1668 George Street
Queens, NY 11385BBL 4-03552-0046Map
Owner of record: 1668 George Street LLC
1668 George Street is a walk-up apartment building built in 1931 in Queens, 11385. It has 4 residential units across 2 floors. The owner of record is 1668 George Street LLC. HPD has recorded 40 housing violations here, most recently on March 4, 2022. 23 of the 40 most recent violations are still open.
- HPD violations
- 40
- DOB violations
- 0
- ECB violations
- 3
- HPD complaints
- 9
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 40
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 4, 2022
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing at public hall, 1st story
Feb 5, 2022
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water temperature of 145 degrees, exceeding the maximum allowable temperature of 130 degrees in the entire apartment located at apt 2r, 2nd story, 2nd apartment from east at south
Feb 5, 2022 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2r, 2nd story, 2nd apartment from east at south
Feb 5, 2022 · Apt 2R
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2l, 2nd story, 1st apartment from north at east
Feb 5, 2022 · Apt 2L
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2l, 2nd story, 1st apartment from north at east
Feb 5, 2022 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water temperature of 145 degrees; exceeding the maximum allowable temperature of 130 degrees in the entire apartment located at apt 2l, 2nd story, 1st apartment from north at east
Feb 5, 2022 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Feb 5, 2022
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2l, 2nd story, 1st apartment from north at east
Feb 5, 2022 · Apt 2L
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 15, 2021
Closed — Violation dismissed
Show 30 more ↓
- BHazardous
Repair or replace the smoke detector missing located at apt 2l, 2nd story, 2nd apartment from north at east
Jan 20, 2020 · Apt 2L
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Jan 20, 2020
Open — Nov sent out - BHazardous
Fire egress defective. make stationary the iron ladder leading to scuttle opening in roof .. at public hall, 2nd story
Jan 20, 2020
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at public hall, 1st story
Jan 20, 2020
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 2l, 2nd story, 2nd apartment from north at east
Jan 20, 2020 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Arrange and make self-closing the doors .. in the entrance located at apt 2l, 2nd story, 2nd apartment from north at east
Jan 20, 2020 · Apt 2L
Open — Nov sent out - CImmediately hazardous
Remove the illegal double cylinder key operated locking device at door .. in the entrance located at apt 2l, 2nd story, 2nd apartment from north at east
Jan 20, 2020 · Apt 2L
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 2l, 2nd story, 2nd apartment from north at east
Jan 20, 2020 · Apt 2L
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jan 20, 2020
Open — Nov sent out - CImmediately hazardous
Arrange and make self-closing the doors boiler room door at boiler room
Jan 20, 2020
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st story
Jan 20, 2020
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jan 20, 2020
Open — Nov sent out - CImmediately hazardous
Arrange and make self-closing the doors at entrance located at apt 2l, 2nd story, 1st apartment from north at east
Dec 5, 2019 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Cleanse and disinfect to the satisfaction of this department after removing the rubbish and standing water cellar front and center
Dec 5, 2019
Closed — Violation closed - BHazardous
Fire egress defective. make stationary the iron ladder leading to scuttle opening in roof at 2nd story, public hall
Dec 5, 2019
Open — Nov sent out - CImmediately hazardous
Properly repair the broken or defective locks at vestibule door, 1st story
Dec 5, 2019
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder lock at building front, entrance door
Dec 5, 2019
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items, 2nd story, public hall
Dec 5, 2019
Open — Nov sent out - CImmediately hazardous
Code: arrange and make self-closing the doors leading to cellar, 1st story, public hall
Dec 5, 2019
Closed — Violation closed - CImmediately hazardous
Code: arrange and make self-closing the doors boiler room
Dec 5, 2019
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 2l, 2nd story, 1st apartment from north at east
Dec 5, 2019 · Apt 2L
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing located at apt 2l, 2nd story, 1st apartment from north at east
Dec 5, 2019 · Apt 2L
Open — Nov sent out - CImmediately hazardous
Remove the illegal double cylinder key operated locking device at door ..entrance located at apt 2l, 2nd story, 1st apartment from north at east
Dec 5, 2019 · Apt 2L
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit located at apt 2l, 2nd story, 1st apartment from north at east
Dec 5, 2019 · Apt 2L
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening a double cylinder key operated lock installed at the building entrance door
Nov 27, 2019
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Nov 27, 2019
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Nov 27, 2019
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Nov 27, 2019
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 5, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 21, 2016
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 3
- Hazardous
Residence altered for occupancy as a dwelling for more than legally approved # of families.bldg. dept. records indicates residence is legally approved for occupancy by 4 families residence now altered for occup
Mar 30, 2000 · Penalty $3,050
Resolve - Hazardous
Occupancy contrary to that allowed by bldg. dept. records. illegal occupancy noted:legal 4 family dwelling converted to an illegal five family dwelling.note:at cellar level full partition walls erected creating
Mar 30, 2000
Resolve - Non-hazardous
Work w/o a permit.work noted:at cellar level full partition walls erected creating rooms, kitchen area with gas sotve and sink in counter, 3 pc. bathroom (tub, toilet, and skin)installed w/o permits on file wit
Mar 30, 2000 · Penalty $800
Resolve
Complaints
- Heat/hot water
Entire building
Nov 18, 2022 · Apt 2L
Close - Heat/hot water
Entire building
Nov 16, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 2, 2022 · Apt 2L
Close - Heat/hot water
Entire building
Jan 28, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 17, 2020 · Apt 2L
Close - Heat/hot water
Entire building
Dec 4, 2019 · Apt 2L
Close - Heat/hot water
Entire building
Nov 29, 2019 · Apt 2L
Close - Heat/hot water
Entire building
Nov 29, 2019 · Apt 2R
Close - Heat/hot water
Apartment only
Nov 23, 2019 · Apt 2L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C3)
- Year built
- 1931
- Floors
- 2
- Residential units
- 4
- Building area
- 3,250 ft²
- Lot area
- 2,523 ft²
- Zoning
- R5B
- Community board
- 405
- Council district
- 34
- Block / lot
- 3552 / 46
- Assessed value
- $445,050
- Landmark / historic district
- No
HPD registration #407071, last renewed Jul 17, 2026.
Questions about 1668 George Street
Who owns 1668 George Street?
The owner of record in NYC Department of City Planning PLUTO data is 1668 George Street LLC.
Does 1668 George Street have violations?
Yes. NYC HPD has recorded 40 housing violations at this property.
Is 1668 George Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1668 George Street built?
City records list 1931 as the year it was built.
How many apartments are in 1668 George Street?
It has 4 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.