL3
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls, ceilings and wood trims throughout in the entire apartment located at apt fl3, 3rd story
Apr 28, 2017 · Apt FL3
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt fl3, 3rd story
Apr 28, 2017 · Apt FL3
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 1st room from east located at apt fl3, 3rd story
Apr 28, 2017 · Apt FL3
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the south wall in the private hallway located at apt fl3, 3rd story
Apr 28, 2017 · Apt FL3
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the private hallway located at apt fl3, 3rd story
Apr 28, 2017 · Apt FL3
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 2nd room from east at north located at apt fl3, 3rd story
Apr 28, 2017 · Apt FL3
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 2nd room from east at south located at apt fl3, 3rd story
Apr 28, 2017 · Apt FL3
Open — Nov sent out
Show 9 more ↓
- CImmediately hazardous
Replace the broken or defective water-closet in the 2nd bathroom from east located at apt fl3, 3rd story
Apr 28, 2017 · Apt FL3
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tile walls throughout in the 2nd bathroom from east located at apt fl3, 3rd story
Apr 28, 2017 · Apt FL3
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective the ceramic tile floor in the 2nd bathroom from east located at apt fl3, 3rd story
Apr 28, 2017 · Apt FL3
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of an accumulation of broken concrete and ceramic tiles in the 2nd bathroom from east located at apt fl3, 3rd story
Apr 28, 2017 · Apt FL3
Open — Nov sent out - BHazardous
Provide adequate supply of cold water for the fixtures of the bathtub and washbasin in the 2nd bathroom from east located at apt fl3, 3rd story
Apr 28, 2017 · Apt FL3
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt fl3, 3rd story
Apr 28, 2017 · Apt FL3
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of house hold items at public hall, 3rd story
Apr 28, 2017
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt fl3, 3rd story
Apr 28, 2017 · Apt FL3
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak at the ceiling throughout in the entire apartment located at apt fl3, 3rd story
Apr 28, 2017 · Apt FL3
Open — Nov sent out
DOB building violations · 3
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 28, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 28, 2017
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed
ECB violations · 3
- Class - 2
Failure to maintain building in code-compliant manner. at time of inspection it was observed that a cmu wall at basement level area had cracks and mortar cracks causing water to protrude into building. rem: rep
Oct 30, 2017 · Penalty $530
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. re: prohibited fitting. i observed in cellar boiler room several bushings on gas line for boilers & water heaters which are prohibited & not code compliant.
Apr 1, 2017 · Penalty $1,000
Resolve - Class - 1
Work w/o a permit. i observed in cellar & boiler room newly installed gas piping,fittings & fresh pipe sealent which was attached to new hot water heaters & new boilers. which had all new water,flu & gas connec
Apr 1, 2017 · Penalty $800
Resolve
Complaints
- Appliance
Electric/gas range
Apr 17, 2017 · Apt FL3
Close - General
Bell/buzzer/intercom
Apr 17, 2017 · Apt FL3
Close - Heat/hot water
Apartment only
Apr 17, 2017 · Apt FL3
Close - Water leak
Slow leak
Apr 13, 2017 · Apt 3FL
Close - General
Bell/buzzer/intercom
Apr 12, 2017 · Apt 3
Close - Heat/hot water
Apartment only
Apr 12, 2017 · Apt 3
Close - General
Cooking gas
Apr 12, 2017 · Apt 3
Close - Heat/hot water
Apartment only
Mar 31, 2017 · Apt 3
Close - General
Cooking gas
Mar 31, 2017 · Apt FL3
Close - Heat/hot water
Apartment only
Mar 31, 2017 · Apt FL3
Close
Show 22 more ↓
- Appliance
Electric/gas range
Feb 22, 2017 · Apt 3
Close - Paint/plaster
Wall
Feb 22, 2017 · Apt 3
Close - Plumbing
Basin/sink
Feb 22, 2017 · Apt 3
Close - Plumbing
Bathtub/shower
Feb 22, 2017 · Apt 3
Close - Flooring/stairs
Floor
Feb 22, 2017 · Apt 3
Close - Plumbing
Toilet
Feb 19, 2017 · Apt 3
Close - Plumbing
Water supply
Feb 19, 2017 · Apt 3
Close - Plumbing
Water supply
Feb 19, 2017 · Apt 3
Close - Heat/hot water
Apartment only
Feb 19, 2017 · Apt 3
Close - Heat/hot water
Apartment only
Feb 19, 2017 · Apt 3
Close - Paint/plaster
Wall
Feb 19, 2017 · Apt 3
Close - Flooring/stairs
Floor
Feb 19, 2017 · Apt 3
Close - Heat/hot water
Entire building
Dec 28, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 23, 2016 · Apt 2
Close - Plumbing
Water supply
Jan 11, 2016 · Apt BLDG
Close - Electric
Power outage
Jan 9, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 1, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 28, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 19, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2015 · Apt 3
Close - Heat/hot water
Entire building
Dec 22, 2014 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 2, 2014 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S3)
- Year built
- 1925
- Floors
- 3
- Residential units
- 3
- Building area
- 3,030 ft²
- Lot area
- 2,500 ft²
- Zoning
- R5B
- Community board
- 407
- Council district
- 19
- Block / lot
- 4076 / 22
- Assessed value
- $396,900
- Landmark / historic district
- No
Questions about 15-24 College Point Blvd
Who owns 15-24 College Point Blvd?
The owner of record in NYC Department of City Planning PLUTO data is S.h Marketing Group, LLC.
Does 15-24 College Point Blvd have violations?
Yes. NYC HPD has recorded 19 housing violations at this property.
Is 15-24 College Point Blvd rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 15-24 College Point Blvd built?
City records list 1925 as the year it was built.
How many apartments are in 15-24 College Point Blvd?
It has 3 residential units and 4 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.