roofy

15-04 College Point Blvd

Queens, NY 11356BBL 4-04076-0015Map

Owner of record: Cp Realty Group LLC

15-04 College Point Blvd is a mixed residential and retail building built in 1925 in Queens, 11356. It has 4 residential units across 3 floors. The owner of record is Cp Realty Group LLC. HPD has recorded 68 housing violations here, most recently on May 7, 2026. 2 of the 50 most recent violations are still open.

HPD violations
68
DOB violations
6
ECB violations
4
HPD complaints
38

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation May 7, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 68

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 7, 2026

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 12, 2025

    Closed — Violation dismissed
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioner protruding beyond window sill at 3rd story balcony at 1st stack from north at east (building front) at fire escape

    Jan 4, 2025

    Open — Nov sent out
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household items at 2nd story balcony at 1st stack from north at east (building front) at fire escape

    Jan 4, 2025

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 15, 2024

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 29, 2023

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 15, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 4, 2022

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Mar 4, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 15, 2021

    Closed — Violation dismissed
Show 40 more ↓
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 1, 2019

    Closed — Violation dismissed
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes house hold items all stories at west yard at fire escape

    Jul 24, 2016

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the kitchenette located at apt 3f, 3rd story, 1st apartment from east at south

    May 17, 2016 · Apt 3F

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from north at east wall in the 1st room from east at north located at apt 3f, 3rd story, 1st apartment from east at south

    May 17, 2016 · Apt 3F

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 3f, 3rd story, 1st apartment from east at south

    May 17, 2016 · Apt 3F

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 1st room from east at south located at apt 3f, 3rd story, 1st apartment from east at south

    May 17, 2016 · Apt 3F

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door frame in the private hallway located at apt 3f, 3rd story, 1st apartment from east at south

    May 17, 2016 · Apt 3F

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from north at east wall, 1st window frame from north at east wall in the 1st room from east at north located at apt 3f, 3rd story, 1st apartment from east at south

    May 17, 2016 · Apt 3F

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall, east wall in the kitchenette located at apt 3f, 3rd story, 1st apartment from east at south

    May 17, 2016 · Apt 3F

    Closed — Violation closed
  • A

    Properly repair the broken or defective improperly counter balance lower sash at east 1 window in the 1st room from east at south located at apt 3f, 3rd story, 1st apartment from east at south

    May 17, 2016 · Apt 3F

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, east wall in the 1st room from east at south located at apt 3f, 3rd story, 1st apartment from east at south

    May 17, 2016 · Apt 3F

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the wainscotting at north wall, 1st radiator from north at east wall, 1st window sash from north at east wall, 2nd window frame from north at east wall in the 1st room from east at south located at apt 3f, 3rd story, 1st apartment from east at south

    May 17, 2016 · Apt 3F

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from north at east wall in the 1st room from east at south located at apt 3f, 3rd story, 1st apartment from east at south

    May 17, 2016 · Apt 3F

    Closed — Violation closed
  • C

    Fire escape defective. replace with new the broken, defective and/or missing goose neck ladder at extension roof rear fire escape

    May 13, 2016

    Closed — Violation closed
  • B

    M/d law abate the nuisance consisting of air conditioner installed at fire escape window obstructing egress in the 1st room from east at south located at apt 3f, 3rd story, 1st apartment from east at south

    May 13, 2016 · Apt 3F

    Closed — Violation dismissed
  • B

    Remove all encumbrances consisting of house hold items at public hall, 3rd story

    May 13, 2016

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of trip hazard from metal piece protuding at rear extesion roof

    May 13, 2016

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of exhaust vents obstructing access to goose neck ladder at rear extension roof

    May 13, 2016

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceilings in the entire apartment located at apt 2r, 2nd story, 2nd apartment from east at south

    Feb 21, 2016 · Apt 2R

    Closed — Violation closed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color the plaster ceiling 40 sq.ft in the kitchen located at apt 2r, 2nd story, 2nd apartment from east at south

    Feb 21, 2016 · Apt 2R

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd kitchen from east, the private hallway located at apt 3f, 3rd story, 1st apartment from north at east

    Dec 8, 2015 · Apt 3F

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color , north wall, east wall, south wall in the 3rd bathroom from east located at apt 3f, 3rd story, 1st apartment from east at south

    Dec 8, 2015 · Apt 3F

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the 3rd bathroom from east located at apt 3f, 3rd story, 1st apartment from east at south

    Dec 8, 2015 · Apt 3F

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 1; no stops in the 1st room from east at south located at apt 3f, 3rd story, 1st apartment from east at south

    Dec 8, 2015 · Apt 3F

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 1; missing stops in the 1st room from east at north located at apt 3f, 3rd story, 1st apartment from east at south

    Dec 8, 2015 · Apt 3F

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from west at north wall in the 1st room from east at south located at apt 3f, 3rd story, 1st apartment from north at east

    Dec 8, 2015 · Apt 3F

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) east wall, 1st window frame from north at east wall in the 1st room from east at north located at apt 3f, 3rd story, 1st apartment from north at east

    Dec 8, 2015 · Apt 3F

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from west at north wall, west wall in the 3rd bathroom from east located at apt 3f, 3rd story, 1st apartment from north at east

    Dec 8, 2015 · Apt 3F

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation , 1st radiator from west at north wall in the 3rd bathroom from east located at apt 3f, 3rd story, 1st apartment from east at south

    Dec 8, 2015 · Apt 3F

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation , 1st radiator from north at east wall in the 1st room from east at south located at apt 3f, 3rd story, 1st apartment from east at south

    Dec 8, 2015 · Apt 3F

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department , 2nd window frame from north at east wall, 1st window frame from north at east wall, 1st door from west at north wall in the 1st room from east at south located at apt 3f, 3rd story, 1st apartment from east at south

    Dec 8, 2015 · Apt 3F

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation , 1st radiator from north at east wall in the 1st room from east at north located at apt 3f, 3rd story, 1st apartment from east at south

    Dec 8, 2015 · Apt 3F

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3f, 3rd story, 1st apartment from north at east

    Dec 3, 2015 · Apt 3F

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 16, 2015

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department ceiling in the entire apartment located at apt 2r, 2nd story

    Mar 4, 2015 · Apt 2R

    Closed — Violation dismissed
  • B

    Abate the nuisance consisting of mice in the entire apartment located at apt 2r, 2nd story

    Mar 4, 2015 · Apt 2R

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective mail boxes at lobby, 1st story

    Mar 4, 2015

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer located at apt 3r, 3rd story, 2nd apartment from east at south

    Feb 21, 2015 · Apt 3R

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from east at south located at apt 3r, 3rd story, 2nd apartment from east at south

    Feb 21, 2015 · Apt 3R

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st window frame from south at west wall, 2nd window frame from south at west wall in the 3rd room from east at south located at apt 3r, 3rd story, 2nd apartment from east at south

    Feb 21, 2015 · Apt 3R

    Closed — Violation dismissed

DOB building violations · 6

  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 10, 2016

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed

ECB violations · 4

  • Class - 2

    Failure to comply w/the comm's order contained in nov #35179880h issued on 05/18/16 & to file a cert of correction pursuant to 28-201.1,28-204.4 & 1rcny 102-01.noted:rear fire escape @exp#3 cardboard boxes & a

    Jun 30, 2016

    Resolve
  • Class - 1

    Failure to provide unobstructed exit passageway. noted: at the time ofmy inspection,rear fire escape at exp#3 had cardboard boxes & a roll of roofing material stored on it. also at the stair cable wiring was

    May 18, 2016 · Penalty $6,000

    Resolve
  • Class - 2

    Failure to maintain exterior walls & appurtenances.(fire escape ladder)noted: at the time of my inspection,at exp#3,fire escape ladder for 1st sty roof top is not properly secured to the roof. only 1"goose neck

    May 18, 2016 · Penalty $2,500

    Resolve
  • Hazardous

    Failure to maintain bldg"haz" defects noted: at rear of premises dryer vents from 1st fl laundromat are less than 10'(3.050m) from 2nd fl apt window in same bldg. remedy:repair defects forthwith,make safe

    Mar 9, 2007

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Jan 3, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Jan 3, 2025 · Apt 3R

    Close
  • Heat/hot water

    Entire building

    Jan 2, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 27, 2017 · Apt 2R

    Close
  • Heat/hot water

    Entire building

    Feb 15, 2016 · Apt 2R

    Close
  • Plumbing

    Water supply

    Feb 15, 2016 · Apt 2R

    Close
  • Heat/hot water

    Entire building

    Jan 26, 2016 · Apt 2R

    Close
  • Heat/hot water

    Entire building

    Dec 5, 2015 · Apt 2R

    Close
  • Heat/hot water

    Apartment only

    Nov 30, 2015 · Apt 3F

    Close
  • Heat/hot water

    Apartment only

    Feb 20, 2015 · Apt 3R

    Close
Show 28 more ↓
  • Door/window

    Window frame

    Feb 20, 2015 · Apt 3R

    Close
  • Door/window

    Window frame

    Feb 20, 2015 · Apt 3R

    Close
  • Door/window

    Window frame

    Feb 15, 2015 · Apt 3R

    Close
  • Heat/hot water

    Entire building

    Feb 15, 2015 · Apt 3R

    Close
  • Heat/hot water

    Entire building

    Jan 31, 2015 · Apt 3R

    Close
  • Unsanitary condition

    Pests

    Jan 10, 2015 · Apt 2R

    Close
  • Heat/hot water

    Entire building

    Jan 10, 2015 · Apt 2R

    Close
  • Water leak

    Heavy flow

    Jan 10, 2015 · Apt 2R

    Close
  • Door/window

    Door

    Jan 10, 2015 · Apt 2R

    Close
  • General

    Mailbox

    Jan 10, 2015 · Apt 2R

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jan 10, 2015 · Apt 2R

    Close
  • Heat/hot water

    Entire building

    Jan 10, 2015 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 10, 2015 · Apt 3F

    Close
  • General

    Floor

    Apr 2, 2012 · Apt 2R

    Close
  • Electric

    Bell-buzzer/intercom

    Apr 2, 2012 · Apt 2R

    Close
  • Nonconst

    Vermin

    Apr 2, 2012 · Apt 2R

    Close
  • Electric

    Bell-buzzer/intercom

    Mar 22, 2012 · Apt BLDG

    Close
  • Heating

    Heat related

    Feb 2, 2012 · Apt 2R

    Close
  • Heating

    Heat related

    Jan 30, 2012 · Apt 2R

    Close
  • Heating

    Heat related

    Jan 30, 2012 · Apt BLDG

    Close
  • Heating

    Heat related

    Jan 27, 2012 · Apt 3R

    Close
  • Heating

    Heat related

    Jan 26, 2012 · Apt 3R

    Close
  • Heating

    Heat related

    Jan 26, 2012 · Apt 3R

    Close
  • Heating

    Heat related

    Jan 26, 2012 · Apt BLDG

    Close
  • Heating

    Heat related

    Jan 26, 2012 · Apt BLDG

    Close
  • Heating

    Heat related

    Jan 25, 2012 · Apt 3R

    Close
  • Heating

    Heat related

    Jan 25, 2012 · Apt BLDG

    Close
  • Heating

    Heat related

    Jan 20, 2012 · Apt 3F

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Mixed residential and retail building (S4)
Year built
1925
Floors
3
Residential units
4
Building area
3,720 ft²
Lot area
2,500 ft²
Zoning
R5B
Community board
407
Council district
19
Block / lot
4076 / 15
Assessed value
$486,900
Landmark / historic district
No

HPD registration #419942, last renewed Oct 22, 2025.

Questions about 15-04 College Point Blvd

Who owns 15-04 College Point Blvd?

The owner of record in NYC Department of City Planning PLUTO data is Cp Realty Group LLC.

Does 15-04 College Point Blvd have violations?

Yes. NYC HPD has recorded 68 housing violations at this property.

Is 15-04 College Point Blvd rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 15-04 College Point Blvd built?

City records list 1925 as the year it was built.

How many apartments are in 15-04 College Point Blvd?

It has 4 residential units and 5 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.