roofy

78-49 65 Street

Queens, NY 11385BBL 4-03724-0068Map

Owner of record: Filpo, Carmen

78-49 65 Street is a two-family home built in 1920 in Queens, 11385. It has 2 residential units across 2.5 floors. The owner of record is Filpo, Carmen. HPD has recorded 20 housing violations here, most recently on October 21, 2023. 2 of the 20 most recent violations are still open.

HPD violations
20
DOB violations
0
ECB violations
0
HPD complaints
13

What to know

Concern
2 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Oct 21, 2023

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 20

  • C

    Replace with new the missing entrance door at 1st story in the entrance located at apt 2fl, 2nd story, apartment at east

    Oct 21, 2023 · Apt 2FL

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... approx 1 square feet around window in the bathroom located at apt 2fl, 2nd story, apartment at east

    Oct 21, 2023 · Apt 2FL

    Closed — Violation closed
  • C

    Trace and repair the source and abate the visible mold condition... approx 50 sq.ft at ceiling in the bathroom located at apt floor2, 2nd story, 1st apartment from north at east

    Sep 26, 2023 · Apt FLOOR2

    Closed — Violation closed
  • C

    Replace with new the missing apartment entrance door at 1st story in the entrance located at apt floor2, 2nd story, 1st apartment from north at east

    Sep 26, 2023 · Apt FLOOR2

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling at public hall, 1st story

    Sep 26, 2023

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt floor2, 2nd story, 1st apartment from north at east

    Sep 26, 2023 · Apt FLOOR2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the kitchen located at apt floor2, 2nd story, 1st apartment from north at east

    Sep 26, 2023 · Apt FLOOR2

    Closed — Violation closed
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt floor2, 2nd story, 1st apartment from north at east

    Sep 26, 2023 · Apt FLOOR2

    Open — Nov certified late
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Aug 31, 2023

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st closet from south at west wall door, 1st door from west at north wall, 1st window frame from east at south wall in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Aug 28, 2023 · Apt 2NDFLO

    Closed — Violation closed
Show 10 more ↓
  • A

    Paint with light colored paint to the satisfaction of this department the 1st closet from north at east wall door in the private hallway located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Aug 28, 2023 · Apt 2NDFLO

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Aug 28, 2023 · Apt 2NDFLO

    Closed — Violation closed
  • C

    Abate the nuisance consisting of hot water exceeding 130 degrees maximum allowable at all fixtures in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Aug 28, 2023 · Apt 2NDFLO

    Closed — Violation closed
  • C

    Trace and repair the source and abate the visible mold condition... on ceiling (approx 45 sq ft) in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Aug 28, 2023 · Apt 2NDFLO

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling, north wall at public hall, 1st story

    Aug 28, 2023

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling, north wall at public hall, 1st story

    Aug 28, 2023

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Aug 28, 2023 · Apt 2NDFLO

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, 1st closet from south at west wall door frame, 1st door frame from west at north wall in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Aug 28, 2023 · Apt 2NDFLO

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door frame in the private hallway located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Aug 28, 2023 · Apt 2NDFLO

    Closed — Violation closed
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Aug 28, 2023 · Apt 2NDFLO

    Open — Nov certified late

DOB building violations · 0

No DOB violations on record

ECB violations · 0

No ECB violations on record

Complaints

  • Door/window

    Door

    Nov 3, 2023 · Apt 2NDFLO

    Close
  • Appliance

    Electric/gas range

    Nov 3, 2023 · Apt 2NDFLO

    Close
  • Heat/hot water

    Apartment only

    Nov 3, 2023 · Apt 2NDFLO

    Close
  • Unsanitary condition

    Mold

    Nov 3, 2023 · Apt 2NDFLO

    Close
  • Unsanitary condition

    Mold

    Sep 25, 2023 · Apt FLOOR2

    Close
  • Paint/plaster

    Wall

    Sep 25, 2023 · Apt FLOOR2

    Close
  • Plumbing

    Water supply

    Sep 25, 2023 · Apt FLOOR2

    Close
  • Unsanitary condition

    Mold

    Aug 24, 2023 · Apt 2NDFLO

    Close
  • Paint/plaster

    Wall

    Aug 24, 2023 · Apt 2NDFLO

    Close
  • Safety

    Smoke detector

    Aug 24, 2023 · Apt 2NDFLO

    Close
Show 3 more ↓
  • Electric

    Power outage

    Aug 24, 2023 · Apt 2NDFLO

    Close
  • Water leak

    Slow leak

    Aug 24, 2023 · Apt 2NDFLO

    Close
  • Unsanitary condition

    Pests

    Aug 24, 2023 · Apt 2NDFLO

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Two-family home (B2)
Year built
1920
Floors
2.5
Residential units
2
Building area
1,264 ft²
Lot area
2,000 ft²
Zoning
R3A
Community board
405
Council district
30
Block / lot
3724 / 68
Assessed value
$51,660
Landmark / historic district
No

HPD registration #926671, last renewed Oct 19, 2023.

Questions about 78-49 65 Street

Who owns 78-49 65 Street?

The owner of record in NYC Department of City Planning PLUTO data is Filpo, Carmen.

Does 78-49 65 Street have violations?

Yes. NYC HPD has recorded 20 housing violations at this property.

Is 78-49 65 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 78-49 65 Street built?

City records list 1920 as the year it was built.

How many apartments are in 78-49 65 Street?

It has 2 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.